查询词典 the first floor
- 与 the first floor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First on the floor, you know that's me
第一个站在地板上,你知道那就是我
-
B: Can you show us the floor plan first?
你可以先让我们看看平面图吗?
-
In the study of the water oxygen resume, start off the mechanism of the atmosphere oxygen resume, the paper first poses the atmosphere oxygen resume equation and oxygen resume coefficent calculation formulation of the static state water. The number of the progressing of the Blak-phelps equation is made certain, and the atmosphere oxygen resume equation and coefficent are ensured in both conditions of considering the floor reflection and unconsidering the floor reflection.
在对湖库水体复氧研究中,从大气复氧的机理出发,首先提出静态水体的大气复氧方程和大气复氧系数计算公式,其中对Blak-phelps方程级数项项数的确定,不考虑底部反射的大气复氧方程和考虑底部反射的大气复氧这三个问题进行了深入分析,得出相应的结果。
-
Compared with reinforced concrete floor, steel deck possess the advantage of thin wall, light in mass, but owing to smallness of damp, weakness of dissipation of energy, comfort possibly dissatisfies applicability required. Therefore, this paper first calculates and analyses dynamic property of new style steel deck; according to single footfall curve, ascertaining hominine walking excitation; utilizing time-history analytical method, calculating peak acceleration response of floor slab under excitation, and analyzing peak acceleration response proceeding from different board stride, different damping ratio as well as different profile.
相对于钢筋混凝土楼板而言,虽然钢承板具有壁薄、质轻的优势,但由于阻尼小、耗能差,其舒适度可能会不满足适用性的要求,为此本文首先计算和分析了新型钢承板的动力特性;根据单步落足曲线确定了人的行走激励;利用时程分析法,计算了楼板在行走激励下的最大加速度响应,并对不同板跨、不同阻尼比以及不同板型下的最大加速度响应进行了分析,结果表明这三种因素,尤其阻尼比和板型对于加速度响应的影响较大。
-
Calculate by hand at first, finish loading and calculating; Electricity regard as begin, finish floor, times of calculation of roof beam, The floor matches the muscle, the form construction drawing of roof beam.
首先进行手工计算,完成荷载计算;电算开始,完成楼板,次梁的计算,楼板配筋,梁表施工图。
-
Currently committed to the development of the project are: 1, and highly efficient energy-saving wall, floor-small gas heating, hot water shower boiler 2, a heat recovery function of refrigeration, heating gas integrated air-conditioning unit 3, light Hydrocarbon gas technology 4, four seasons with the application of solar gas Technology 5, refrigeration - Gas - Solar - floor heating system optimization of energy-saving technology 6, the vacuum system superconducting Hot technology Over the years, we in a "customer first" principle, the user would like to think, urgent needs of users and constant innovation, and actively explore.
目前致力开发的项目有: 1、高效节能壁挂、落地式小型燃气采暖、淋浴热水锅炉 2、具有热回收功能的制冷、采暖一体化燃气空调机组 3、轻烃燃气技术 4、可四季应用的太阳能与沼气配套技术 5、制冷—燃气—太阳能—地板采暖的系统优化节能技术 6、真空超导制热技术多年以来,我们本着&用户至上&的原则,想用户之所想,急用户之所需,不断创新,积极探索。
-
1 Laid on the observation points, the next gate in the first paragraph and the chamber are in side-dock-type pier and construction of a wide bottom seam laid 8 to each end of the settlement within 24 observation points nails; chamber 14 Fu wall segments are in lock wall at both ends of the floor laid four nails into account the settlement of 56 observation points; settlement nail making use of 40cmФ18 rebar welded copper top round hat hemisphere processed, buried, when coupled with oblique bars welded to the end of plate surface layer and vertical reinforcement, the top highlight the concrete surface, about 1.5 ~ 2.0cm in order to guarantee points are solid.
3.2.1观测点的布设上、下闸首及闸室坞式段均在边墩底板及施工宽缝的两端各布设8个沉降钉计24个观测点;闸室14节扶壁段均在闸墙底板两端各布设4个沉降钉计56个观测点;沉降钉的制作采用40cmФ18螺纹钢顶端焊接镀铜半球圆帽加工而成,埋设时配以斜筋焊接在底板面层及竖向钢筋上,顶端突出砼表面1.5~2.0cm左右,以保证点位稳固。
-
Until the end of the ball. Then, in the course side of a position in any election outside a ball point, headed into the first one issued to the floor after the ball, two balls can be kicked from a ball-point target header, if hit, two balls for the win, l for the header, back to the ball-point re-serve.
然后,在球场边外的任何一个位置选一个发球点,头球向场内发进第一个球以后,二球就可以从发球点瞄准头球踢打,如果打中,二球为赢,升为头球,退回到发球点重新发球。
-
For the highly successful raider of the "buckateers" now entered what was for him a new world, about which he had much to learn:"stock ahead"(an order isn't executed at a specific price although it is printed so on the tape—meaning someone else's order has hit the floor first);"matched and lost"(orders arriving simultaneously at a post on the floor, with insufficient stock available at a specific price, are executed according to the flip of a coin) and the arena of the "late tape"(during periods of activity, trades printed on the tape may be five to ten minutes behind actual trades on the floor and the speculator cannot demand an execution even though he sees the price on the tape go through his limit).
他在袭击非正规经纪公司方面是高度成功的,现在他进入的是一个崭新的世界,他有很多东西要学:优先成交&报价带显示了这个报价,&(但是这个价格的订单却没有被成交——这意味着别人的订单提前成交了)订单数量不匹配&,&(订单到了场内,但是没有足够的股票成交,只好掷硬币决定),还有&报价延时&(报价带上面的价格比真实的交易价格延迟了 5 到 10 分钟,即使投机者看见了报价带上面的价格,他也无法成交)。
-
Consumers in the purchase of wood floors, first thought of using the floor because it is the most traditional, most popular and most popular floor has a floor market types : Kei Hau floors, ping-size model to a longer-wide were : Master floors, that is grounded; special needs, personalized : paste-up fight side floors, vertical wooden floor.
消费者在购买木地板时,首先想到的是实木地板,因为它是最传统、最普及、最深入人心的地板,至今市场出现的地板种类有:企口地板、平口地板;尺寸较长转宽的有:集成地板、指接地板;特别呈现时代感、个性化的有:拼花拼方地板、竖木地板等。
- 推荐网络例句
-
They weren't aggressive, but I yelled and threw a rock in their direction to get them off the trail and away from me, just in case.
他们没有侵略性,但我大喊,并在他们的方向扔石头让他们过的线索,远离我,以防万一。
-
In slot 2 in your bag put wrapping paper, quantity does not matter in this case.
在你的书包里槽2把包装纸、数量无关紧要。
-
Store this product in a sealed, lightproof, dry and cool place.
密封,遮光,置阴凉干燥处。