查询词典 test
- 与 test 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Although a great deal work have been done to theoretical research of beams with two cantilevers structure, we paid attention to test systems used in beams with two cantilevers mechanics test less. And school, incorporated teaching and researching, needed this small or medium octavo test system to develop teaching and researching. So joining in this development item of test system established by school, the thesis aimed to develop a set of simple, economical and applicable test system of reinforced concrete beams with two cantilevers to serve for teaching and researching, and make it a powerful supplement in structural experiment field.
我们尽管已经对双悬臂结构的理论研究做了大量的工作,但是对双悬臂结构进行力学试验的试验体系相对较少,而作为教学与研究为一体的学校迫切需要这样的中小型试验测试体系开展教学与科研,故本课题结合学校已经立项的试验系统开发项目力图研制开发一套简单、经济、适用的钢筋混凝土双悬臂梁试验系统为教学与科研服务,同时作为对双悬臂梁结构试验领域的补充。
-
In this flow a tradeoff of multiple test methods is adopted, which includes structural test, functional test and parametric test. Using the test mode of"stop as finding the fault"and based on the position of the first failure, we can label the faulty chips into different bins.
该流程综合采用结构测试、功能测试、参数测试等测试方法,采取"发现故障即停止"的测试方式,根据芯片首次失效的位置对失效芯片进行Bin的分类,有效增强了分析的针对性,缩短了测试时间。
-
First, this article introduced 2 grade of rotary kiln principle of work and the equipment, to rolled the circle mechanics behavior to carry on the analysis, proposed - rolled the circle - under roller's rotary kiln overall modelling based on the tube body - kiln liner - big tooth ring, to rolled the circle - under roller's contact stress to carry on the finite element analysis the method, and obtained rolled the circle contact stress the size and the distribution rule, finally indicated that rolled the circle contact stress mainly to have two main peak values and the sudden change in one week, appeared is rolling the circle and the under roller contact area; Then, rolls the circle the stress to regard as is the principal stress unknown plane stress test, the use quite mature modern test technology, proposed rolls the circle stress test the principle and the plan, and to rolled the circle the stress to carry on the scene test, the stress which the scene test analysis result and the finite element analysis calculated has compared, had proven the whole method modelling's finite element analysis method's rationality and rolled the circle - under roller contact stress the result accuracy; Finally, uses ANSYS APDL the re-development technology, in view of 2 grades of rotary kilns, rolled the circle - under roller contact stress the overall finite element analytic method to carry on the re-development.
首先,本文介绍了2档回转窑工作原理和装置,对滚圈的力学行为进行了分析,提出了基于筒体-窑衬-大齿圈-滚圈-托轮的回转窑整体建模,对滚圈-托轮的接触应力进行有限元分析的方法,并得到了滚圈接触应力的大小和分布规律,结果表明滚圈接触应力在一周内主要存在两个主要的峰值和突变,都出现在滚圈与托轮接触区域;然后,把滚圈的受力看成是主应力未知的平面应力的测试,利用比较成熟的现代测试技术,提出了滚圈应力测试的原理和方案,并对滚圈的应力进行了现场测试,现场测试分析结果与有限元分析计算出的应力相比较,证明了整体法建模的有限元分析方法的合理性和滚圈-托轮接触应力的结果的正确性;最后,利用ANSYS的APDL的二次开发技术,针对2档回转窑,就滚圈-托轮接触应力的整体有限元分析法进行了二次开发。
-
Second, Pearson's correlation coefficient test has big warp in the study. Compared with the χ2-test, the Ochiai association test and Pearson's correlation coefficient test, Spearman's rank correlation coefficient test is more sensitive.
Pearson相关检验在研究中有较大偏差,Spearman秩相关检验的灵敏度要大于χ2检验、Ochiai关联度检验和Pearson相关检验。
-
With an area over 2600m2 and equipped with most advanced testing equipment such as step-in constant temperature and humidity test room, vibrator, salt mist test box, waterproof test equipment, EMI receivers, 3m anechoic chamber, fire test and telephone test equipment and latest standards, the lab provides inspection and testing services according to a variety of national and international standards(GB, IEC、UL、VDE、BS).
配备有符合中国国家标准、国际标准(IEC、UL、VDE、BS等)的先进测试仪器:包括步入式恒温恒湿室、振动台、盐雾试验箱、防水试验设备、燃烧试验仪、EMI接收机、3米法暗室、人工电源网络及电话机测试仪等260多台,拥有满足测试要求的相关最新标准。
-
The examination falls into two parts: the written test and the operation test. The written test is to check one's basic electric knowledge, which includes electric control theories, installation standards, etc. The operation test is a bit difficulty. Firstly, you have to connect several major loops and control loops appointed by the examiner within limited time. If you do right, the electricity is connected, the bell rings and the light turns on, then you will pass the test; but if it explodes and emits smoke, then you will not only get zero score but be scolded. Life is not a game, and one should never pretend to know things that he does not know.
考试分笔试和操作二项,笔试的内容都是最基本的电工知识,电气控制原理,电气安装规范等等,而考操作就有难度了,首先要你在规定的时间里接好考官指定几的主回路和控制回路,接对了,通上电,灯亮铃响顺利过关;若是爆炸冒烟,那不仅没分还要挨骂,生命不可儿戏,不懂不能装懂。
-
Susceptibility test ,effective dosage test, safety test ,clinical therapeutic and preventive test and comparative therapeutic test with western medicine were all done by using self-made compound recipe of Chinese herbal medicine in colibacillosis of egg chickens.
用自拟中草药复方对蛋雏鸡大肠杆菌病进行了病原菌体外药物敏感试验、中西药疗效对比试验及临床治疗和预防试验。
-
According to ISO-10993 standard, hematolysis test,dynamic coagulation time test, cell toxicity test,stimulation test and pyrogen test were performed in two groups,and the results were compared betwen two groups.
按ISO—10993标准,两组分别做溶血实验、动态凝血时间实验、细胞毒性实验、刺激实验和热原实验,对其结果逐项进行比较。
-
The index of flame retardant property,material,product structure and relevant method of test of the antiflaming flexible cable is established according to the standard of GB/T18301-2001《the Third Part of Burning Test of cables in the Condition of flame:Method of Buring Test of Bunchy Wires and Cables》.The Cable will emanate the bad gas in buring to causethe the second calamity,so the smoke capacity of the cable in burning should be tested according to the standard of IECl034-2(1991)《the Second Part of Method of Smoke Concentration Test ofCable 1n Burning:Procedure and Requirement ofTest》The Liberation of Gas 1n burning is tested according to the standard of IEC754-2(1991)《the Second Part of Test of Liberatlon of Burning Materlal from Cable:Method to Measure the ACidity with the Measured PH and Conductlvltv》.
对阻燃型软电缆所要求的阻燃性能指标,是根据GB/T18301-2001《电缆在火焰条件下的燃烧试验第3部分:成束电线或电缆的燃烧试验方法》标准的规定而确定其电缆的材料要求、产品结构和相应的试验方法;对于耐火性试验,并考虑到电缆在火焰中会散发有害气体,造成&二次灾害&,所以还规定了对电缆燃烧时发烟量进行试验,按IECl034-2(1991)《电缆在特定条件下燃烧的烟浓度试验方法第二部分试验步骤和要求》以及燃烧时析出气体按IEC754-2(1991)《取白电缆的村料燃烧时析山气体的试验第二部分用测量PH值和导电率来测量气体酸度的方法》进行试验。
-
In order to examine the safety of Evening Primrose Oil Capsule in toxicology, a series of tests are performed, including the acute peroral toxicity test in mice, Ames test, PCE micronucleus test in Bone Marrow cells on mice, sperm abnormality test on mice and 30 days feeding test on rat.
为了探讨其毒理学安全性,本研究利用小鼠急性经口毒性试验、鼠伤寒沙门氏菌/哺乳动物微粒体酶试验、小鼠骨髓嗜多染红细胞微核试验、小鼠精子畸形试验、30天喂养试验等方法对月见草油胶囊进行了食品安全毒理学检测。
- 相关中文对照歌词
- The Test
- Take The Test
- Just A Test
- Test
- Test Of Time
- Test Drive
- The Test
- Test It Out
- Paternity Test
- Test My Patience
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。