查询词典 thrust plane
- 与 thrust plane 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Its concluded that, there is a proper combustor exit plane area helpful for reaching maximum thrust; the combustor exit plane area should be increased with the flight Mach number increasing, insuring the exhaust expanding properly.
研究结果表明,不同的飞行马赫数下,存在最佳的燃烧室出口面积使发动机推力达到最大;飞行马赫数增加时燃烧室出口面积应尽量增大,以保证燃气实现完全膨胀从而实现发动机推力最大。
-
The article with the intercept outside aerosphere implement to study a target, consider amount of miss the target is very small approach rate mediumly with intercept process bigger, be aimed at engine to be able to offer constant thrust only, can be started for many times and have pulse job state, and do not have change the character of thrust job status, apply slant buy scale guides brought a law to design agree with the switch threshold value that course controls engine.
本文以大气层外拦截器为探究对象,考虑到脱靶量很小和拦截过程中的接近速度比较大,针对发动机只能提供常推力,能多次启动并具有脉冲工作状态,且不具有变推力工作状态的特性,运用偏置比例导引律设计了适合于轨控发动机的开关阈值。
-
It uses additional power plant will be the executing agency of the level of air film thrust lever magnified by the conversion to vertical thrust.
它采用增力装置将气动薄膜执行机构的水平推力经杠杆的放大,转换为垂直方向的推力。
-
Maintain the thrust on crankshaft and then pry main bearing cap on thrust shaft hole back
保持曲轴上的推力,将止推轴孔主承盖向后撬
-
Cut file, sawing skills by learning the grip, standing position, body movements, and many other points force factors and the impact of the traditional grip of the emergence of file-grip handle to stand up after slightly outside the site of the palm, when a file cut Force, after the file handle a gradual shift,"hold" to "grasp", resulting in the introduction file enough; saw grip handle full point higher than the thrust of the saw blade to install center hole of about 30mm, the high point of thrust is likely to result in the bow saw On both sides of the swing, resulting in a broken saw blade and saw seam askew.
锉削、锯削技能的学习是受握法、站立部位、身体动作、作用力点等诸多因素的制约和影响的,传统的握法出现握锉柄后顶住部位稍偏离手心,锉削时一用力,锉柄逐渐后移,"握"变成"抓",造成锉刀推出力度不足;满握锯柄的推力点高于锯条安装孔中心约30mm,偏高的推力点很容易造成锯弓向两侧摆动,造成锯条折断及锯缝歪斜。
-
The existing calculation methods of landslide thrust are discussed and the finite element method for computing landslide thrust is presented.
随后本文分析了现有各种滑坡推力的计算方法,并提出用有限单元法进行滑坡推力计算的思想。
-
The thrust fault cut and reformed the Early-Middle Jurassic sedimentary strata and is covered by the Early Cretaceous sedimentary strata, indicating that the thrust fault was formed between the deposition of Early-Middle Jurassic Series and Guyang Formation.
断层切割改造了早-中侏罗世沉积地层,被早白垩世沉积地层覆盖,表明了逆冲断层形成在下中侏罗统沉积之后白垩系固阳组沉积之前。
-
The thrust fault cut and reformed the Early-Middle Jurassic sedimentary strata and is covered by the Early Cretaceous sedimentary strata, indicating that the thrust faultwas formed between the deposition of Early-Middle Jurassic Series and Guyang Formation.
断层切割改造了早-中侏罗世沉积地层,被早白垩世沉积地层覆盖,表明了逆冲断层形成在下中侏罗统沉积之后白垩系固阳组沉积之前。
-
It is shown that the friction force and bulkhead thrust are the main factors of shield thrust setting, while the friction between the cutterhead and soil is the main factors of cutterhead torque setting. Friction force between shield and soil would make front soil of shield upheave, and subsidence of surface soil is induced by ground loss when the friction force between the cutterhead and soil results in the surface settlement asymmetrical distribution.
通过计算发现,盾构施工中盾壳摩擦和正面推力是盾构推力设置的主要因素,而刀盘与土体摩擦是刀盘扭矩设置的主要因素,盾构前方土体隆起主要由盾壳摩擦引起,刀盘摩擦作用主要引起地表沉降的非对称分布,地表沉降主要由盾尾空隙产生。
-
At length I spy'd a little Cove on the right Shore of the Creek, to which with great Pain and Difficulty I guided my Raft, and at last got so near, as that, reaching Ground with my Oar, I could thrust her directly in, but here I had like to have dipt all my Cargo in the Sea again; for that Shore lying pretty steep, that is to say sloping, there was no Place to land, but where one End of my Float, if it run on Shore, would lie so high, and the other sink lower as before, that it would endanger my Cargo again: All that I could do, was to wait 'till the Tide was at highest, keeping the Raft with my Oar like an Anchor to hold the Side of it fast to the Shore, near a flat Piece of Ground, which I expected the Water would flow over; and so it did: As soon as I found Water enough, for my Raft drew about a Foot of Water, I thrust her on upon that flat Piece of Ground, and there fasten'd or mor'd her by sticking my two broken Oars into the Ground; one on one Side near one End, and one on the other Side near the other End; and thus I lay 'till the Water ebb'd away, and left my Raft and all my Cargo safe on Shore.
最后,我终于在小河的右岸发现一个小湾。我费尽艰辛,好不容易把木排驶到最浅的地方。我用桨抵住河底,尽力把木排撑进去。可是,在这里,我几乎又一次险些把货物全都倒翻在水里。这一带河岸又陡又直,找不到可以登岸的地方。如果木排一头搁浅在岸上,另一头必定会像前次那样向下倾斜,结果货物又有滑向水里的危险。这时,我只好用桨作锚,把木排一边固定在一片靠近河岸的平坦的沙滩上,以等待潮水涨高,漫过沙滩再说。后来,潮水果然继续上涨,漫上沙滩,等水涨得够高了,我就把木排撑过去,因为木排吃水有一尺多深。到了那儿,我用两支断桨插入沙滩里,前后各一支,把木排停泊好,单等潮水退去,就可把木排和货物品平安安地留在岸上了。
- 相关中文对照歌词
- This Plane
- Lost Planes
- Sexcapade
- Leaving On A Jet Plane
- Plane Love
- Who's Driving Your Plane?
- Higher Plane
- 3 Anthem
- Big Jet Plane
- Ca Plane Pour Moi
- 推荐网络例句
-
" I' d like to get some rough idea about music in the baroque ear, please."
请简要介绍一下巴罗克时期的音乐,好吗?
-
The results showed that the peak latency and pattern of SEPs elicited by electrical needling in LI-l1 and MP were similar. The amplitude of SEPs elicited by electrical needling in LI-l1 was higher than that of MP. There was no obvious SEPs generation when MM was electrical needling.
结果显示,电针刺激曲池穴和其邻近桡侧伸腕长肌运动点诱发性脑电波的波形和波峰时间是类似的,只是穴位的诱发性脑电波波幅较大,而电针刺激非穴位点并没有明显的诱发性脑电位。
-
Mom and Dad better bone up on these not so ordinary competitions like polo, yachting and synchronized swimming!
爸爸妈妈更好的骨落实这些不是普通的比赛一样,水球,帆船和花样游泳!