查询词典 test-tube
- 与 test-tube 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First, railway signal test system history is reviewed,and deficiencies in current test system are analyzed. Secondly, system functions and global architecture are designed to meet the test requirement; Thirdly,hardware design and software design are described in detail, then test results are exampled and analyzed;Lastly, conclusion and expection are made.
首先对铁路信号试验车的历史及现状进行了回顾,分析了目前信号试验车测试系统的不足;然后,进行了铁路信号测试需求分析,确定了系统测试功能及总体结构;对系统的硬件设计和软件设计进行了详细描述,并对现场测试结果进行了举证和深入分析,结尾作出结论及展望。
-
This test suite can serve as a regression test suite in the future, or as a fast-running build verification test suite, a test suite that can be executed every time a code change is submitted to the source repository.
该测试套件可作为将来回归测试套件,或作为一个快速运行的版本验证测试套件,一个测试套件,可以在每次执行代码更改提交到源代码库的时间。
-
The study contains the following purposes:(1) exploring the test-structure of Raven's Advanced Progressive Matrics,(2) examining the process of solving APM,(3) investigating possible factors that affect the construct validity of APM,(4) developing New Figure Reasoning Test, using cognitive measurement approach test design model and computer technology,(5) contrasting APM and NFRT from the viewpoints of test designing and empirical analysis, and (6) developing an automatic item-generation and online testing system for NFRT.
本研究的研究目的为:(1)探讨APM的测验结构;(2)依据认知测量取向,探讨APM的解题历程;(3)探讨影响APM之构念效度的可能因素;(4)根据「认知测量测验编制模式」和电脑技术发展「新编图形推理能力测验」,并验证该测验的构念效度;(5)从测验编制和实证分析比较APM与「新编图形推理能力测验」;(6)发展「新编图形推理能力测验」的「自动命题及施测系统」。
-
These new test cases can be run as part of a test script so that test program creation is simplified and test times are minimised.
这些新的测试案例可运行的一部分,测试脚本,使测试程序简化创建和测试时间减至最少。
-
The experimental group received 10 weeks of walking exercise training, at 50 minuets per session, 5 days per week and at a exercise intensity limit between 60% and 70% maximum heart rate. The control group received ordinary special education curriculums. All participants completed three times of the PACER(Progressive Aerobic Cardiovascular Endurance Run)20-Meter Shuttle Run test and test for the average walking speed during 1600 meters:before the experiment started , after the experiment and the follow-up test at the fourteenth week of the experiment started. All results from these tests were recorded and analyzed by descriptive statistics; repeated measure t-test; the one way analysis of covariance .
实验组进行星期一至星期五每天一次,合计每周五次,每次50分钟,总共10周,运动强度为60%-70%最大心跳率的步行运动;控制组接受学校安排的特殊教育课程,两组学生在进行步行运动前、后以及实验处理结束后第四周,分别接受PACER渐进性心肺耐力跑-20 公尺和1600公尺的步行速度之测验,并将所得的成绩以描述性统计、重复量数t 考验、单因子共变数分析进行统计考验,评估实验处理之运动与维持成效。
-
Behavior test included spatial learning and memory test, passive avoidance behavior test, open-field behavior and hole-board test.
行为学测试包括空间学习记忆力测试、被动回避行为测试、旷场行为测试和圆洞探索试验。
-
Die Bonders, Wire Bonders, Packaging Tools, Assembly Robotics, Assembly Test, Wafer Probers, Device Handlers, Other Automatic Test Equipment, Reliability Test, Failure Analysis Test Instruments, Clean Room, Gas Handling Equipment, Chemical Handling Equipment, Facilities Equipment, Vacuum Pumps, tape and reel, etc.
模具粘合机,焊线机,包装工具,装配机器人,装配测试,晶圆probers ,装置的处理,其它产品自动测试设备,可靠性试验,失效分析测试仪器,无尘室,气体处理设备,化学处理设备,设施,设备,真空泵,磁带和卷轴等。
-
Its main production environment testing, the mechanical material testing equipment, main products have Standard / Programmable constant temperature and humidity machine, walk-in constant temperature and humidity room, the aging chamber, hot and cold impact testing machines, vibration test machine, drop test machine, compression tension tester, salt spray test machine, ultraviolet radiation, rain test chamber, sand and dust and all kinds of oven chamber, but also according to customer demand for design and production of non-standard environmental testing equipment and various types of large-scale trial into the climate Room.
其主要生产环境试验、力学材料试验设备,主要产品有标准型/可程序恒温恒湿机、步入式恒温恒湿室、老化试验箱、冷热冲击试验机、振动试验机、跌落试验机、压拉力试验机、盐雾试验机、紫外光照、淋雨试验箱、砂尘试验箱及各类干燥箱,还可根据客户的需求设计生产非标环境试验设备及各类大型步入气候试验室。
-
Vocabulary test is to test subjects' vocabulary size and sentence-making test is to test their competence of lexical application.
词汇测试用来测试受试者的词汇量的大小,造句测试用来测试受试者的词汇应用能力。
-
The towel heating rack manufactured by JIN CHU YI Hardware are approved to have good quality by high voltage resistance test, creepage test, pulling force test, destroy test.
金厨艺五金之-电热快干式毛巾架经过耐电压测试、漏电测试、拉力测试、破坏性测试(最高瞬时耐电压达3000w仍能正常使用)。
- 相关中文对照歌词
- The Test
- Take The Test
- Just A Test
- Test
- Test Of Time
- Test Drive
- The Test
- Test It Out
- Paternity Test
- Test My Patience
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。