查询词典 time-base control
- 与 time-base control 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
To overcome the quadratic variation terms of stochastic control and the uncontrollability in chained system, a novel control design procedure is constructively proposed, which involves the introduction of a time-varying technique and the application of quartic Lyapunov function.
为了克服随机控制过程中出现的平方漂移项以及链式
-
So during the collection of fault sample data and checking data, the paper sets up the mathematics model of control system first. We cause all kinds of fault in the control system, then collects a variety of fault data. After unitarily dealing, the fault data server as the sample data of training neural network. At the same time, according to the collection of checking data, it examines whether the trained neural network have the function of fault diagnosis.
在故障样本数据及检验数据的采集过程中,首先建立了控制系统的数学模型,人为地让控制系统发生各种故障,从而采集到各种故障数据,经过归一化处理后,作为训练神经网络的样本数据;同时,也采集检验数据,用以检验训练出的神经网络是否能够起到故障诊断的作用。
-
The minimal WOB cost to the patient with mechanical ventilation and the real-time control were hence fulfilled based on the implemented feedback control mechanism.
当病人的生理状态有明显的改变时,系统的回授机制受到触发,会产生一最佳化送气气流,进行重新送气,因此,此回授控制系统不仅能提供一即时性的控制,亦能促使病人在通气时维持呼吸功最小化的状态。
-
But after about a month to restore the root system, the leaves of nitrogen, phosphorus and potassium contents in treatment 5, 6, 7, 8, 2 gradually higher than the control. This is because the absorption of fertilizer during this period shown to promote on the elements, and with the passage of time the processing elements continue to be reduced to a leaf until the latter part of the growing season is also higher than the control.3.The pH value in rhizosphere soil of treatments poplar plantation were lower than that in non-rhizosphere soil, but the content of organic,available nitrogen, phosphorus, potassium, utility cuprum and utility zincum were all higher than those in non-rhizosphere soil.
但是经过大约一个月的根系恢复,处理5、处理6、处理7、处理8、处理2叶片中的N、P、K逐渐高于对照,这是因为施肥对元素的吸收在这一期间开始表现出了促进作用,并且随着时间的推移各处理中元素含量持续降低至落叶,直至后期的生长季节也高于对照。3、各处理的杨树林地根际土壤pH值均低于非根际土壤,而有机质、碱解氮、速效磷、速效钾、有效铜和有效锌的含量均高于非根际土壤,与其它处理相比,80cm两侧断根施肥处理的根际土和非根际土壤速效养分含量最高,差异达显著水平。
-
Sections of mainstreet as an example,dosigns control of the inter section of pedestrian crossing the street on the downstream signal cordination;adjusting difference to control the time of pedestrian crossing the street,consequently,signal lamp can build in the street.
本文以长春市亚泰大街部分路段为例,提出了行人过街的上下游信号交叉口协调控制的设计方案。
-
At the same time, the technonogy of lean burn, cooling turbocharger, low swirl combustion system, separated united ignition control system ,open loop injection control system and oxide catalyst etc have been used.
本文对缸内燃烧进行了一维的数值模拟分析,研究压缩比、点火提前角和进气门正时的影响;对CNG发动机的工作过程进行三维数值计算,对缸内流动等内容进行系统研究;预测可靠性的薄弱环节,提出改进措施。
-
In the later, the fixed-time control and actuated control are analysed, respectively.
在对有信号灯控制的入口匝道的分析中,分别讨论了定时控制和感应控制两种情形。
-
Firstly, the flood control regulation of TGP in Sep is computed based on the analyses on the inflow in Sep and Oct, and the risk and loss on the ahead impounding scheme is calculated and analyzed. Then, the storage level, power production and releasing discharge are achieved by computing on the electricity generation model through reservoir regulation graph. Thirdly, obstruction in channel is analyzed and the problem in the Chongqing reach is more serious in 175-145-155m scheme. The sediment aggrading process and distribution on different schemes is calculated by 1-D reservoir mathematical model. The navigation benefit is computed by navigation model. Based on above calculations, the impounding time is decided by the multi-purpose decision model, and evaluate by analytical hierarchy and balance layout model. A best impounding scheme is achieved to match the requirement of flood control electricity generation and navigation et al.
首先,在对宜昌站9、10月份来水分析的基础上,采用第2章建立的防洪优化调度子模型进行了三峡水库9月份防洪调度,分析了汛末提前不同天蓄水对防洪的影响,计算了汛末不同蓄水方案水库9月份的洪灾风险率和风险损失;接着,根据第2章建立的发电调度子模型进行了三峡水库发电调度计算,得出了不同蓄水方案下水库的坝前水位、发电量及下泄流量过程;然后,分析了175-145-155m方案下三峡水库的碍航问题,指出175-145-155m方案下重庆河段的碍航问题最为严重,通过进行不同蓄水方案下水库一维泥沙冲淤计算,得出了不同蓄水方案下库区淤积过程及分布,并通过航运调度子模型,计算了不同蓄水方案下水库的航运效益;最后,根据以上防洪、发电及航运调度计算的结果,运用第3章水沙多目标决策模型对水库的蓄水时间进行了多目标决策,并采用层次加权均衡规划模型对计算结果进行评价,得到一个能满足水库防洪、发电及航运各方面要求的最佳蓄水方案。
-
The simple, easy and quick sensor-less control of position and speed has been attainted. At the same time, in order to overcome the shortcomings of low efficiency under high speed with flux-weakening, the control idea of boost under motor status and flux-strengthening under low speed status has been proposed from structure design and performance analysis by using the motor design and transient analysis software of ANSOFT.
同时为了克服永磁同步电机高速弱磁效率低的问题,借助于ANSOFT软件电机设计和瞬态分析工具,从结构设计以及性能分析方面提出了电动时升压和低速强磁控制相结合的控制思想,基本实现了永磁同步电机高速不需弱磁的大范围高效率的运行。
-
The vehicle detection subsystem uses loop vehicle detector. The bus detection and location subsystem uses the beaconing location technology. The intelligent signal controller accomplishes real-time and adaptive traffic control. The communication subsystem accomplishes the communication among every part in the system. The system control center accomplishes the correlation and integration among subsystems.
其中,车辆检测子系统采用环形线圈检测器;公交车检测与定位子系统采用信号标杆定位技术;智能信号控制器实现实时自适应、智能化的信号控制;通信子系统完成系统中各部分之间的通信;控制中心完成各子系统之间的相互联系和集成。
- 推荐网络例句
-
I didn't watch TV last night, because it .
昨晚我没有看电视,因为电视机坏了。
-
Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.
今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。
-
I'm running my simile to an extreme.
我比喻得过头了。