查询词典 test point
- 与 test point 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
What integrated circuit designs job is flourishing bring many design verification to test requirement, check the one link in catenary of industry of since integrated circuit, also be the crucial point that test and verify of integrated circuit product leaves factory, bougie gets stuck even if upright between automatic test system and IC chip, the accurate interface that parameter of IC product function checks before be being used at enclosing gets stuck, the design of it and integrated circuit and test are enclosed inseparable.
集成电路设计业的畅旺带来大量的设计验证测试需求,测试既是集成电路工业链中的一环,也是集成电路产物验证出厂的要害,探针卡就是介于主动测试系统与IC芯片之间,用于封装前测试IC产物性能参数的慎密界面卡,它与集成电路的设计和测试封装密不成分。
-
Performance testing, in the document transmission system performance, under the premise of design performance test plan, and formulate plans for the core business point set scene, establish concurrent users, this paper elaborates on the core business is the load and the pressure test and continuous stability test design.
性能测试方面,在确定了公文传输系统性能指标的前提下,设计性能测试方案,并制定计划,对各个核心业务点设置场景,确立并发用户数,本文主要阐述的是对系统核心业务进行的负载和压力测试以及持续稳定性测试的设计。
-
The useful and important tests of sensibility are: testing the vibratory sensation with tuning fork, vibrometer testing for vibratory thresholds, von Frey testing (determined by Semmes- Weinstein nylon monofilaments or Pressure- Specifying Discriminator) for cutaneous pressure thresholds, measurement of static and moving two- point discrimination with the Disk- Criminator, Moberg's ninhydrin test, O'Rain skin wrinkling test, Picking- up test, Tinel's sign and electrodiagnostic test.
此文对临床上重要且实用的皮肤感觉功能测定方法如音叉皮肤振动觉定性检查、振动觉阈的振动器定量测定、Semmes-Weinstein尼龙单丝或Pressure-SpecifyingDiscri minator行皮肤压觉阈的测定、用Disk-Criminator进行静止和运动的两点辨别觉测定、茚三酮试验、O'Rain指腹皮肤皱缩试验、捡物试验、Tinel's征电生理检查以及这些检查方法在神经断裂、神经卡压及神经损伤或修复后的恢复等情况中的应用和评价作一讨论。
-
In the test model, a new type joint connection of one-way hinge is put forward for achieving pure-hinge connection; In the shape forming test, because of the little post-tensioning forces, a new type loading method of twisting nut for drawing wire is put forward in stead of jack tensioning for solving the questions, such as super-tensioning and the nonuniform rate of loading; In the loadtest, a new type vertical loading system of multiple-point fixed pulley is put forward for solving the questions, such as more loading points and larger vertical force at one loading point.
试验模型中,为了实现纯铰接连接,提出了一种新型的单向铰节点连接形式;成形试验中,由于后张拉力较小,提出了一种新型拧螺母抽钢丝的加载方法,很好的解决了千斤顶易超张拉和加载速率不均匀等问题;承载力试验中,为了解决加载点较多、单点加载较大的问题,提出了一种新型多点定滑轮竖向加载系统。
-
In the test model, a new type joint connection of one-way hinge is put forward for achieving pure-hinge connection; In the shape forming test, because of the little post-tensioning forces, a new type loading method of twisting nut for drawing wire is put forward in stead of jack tensioning for solving the questions, such as super-tensioning and the nonuniform rate of loading; In the load test, a new type vertical loading system of multiple-point fixed pulley is put forward for solving the questions, such as more loading points and larger vertical force at one loading point.
试验模型中,为了实现纯铰接连接,提出了一种新型的单向铰节点连接形式;成形试验中,由于后张拉力较小,提出了一种新型拧螺母抽钢丝的加载方法,很好的解决了千斤顶易超张拉和加载速率不均匀等问题;承载力试验中,为了解决加载点较多、单点加载较大的问题,提出了一种新型多点定滑轮竖向加载系统。
-
The analysis on the test result shows that the temperature distribution in CFST members caused by solar radiation is nonlinear,and the nonlinear character is most evident when center point of concrete gets its lowest temperature. The temperature of the center point is affected by various directions, especially the strong potential. In the side exposed to the sun in the afternoon, apart from the center point, temperature varies laggardly when the point of concrete in the same series is more close to the center. But in the side not exposed to the sun in the afternoon, temperature varies laggardly when the point of concrete in the same series is more close to the center.
结果表明,日照作用下截面的温度场为非均匀场,混凝土中心的温度达到最小值时,截面温度场的非线性特性最明显,圆心点的温度受各个方向温度的共同作用,更多地受到强势方向的影响;下午时处在向阳面的各系列,同一系列上混凝土各点温度变化随直径缩小趋缓,越靠近圆心,温度变化越缓和,对外部环境的影响呈滞后现象越明显;而在下午时处在背阴面的各系列除圆心点外,同一系列上越靠近圆心的混凝土测点,温度变化越缓和。
-
The point of a unit test is not to test every possible input, but to test a representative sample.
单元测试的关键不在于所有可能的输入,而是一个有代表性的样本。
-
2About the consistency between the questions, after statistics testing the point biserial correlation coefficient of each question, we find that all mathematics achievement test questions and hematics aptitude test questions both have consistency, and they are positive correlation with the point of each question, except the ninth question from mathematics aptitude test.
在试题间的一致性方面,经过每一道题目的点二系列相关系数经过统计考验后,发现「数学成就测验」全部试题,「数学性向测验」除第19题外,皆具有试题间的一致性,与每一道试题的得分皆成正相关。
-
6 Batteries, as described in 4.25.10, and battery chargers.(1) Battery connectors must be constructed of material with a V-0 flame rating or have a glow wire ignition rating of 750°C.(2) The battery charging system shall not present a risk of fire due to a short-circuit condition applied to any point in the length of a charger/battery interconnecting cable when tested inaccordance with 8.19.7.(3) During charging, battery-charging voltages shall not exceed the recommended charging voltages when tested in accordance with 8.19.6.(4) Battery chargers must be certified to the appropriate current national standard, for example UL, CSA, or equivalent standards body. 8.19.6 Battery Overcharge Test—Each battery shall be charged with its intended charger continuously for 336 h. The test shall not result in the release of electrolyte, or cause explosion or fire. 8.19.6.1 If the battery can be charged in the vehicle, place the battery in the vehicle and connect it to the charging circuit. Drape the charger, cable, and battery with a double layer of cheesecloth. The test shall not result in ignition of the cheesecloth or in the release of electrolyte.
4.25.10.6 电池(如4.25.10中的描述)和充电器(1)电池的连接器必须是使用UL94V0防火等级的材料做成的,或使用燃点为750度的发热线(2)按照8.19.7测试时,当在充电器和电池间的导线上的任意一点发生短路时,电池充电系统不允许出现着火的危险(3)充电时,按照8.19.6的测试方法,充电电压不允许超过推荐的充电电压(4)电池充电器必须通过相应的现行国家标准的认证,比如UL,CSA或等同的标准机构 8.19.6电池过充测试---每个电池都需要采用其默认的充电器连续充电336小时,测试不允许导致电极的泄露,导致爆炸或火灾 8.19.6.1若电池可以在交通工具上使用时,将电池放到交通工具上,并将之与充电电路连接起来,用双层粗棉布将充电器,连接线和电池遮挡起来。
-
The test items includesingle-point height sound level test and multi-point sound level test in a certain height range.
测试项目包括单点高度声级测试和一定高度范围内的多点声级测试。
- 推荐网络例句
-
For a big chunk of credit-card losses; the number of filings (and thus charge-off rates) would be rising again, whether
年美国个人破产法的一个改动使得破产登记急速下降,而后引起了信用卡大规模的亏损。
-
Eph. 4:23 And that you be renewed in the spirit of your mind
弗四23 而在你们心思的灵里得以更新
-
Lao Qiu is the Chairman of China Qiuyang Translation Group and the head master of the Confucius School. He has committed himself to the research and promotion of the classics of China.
老秋先生为中国秋阳翻译集团的董事长和孔子商学院的院长,致力于国学的研究和推广。