查询词典 the High Dam
- 与 the High Dam 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the end it suggests some counter-measures, including: developing cage acquiculture in the bends and branches as the stradegy direction in cultivation program; developing high-density flowing aquiculture making use of the stream resources; selectively developing dam-intercepting bends acquiculture and quality pool fishery; intensifying the protection and utilization of the natural fish resources so as to develop special variety and establish fry production base; developing large-water-area throw-in and enrichment and culture fishery and halieutics; protecting ecological environment and establishing economic fish and rare fish protection district; perfecting fishery institution and intensifying fishery management and bettering the fish breeding; developing tourist and fishing industry; establishing related mechanism including government control mechanism, market guiding mechanism, management and running company system, sales market share system, farmer organizing and uniting system, leading enterprise leading system; increasing the investment to the fishery industry in the area
文章最后提出发展三峡水库渔业的对策包括:养殖项目的战略定向为利用库湾库汊,发展网箱养鱼;利用山溪流水资源,开展高密度流水养鱼;利用高水位区库湾,有选择地开展坝拦库湾养鱼和精养池塘渔业;强化天然鱼类资源保护与合理利用,进行特色品种的开发和苗种生产基地的建设;大水域放流增殖,发展捕捞业;保护生态环境,建立经济鱼类和珍稀鱼类保护区;健全渔政机构、加强渔政管理、做好鱼类繁殖;积极发展游钓业;建立与渔业发展相适应的配套机制包括政府调控机制、市场导向机制、管理运营公司制、营销市场股份制、农民组织协会制、龙头企业带动制;增加三峡水库渔业的资金投入。
-
The caculation results of Pubugou high rockfill dam under the action of design earthquake travclling wave show: in few cases, the seismic response under travelling wave input is less than that under routine input; but in many cases, the former surpasses the latter, and the rate of increase of few components has doubled and redoubled; the strengthened areas of seismic response under the action of travclling wave are in the direction which travelling wave has gone; compared with acceleration and displacement, dynamic stress is even more sensitive to travelling wave input; compared with the direction along river, the effects of travelling wave in the direction cross river are even more intense.
结合瀑布沟高土石坝在设计地震行波输入下的研究表明,行波反应少数情况下弱于常规反应,而大多数情况下则有所增强,个别指标甚至有成倍的增加;行波反应强化区均出现在去波向;与加速度和位移相比,动应力反应对行波输入更为敏感;与坝体顺河向行波效应相比,横河向则更加强化。
-
Work provided the technique assurance.1999 of the That engineering experienced in 1999 earthquake and in 2002 especially the test of the flood. is been a high-quality engineering by the water conservancy department ; Had the honor of acquiring the civil engineering academic association"ZHAN TIAN YOU4 the civil engineering prize" in 2003;"The active fault ascend big dam safety monitor technique" of the cooperation development gets 2004 years interborough science and technology progress No. 3 quality prize.
该工程经历了1999年地震和2002年特大洪水的考验。1999年被水利部评为优质工程;2000年荣获自治区第十届优秀工程和中国建筑业协会"中国建筑工程鲁班奖";2003年荣获土木工程学会"詹天佑土木工程奖";合作开发的"活断层上大坝安全监测技术"获2004年度自治区科技进步三等奖。
-
2Nd, hydrology condition this project is situated at north Yangtze River, its hydrologic remime is as follows: Yangtze River history maximum high-water: 45.22m (in 1998) Yangtze River history most low water level: 30.37m Yangtze River mean water level: 35.745m Yangtze River average sand content: 1.16kg/m3 the subsoil water level (water volume is rich, water quality good): after 0.8m the Three Gorges Dam completes, the Yangtze River Shashi hydrologic station's water level, will rise 1-2 meters equally in the waterless season, the ample flow season will drop above equally 1-2 meters, both are advantageous to the flood prevention, and can guarantee that 3000 tonner barges year to year normally navigate and anchor.
水文条件该项目地处长江北部,其水文情况如下:长江历史最高水位:45.22m(1998年)长江历史最低水位:30.37m 长江平均水位:35.745m 长江平均含砂量:1.16kg/m3 地下水位:0.8m 三峡大坝建成后,长江沙市水文站的水位,在枯水季节将平均上升1—2米,丰水季节将平均下降1—2米以上,既有利于防洪,又能保证3000吨级驳船的常年正常航行和停靠。
-
The concrete delivery system for the dam is composed of mixer feeding conveyer, system connecting conveyer, 3 high-speed belt conveyer lines, 3 vacuum-chutes and 2 sets of tower crane placers.
混凝土运输供料线是大坝混凝土浇筑的关键设备,每条供料线的平均输送能力为330m^3/h,输送能力为水电工程之最。
-
As it can reduce the quantity of equipment for field surveying and of field workers, and is able to exercise software control and automatic collection of field data by deformation surveying, the system helps achieve automatization, digitalization and computerization of observation by dam deformation network, ensure the accuracy and high efficiency of surveying results, and alleviate work intensity for survey crew.
徕卡多功能全站仪测量软件系统摒弃了传统断面仪外业测量时的繁琐配置和定位缺陷,减少了外业设备和作业人员编制数量,实现了变形测量野外数据采集软件控制、自动采集等功能,从而达到大坝变形网观测自动化、数字化、计算机化,保证了测量成果的准确性、高效率性,减轻了测量人员的劳动强度。
-
Briefly described measures taken in purifying the liquid steel to improve steel quality such as expansion of tundish capacity,installation of stop plate,separating wall,overflow dam and ceramic filter at the tundish and adoption of high basicity flux as well as reheating of liquid steel in the tundish.
简述了通过中间包扩容;在中间包内增设挡扳、隔墙/溢流堰、陶瓷过滤器,采用高碱度中间包保护渣以及中间包钢液加热等措施,净化钢水,提高钢的质量。
-
The limit analysis method for engineering structures is applied to calculate the holistic safety factor of high concrete arch dam.
采用工程结构极限分析方法,利用已有的有限元计算程序并结合数学规划方法来推求拱坝的整体安全系数。
-
A brief account is given of the problem in traditional high arch dam safety evaluation without considering the randomness and without failure mode analyzing.
简述了高拱坝传统安全评价中不考虑随机性、不进行失效模式分析等存在问题,提出应用失效概率与风险值两个指标对高拱坝进行安全评价。
-
Take the 260m Nuozhadu high core rock-fill dam for example, a new idea of safety evaluation based on the criterion of deformation is proposed.
以260m高的糯扎渡心墙土石坝为例,初步发展了基于地震永久变形控制标准的高土石坝抗震安全评价思想。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力