英语人>网络例句>time interval 相关的网络例句
time interval相关的网络例句

查询词典 time interval

与 time interval 相关的网络例句 [注:此内容来源于网络,仅供参考]

Single factor experiments were done with the factors including the width of protrusion and the trolley's velocity, which showed that the surface frictional coefficient decreases with the width of protrusion increasing, and doesn't change with the trolley's velocity changing, which was consistent with the results of the orthogonal experiment. A theoretical model of the horizontal projection of a corrugated bionic surface's contact area was built, which showed that the contact area's horizontal projection decreases with width and interval increasing respectively and that the ratio of the contact area's horizontal projection and the vertical load decreases with the vertical load increasing. It indicated that the surface frictional coefficient decreases with the above three factors increasing respectively. Finite element modeling and analysis of interactions of a plate and soils was done using ANSYS, which showed that the plate frictional coefficient is little relative to soil elastic modulus and decreases with vertical surface pressure and that trolley's pull and vertical displacement of bionic surface's control pilot keep constant almost during the plate being pulled. Finite element modeling and analysis of interactions of a corrugated bionic surface and soils was done using ANSYS, which showed that surface frictional coefficient is little relative to soil elastic modulus and decreases with bionic surface's structural parameters and vertical pressure increasing. However, the three factors all didn't affect the surface frictional coefficient remarkably on the condition of 90% dependability. For the first time, bionic surfaces were applied to screw piles, which formed bionic screw piles, and the contrast experiments showed the bionic screw pile had certain resistance-decreasing effects.

建立了波纹型仿生曲面与土壤的接触面积的水平投影的理论模型,表明接触面积的水平投影A随着波纹型仿生曲面突起宽度、两相邻突起间距的增大而减小,接触面积的水平投影与波纹型仿生曲面表面垂直载荷之比随着波纹型仿生曲面表面垂直载荷的增大而减小,进而得出仿生曲面摩擦系数随着波纹型仿生曲面突起宽度、两相邻突起间距以及表面垂直载荷的增大而减小;利用ANSYS软件对平板与土壤的相互作用进行了有限元建模与分析,表明平板摩擦系数与土壤弹性模量关系不大,而随着表面垂直载荷的增大而减小;平板牵引过程中台车牵引力和仿生曲面控制节点垂直方向位移基本保持不变;利用ANSYS软件对波纹型仿生曲面与土壤的相互作用进行了有限元建模与分析,表明波纹型仿生曲面系数在一定范围内基本不受土壤弹性模量的影响,随着波纹型仿生曲面突起宽度、两相邻突起间距以及表面垂直载荷的增大而减小,但在可信度为90%的前提下,三个因素影响都不显著;首次将波纹型仿生曲面应用于与土壤作用方式以挤压为主的螺旋桩,形成仿生螺旋桩,并与普通螺旋桩进行了沉桩对比试验,表明波纹型仿生曲面应用于螺旋桩桩体表面具有明显的降阻作用。

The interval between the end of a disk seek and the time at which the starting block address specified in the I/O request passes the disk head.

从磁盘寻道结束开始,直到磁头旋转到I/O请求所请求的起始数据块位置止,这之间的时间间隔称为旋转延迟。

The principle of railroad trackbed inspection with GPR mounted on track vehicle is introduced. In line with requirements of exploring depth, accuracy and speed in the process of field survey, the layout of GPR survey line is put forward, the center frequency of antenna, the maximum time window, the temporal sampling interval and the space between traces are calculated according to the theoretical formulas.

介绍了使用路检车装载探地雷达对铁路路基检测的原理,结合野外探测过程中对测量深度、精度和行车速度的要求,给出了GPR现场工作测线布置的原则,理论上给出天线中心频率、时窗、采样率、测量点距的计算公式。

An interval of one day had been left between the viewing and the sale in order to give the upholsterers enough time to take down the hangings, curtains and so forth.

如果她们年纪轻轻就死了,那么她们所有的情人都会同时得到消息;因为在巴黎,一位名妓的所有情人彼此几乎都是密友。

An interval of one day had been left between the viewing and the sale in order to give the upholsterers enough time to take down the hangings

购买,不过旅馆经理说已经有很多人表示对它有兴趣。旅馆期望哪天有某浪漫的人会首先买下这种酒。

An interval of one day had been left between the viewing and the sale in order to give the upholsterers enough time to take down the hangings, curtains and so forth.

在线智能词典记不住单词吗?试试在线背单词,快速帮你突破单词障碍。

Basing on ice formation rate of AgI at different temperatures after "37" anti-aircraft shell exploding, multiple relationship of two gradient temperature, as well as exploding time, angle, vertical height, contour interval and slanting distance of anti-aircraft artillery 83 rainfall bomb, the ideal dissemination radios and launch angle of ideal density were calculated, and the suitable bullet number and operating method were analyzed, for the purpose of using reasonable method of firing and the least person rain ball to achieve best precipitation enhancement effect.

利用&三七&高炮炮弹爆炸后AgI在不同温度下的成冰率及前后2个温度梯度倍数关系,以及高炮83型增雨弹引信自炸时间和射角及其所达垂直高度、水平距离、斜距等资料,计算出理想浓度的理想弥散半径和发射角度,从而分析得出在人工增雨作业中适宜的用弹量和作业方法,以期利用合理的射击方法,使用最少的人雨弹,达到最佳的增雨效果。

Furthermore, a process was begun, on the authority or by decree of the Roman council, and at the command of the church and of the apostolic see, after a due interval of time, for the condemnation of the said Wyclif and his memory.

此外,还开始推行这一进程,对主管部门或法令的罗马会议,并在命令的教会和教廷看到后,因间隔的时间,为谴责该说wyclif和他的记忆。

第36/36页 首页 < ... 28 29 30 31 32 33 34 35 36
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。