英语人>网络例句>test-taking 相关的网络例句
test-taking相关的网络例句

查询词典 test-taking

与 test-taking 相关的网络例句 [注:此内容来源于网络,仅供参考]

OHR has no toxic effect after acute toxicity test,subacute toxicity test and descendent toxicity test,it is in line with"eatables safety toxicology appreciation procedure and methods", furthermore,it could boost the level of little mice'blood urea and lactic acid,this suggest that OHR has effect in alleviating physical fatigue.

并且能提高小鼠清除血乳酸和尿素能力,提示沙棘油有缓解体力疲劳作用。

According to the pertinent data research knew that,The overseas equipment is makes about 1000 times in the test platform, eliminates the initial period breakdown in the test chamber, because the direction valve use reliable curve is the bathtub curve, namely use initial period and the later period failure rate is highest, therefore carries on the movement and several dozens hour circulation flushings before the installment to the valve, causes the high breakdown the use initial period to pass in the test chamber, thus has obtained the high equipment reliability.

据有关资料研究得知:国外设备是在试验台上作1000次左右,将初期故障消除在试验室,因为方向阀的使用可靠性曲线是浴盆曲线,即使用初期及后期故障率最高,因此在安装前对阀进行动作及几十小时循环冲洗,,使高故障的使用初期在试验室度过,从而获得了高的设备可靠性。

The high temperature abrasive wear test was carried out on a high temperature friction and wear test rig whose test atmosphere can be controlled.

结果表明:碳化物的抗氧化稳定性以及碳化物与基体的氧化大无畏同性对合金在大气气氛中的高温耐磨性起着重要的作用。

High-pressure gas shell test should be carried out after hydraulic test case, and have appropriate security measures, the gas shell test pressure should be under 100 (30 ℃) the maximum allowable pressure of 110% or by order of the provisions of , does not allow a visible leak.

高压气体壳体试验应在液压壳体试验之后进行,并要有相应的安全防护措施,气体壳体试验压力应是100下(30℃)时最大许用压力的110%或按定单中的规定,不允许有可见的泄漏。

I pre-June 24 came to 月经, 7 next month, August 3 to go to the hospital urine test was negative in the August 5 negative home test paper, test August 7 found positive, August 16 so the doctor's advice to go to the hospital super-b, progesterone capsule 14mm × 9mm, no germ tube and the original heart throb, August 26 to check once again to go to the hospital, doctors do blood tests so that the normal, the doctor September 16 proposed to do super-b, August 30 due to early detection of brown discharge, I am afraid of blood, on the rush to the hospital, the doctor let me do a b-chiu, a progestin intrauterine sac visible echo progesterone capsule 14mm × 22mm × 16mm, ring integrity, and no germ.

我前期6月24日来到月经,7月份未来,8月3日去医院尿检为阴性,8月5日在家用试纸测试为阴性,8月7日测试发现为阳性,8月16日去医院医生建议做b超,孕囊14mm×9mm,未见胚芽及原始心管搏动,8月26日再次去医院检查,医生让做血检查结果正常,医生建议9月16日再做b超,因8月30日早发现褐色分泌物,我担心是血,就赶紧去了医院,医生让我在做了一次b超,子宫腔内可见一孕囊回声,孕囊14mm×22mm×16mm,光环完整,未见胚芽。

Correlation between Test Weight and Kernel DevelopmentDue to the positively and significantly correlation between test weight and kernel specific gravity, it was reasonable to discuss the changes of specific gravity instead of test weight during grain filling. Fresh and dry specific gravities of maize kernels were studied after pollination till to the maturity.

玉米容重与籽粒发育的关系由于容重与籽粒比重间的高度正相关性,用比重在籽粒发育过程的变化趋势来间接反映籽粒灌浆过程中容重的变化是完全可行的。

The arrangement of braces is X type. The braces is H175x175x11x7.5, same as the second test of TCBF. Because of additional knife plates, the braces length in this test is a little shorter than the second TCBF test. The gusset plate design use the UFM instead of ellipse bending design method.

试体高6.66公尺,宽6.7公尺,斜撑排列形式为大X形,斜撑尺寸为H175x175x11x7.5,与第二次TCBF试验采用之斜撑相同,但本研究因需配置额外的连接板而使得斜撑长度略短,接合板则采用规范建议之UFM进行设计,与第二次TCBF椭圆形凹折设计不同。

Shaking table test on 1/10 building model was carried out. Through hammer blow test and sine wave swept test, the model's parameters were acquired. By earthquake wave excitation, the model's earthquake response, failure traits and aseismic property were gained. Through ratio conversion, prototype's mode parameters and aseismic capability were studied.

进行了1/10比例模型房屋模拟地震振动台试验,通过锤击与正弦波扫频试验得出模型房屋的模态参数,通过地震波激励试验得出模型房屋的地震反应、破坏特征以及抗震性能,通过相似比换算研究了原型结构的模态参数与抗震能力。

Move the high side hose to test cock No. 4, low side hose to test cock No. 3 and open both test cock No.

Step 7 将高端软管移到测试旋塞4号上,低端软管移到测试旋塞3号上,然后开启测试旋塞3号和4号。

Move the high side hose to test cock No. 4, low side hose to test cock No. 3 and open both test cock No.

Step 7 将高端软管转移到测试旋塞4号,低端软管转移到测试旋塞3号,开启两个测试旋塞3号和4号。

第53/500页 首页 < ... 49 50 51 52 53 54 55 56 57 ... > 尾页
相关中文对照歌词
There's A Man Going 'Round Taking Names
Something
Test Of Time
Put It To The Test
Across The Nation
Across The Nation
Piss Test (Interlude)
Test Drive
Truth
Test Drive
推荐网络例句

Vishnu entered a dark fourth dimensional dream that did not support his field or continued life.

毗瑟挐进入了一个第四密度的黑暗梦想,那里并不支持他的能量场或继续生命。

Leaders and decision-making persons use it to collect the data, including the information of unit work, handing in fee, oweing fee, prepaying fee,changing and afterpaying and account transfering of joining-insurance employee, and account paying of all kinds of insurances from hospitalization insurance institutions.The collected data is picked up, organized, switched and showed to user.

该子系统主要面向各级领导、决策分析人员;从各个医疗保险经办机构和定点医疗机构采集数据,包括在各个医疗保险经办机构处理的单位办公信息,单位缴费、欠费、预缴费信息,参保职工变更信息,参保职工增减变动信息,参保职工补缴信息,参保职工帐户划拨信息:包括各定点医疗机构处理的各险种帐户支出信息,各险种的统筹金支付信息等;将采集的数据提取,组织和转换,然后展示给用户。

BaTan focus on the town in order to speed up the construction of the town as an opportunity to carry first to target in order to handle the project for a breakthrough to achieve industrialization and urbanization as a development engine.

八滩镇以加快重点镇建设为契机,以进位争先为目标,以项目突破为抓手,把实现工业化、城镇化作为发展的重要引擎。