查询词典 testing engineering
- 与 testing engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Cryostat tank / tank temperature / low temperature tank is widely used in petroleum, chemical, electronic instruments, physical, chemical, biological engineering, medicine and health, life science, light and food, materials testing and chemical analysis, research departments, universities, businesses quality control and production departments work for the user to provide a hot and cold controlled temperature constant uniform field source, the test samples or products produced by a constant temperature test or test, but also as a direct heating or cooling and auxiliary heating or cooling of heat or cold source.
低温恒温油槽/恒温油槽/低温油槽广泛用于石油、化工、电子仪表、物理、化工、生物工程、医药卫生、生命科学、轻工食品、物性测试及化学分析等研究部门,高等院校,企业质检及生产部门,为用户工作时提供一个热冷受控,温度均匀恒定的场源,对试验样品或生产的产品进行恒定温度试验或测试,也可作为直接加热或制冷和辅助加热或制冷的热源或冷源。
-
The paper has studied the strata distributive character and engineering geologic property of bed rock zone of weathering in cryptical coal field, based on large of data form testing and real-field materials, taking importance on the laws of overlying destruction and underground pressure behavior and the mechanism of decreasing protective coal columns while extracting proximity zone of weathering .
以大量实验数据和现场测试资料为依据,研究了隐伏煤田基岩风化带岩体的分布特点及工程地质特性,重点论述了邻近风化带开采的覆岩破坏和矿山压力显现规律以及缩小防护煤柱的机理,为类似矿井的资源回收与安全开采提供了依据。
-
Sichuan Construction Limited of Hong Kong Island, the predecessor of Hubei triple by the mechanization Engineering Company Limited, Hubei Construction Limited of Hong Kong Island而立reorganization is a strong technical force, professional trades complete, a high degree of mechanization, all kinds of testing equipment supporting, Construction of experienced construction companies.
四川港岛工程建设有限公司的前身是由湖北三联机械化工程有限公司、湖北港岛工程建设有限公司重组而立的是一支技术力量雄厚、专业工种齐全、机械化程度高、各种检测设备配套、施工经验丰富的施工企业。
-
The factory is located in the beautiful scenic Liu Jiang River, covers an area of 5,000 square meters, the plant area of 2,000 square meters, more than 600 million yuan in fixed assets, now has advanced PCR two production lines, now more than 80 employees, has a strong The engineering and technical personnel and domestic first-class circuit board production and testing equipment.
工厂坐落在风景秀丽的柳溪江风景区,占地面积5000平方米,厂房面积2000平方米,固定资产600多万元,现在拥有先进的PCR生产线二条,现在职工80余人,拥有一批实力雄厚的工程技术人员及国内一流的线路板生产、检测设备。
-
Compared with the shock experiment of the drop hammer, the experiment method accords with the principle of shock isolation, and hence the shock testing results are better reference parameters for the engineering application.
相比落锤冲击试验而言,本测试方法符合冲击隔离原理,因而测试结果对于工程应用具有更好的参考价值。
-
Based on testing datas in worksite and engineering practice,this paper mainly discussed strata damage movement characteristic, rock properties of weathered zone, qualitative and quantitative analysis of the law of coal layer safety extraction in weathered zone when the coal layer is extracted in efflorescent oxygenized belts.
根据现场观测资料和工程实践,着重论述了风氧化带内煤层开采时覆岩破坏移动特征,风化带岩石属性和风氧化带内煤层安全开采机理的定性、定量分析。提出了风氧化带煤层开采无垮落带;受采动影响后,具阻水和抑制导水断裂带继续发展的双重作用以及移动快、变形大、回宿快、下沉大和适当加大开采厚度等新观点
-
During 1980 to 2002, the whole patch's quantity increases and has the phenomenon of crumble. In addition, the distribution of each patch becomes more disperse gradually, and the enchase decreases. During 2002 to 2006, after the creek engineering project has been put in place for several years, the whole landscape structure starts to become in ordered. Proven by the bird research data, higher sample are mostly scatter along the river side. Therefore, the creek engineer is able to stabilize our environment, and the big patch is increasing because of the plan of patch, as a result, the variety of birds in the testing area increases by a significant number.
於1980 ~ 2002年间,在人为大力开发加上天然风灾肆虐下,整体块区之数量渐增且形状有呈现破碎化之现象,而各类别块区之分布逐渐分散,且镶嵌度亦有下降之情形。2002 ~ 2006年,经逐年之野溪工程整治,整体景观结构有朝向规整化的情形,且以鸟类调查资料验证,丰度较高之样点大多沿著溪流分布,故可得知,野溪工程之施作对环境有稳定之功能,且因块区之规整使大块区数量增加,亦使研究试区之鸟类生态丰富度增加。
-
Software testing is an important part of software engineering.
软件测试是软件工程的一个重要部分。
-
For the ever-expanding software to reach the standard of Software Engineering, the best possible testing should be applied.
为了确保日益庞大的软件达到软件工程的度量标准,就必须进行尽可能完备的软件测试。
-
All parts, end-items or components, subsystems, and systems for PV Testing endmust be completed before the FEU Build according to the engineering specifications in the Pre-Launch Control Plan.
Pre必须在根据工程规范建立PEU前,在试生产控制计划中完成所有零件,产品最终必须在根据工程规范建立PEU前,在试生产控制计划中完成所有零件,产品最终阶段基组成部分,子系统和系统的PV试验。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?