查询词典 tide lock
- 与 tide lock 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Professional production: Drawer locks, three interlocking furniture, glass locks, window locks, mailbox lock, shift lock series.
专业生产:抽屉锁、家具三联锁、玻璃锁、橱窗锁、信箱锁、移门锁系列。
-
A phase-lock circuit composed of special phase-lock CMOS chip CD4046 and frequency dividing chip CD4040 is designed,with a simple extemal integral loop f
用CMOS专用数字锁相芯片CD4046(内部集成有鉴相器和压控振荡器)和分频芯片CD4040构成了实际锁相电路。
-
Ship lock with double-hinged soleplate, which is developed based on the integral ship lock, is widely applied on silt-sandy foundation and fine-sandy foundation.
双铰底板式闸室结构是在整体式闸室基础上发展起来的一种型式,一般适用于粉砂、细砂地基,应用十分广泛。
-
Integration of machinery's electronic combination lock, its function surpasses the spring lock greatly, and the performance is stabler, is safer.
机电一体化的电子密码锁,其功能大大超过弹子锁,且性能更稳定、更安全。
-
Spring lock or auto lock zips must be used.
必须用弹簧锁或自动锁头拉练。
-
As a result of own superiority, the electroniccombination lock will receive more and more people's welcome, theuse will be getting more and more widespread, simultaneously, alsowill be accepted by the society the approval, and will share halfand half with the spring lock.
由于自身的优势,电子密码锁会受到越来越多人们的欢迎,使用会越来越广泛,同时,也将会被社会所接受认可,并与弹子锁平分秋色。
-
This article from the locking device kto prevent going in development and classified, unblanking method type obtaining, introduced in detail the spring lock the structure and the principle, after the elaboration operate the broken lock tool, the opening scope and the method, different method opening common keep the mark characteristic.
本文从锁具的发展与分类、开锁手段的类型入手,详细介绍弹子锁的结构和原理,论述常见开破锁工具、开启范围和方法、不同方法开启后的留痕特点。
-
Under an interaction of the spring and the elastic bayonet lock, the sealing plug base can be steadily combined with the push-pull rod through the compression and bounce of the spring, press and bounce of the elastic bayonet lock and insertion and extraction of the small sealing plug.
在弹簧和弹性卡销的共同作用下,密封塞座和推拉杆可以稳定的结合在一起,通过弹簧的压缩、弹起和弹性卡销的按入、弹起以及小密封塞的插入、退出。
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
- 相关中文对照歌词
- Three Lock Box
- The Tide Will Rise
- Maniac
- The Tide Is Turning (After Live Aid)
- Lock You Up
- Testify
- The Tide Is High (Coldcut Remix)
- Eight Lock
- Shamrocks And Shenanigans
- Help Is Coming
- 推荐网络例句
-
You can do some assertiveness training.
你可以进行一些自信训练。
-
We were well on the path to making a rear-wheel-drive global platform," says Mays."
我们正致力于建立一个后轮驱动的平台,"Mays这样说道。"
-
F: I think the oval shape suits you well.
我觉得这副椭圆形的可能很适合你。