英语人>网络例句>timing chart 相关的网络例句
timing chart相关的网络例句

查询词典 timing chart

与 timing chart 相关的网络例句 [注:此内容来源于网络,仅供参考]

So I want to show you this chart because it talks about Yahoos strategy and where we want to be as a company.

我给大家展示这个图表是因为它描述了 Yahoo 的战略以及我们的公司将向哪里去。

Sometimes energy zings into your opposite house of the chart, so rather than have your career bring unanticipated news, you may instead be focused on your physical home, real estate, or a family member, most likely a parent.

因为你也是双子座,你可能会明显感觉到水星逆行的效果,比水星在其他星座逆行的感觉更明显。

Sometimes energy zings into your opposite house of the chart, so rather than have your career bring unanticipated news, you may instead be focused on your physical home, real estate, or a family member, most likely a parent.

非常偶然,在新月的同一天,也就是4月24号,水星和天王星有了和谐角度。因为水星是你的守护星,双子们,这个角度必然会带来欢乐的消息。以前一直隐藏的东西一下子浮出水面。或者,你会接到良好的事业消息。

Those with the most numbers of protons and neutrons are in the upper right portion of the chart.

那些最数目的质子和中子都在右上部分的图表。

One of the pamphlets I used gives a chart showing the increase in the costs of government.

在我用的一本手册中,有一张图表说明政府费用的增加。

A program chart of the whole TSP system is presented.

编制了完整的计算程序。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

When using acid cleaning to conduct the boiler chemical cleaning,attention should be paid to protect stainless steel part (for example throttle chart,thermometer wrap,steam sample device and so on) and prevent intergranular corrosion.

采用酸洗法进行锅炉化学清洗时,应注意不锈钢部件(如节流图、温度表套、汽水取样装置等)的防护,防止不锈钢的晶见腐蚀。

The dust-precipipitator's shell is all-steel structure,so must according to strictly design chart to install and acceptance.

本除尘器为全钢结构外壳,因此必须严格按照设计图纸安装与验收。

第262/304页 首页 < ... 258 259 260 261 262 263 264 265 266 ... > 尾页
相关中文对照歌词
Timing Is Everything
Perfect Timing
River Of Brakelights
Timing Is Everything (Acoustic)
Timing Is Everything
Timing Is Crucial
Start Well
Good Timing
Timelines
Timing Is Everything
推荐网络例句

Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.

目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。

On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.

一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。

What is the topic sentence of this article?

这篇文章中心的句子是那一句?