英语人>网络例句>the High Dam 相关的网络例句
the High Dam相关的网络例句

查询词典 the High Dam

与 the High Dam 相关的网络例句 [注:此内容来源于网络,仅供参考]

It studied the traditional pressure plate bolt anchoring system ,filling and drainage system,and the model of dam-side layout in the rubber dam.After repeated calculation,proposed the new pressure plate bolts anchoring component using pairs of anchor bars and connect the anchor plate and the platen with high-strength bolts,compared and analysis with the traditional pressure plate bolt anchoring system.

小 摘要:通过对现行橡胶坝设计中传统螺栓压板式锚固系统、充排水系统及坝端布置模式的研究,运用对比分析的方法,经过反复计算提出采用双锚筋及用高强螺栓连接锚固垫板和压板的新型螺栓压板式锚固构件,并与传统锚固型式进行对比分析。

Fault tree analysis is used to analyse the high arch dam risk.

利用故障树分析法对高拱坝进行风险分析。

Egypt and the Aswan High Dam, which is also in Egypt.

字塔和阿斯旺高坝,后者也是在埃及境内。

The Aswan High dam is a good example of an embankment dam.

在阿斯旺大坝就是一个很好的例子是土石坝。

After 11 years of construction, the Aswan High Dam in Egypt is completed.

1970年的今天,历经11年的修建后,埃及的阿斯旺水坝竣工完成。

In consideration of the high atmospheric temperature in Baise city, the high silt percentage of diabase aggregate applied for main dam, the author study the influence of temperature and other factors on RCC set time, and conduct test for the relationship between different temperatures, VC values and admixture percentages and set time.

针对百色气温高,大坝采用辉绿岩骨料,石粉含量大等特点,研究温度等因素对碾压混凝土凝结时间的影响,进行了不同的气温条件、 VC值及外加剂掺量对凝结时间的关系试验研

The Coquitlam Dam, constructed in 1913, is a 30 m high hydraulic fill embankment dam.

Coquitlam大坝建于1913年,坝高30 m,为吹填土石坝。

The horizontal swirling flow internal dissipater tunnel being built in Gongboxia Power Station will be the first one reconstructed from a diversion tunnel whose dischargereaches to 1000m Vs and water head is more than 100m in china . Its schemes argumentation ,test research and future apply will have important meanings to the design .research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode , which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. It is of theoretical and practical importance to promote hydraulic structure researches and development.

公伯峡水电站右岸旋流内消能泄洪洞是国内第一个泄量达1000m/s、水头超过100m,即将修建的旋流式内消能泄洪洞,其方案的论证与试验研究以及建成后投入使用,将在国内外旋流式内消能泄洪洞设计、研究与工程应用中具有重要的意义,将有力的推动这一新的消能形式在工程中的应用,从而为解决高坝建设中泄水建筑物的高速水流问题与导流洞改建的技术与经济问题提供工程实例,对推动与发展水工水力学的研究与发展均具有重要的理论与实践意义。

Major lakes large Bitter Lake, and Tim sah Lake, as well as the Aswan high dam formed by Africa's largest artificial lake

主要湖泊有大苦湖和提姆萨赫湖,以及阿斯旺高坝形成的非洲最大的人工湖——纳赛尔水库(5000平方公里)。

Major lakes large Bitter Lake, and Tim sah Lake, as well as the Aswan high dam formed by Africa's largest artificial lake - Lake Nasser (5000 square kilometers).

主要湖泊有大苦湖和提姆萨赫湖,以及阿斯旺高坝形成的非洲最大的人工湖——纳赛尔水库(5000平方公里)。

第2/14页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力