英语人>网络例句>test chart 相关的网络例句
test chart相关的网络例句

查询词典 test chart

与 test chart 相关的网络例句 [注:此内容来源于网络,仅供参考]

Is a professional electrical test and measurement and control equipment development, manufacturing and marketing high-tech enterprise, main products has: DC wire tester, AC wire tester, testing machine swings, sudden pull test machine, static tensile testing machine, aging testing machine, cable testing machine hoists a full range of wire and cable test equipment and other products.

东莞线友科技有限公司是一家专业从事电气测试测量与控制设备开发、生产和销售的高科技企业,主要产品有:DC线材测试仪、AC线材测试仪、摇摆试验机、突拉试验机、静态拉力试验机、老化试验机、电线吊重试验机全系列的电线电缆试验设备等产品。

Electrical equipment test equipment General Wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes.

七。电工器材试验设备线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

Seven. Electrical equipment test equipment integrated wire tester, plug wire bending test machine, wire thermostat ball pressure testing machine, 90 peel strength test machine, plug wire pull testing machine penetration resistance, combustion testing machine, plug-line static tensile testing machine can be flexibility around the wire testing machine, wire print fastness testing machine, wire elongation testing machine, testing machine drum plugs, standard light boxes. Eight.

线材综合测试仪、插头引线弯折试验机,电线恒温球压试验机、90°剥离强度试验机、插头线突拉试验机、耐燃烧试验机、插头线静态拉力试验机、可绕电线柔软度试验机、电线印刷体坚牢度试验机、线材伸长率试验机、插头滚筒试验机、标准光源箱等。

Presenting subjects manipulated mental workload with five tests, including Raven's Standard Progressive Matrices and four subtests of Wechsler Intelligence Scale for Chinese-Children revision in 60 to 70 minutes. Reading velocity, mistake rate, index of mental capacity in Number Cancellation Test and test time, the right number of tracking lines in Visual Tracking Test were calculated and compared between the two groups.

以瑞文标准推理测试、韦氏智力量表中部分项目测试60~70min作为脑力作业负荷,负荷前、后分别进行划消试验和视觉追踪测验,统计划消试验的阅读速度、错误率、脑力工作能力指数,统计视觉追踪试验的完成时间及正确数,分析脑力作业负荷对肥胖组和对照组各指标的影响及2组间的差异,分析肥胖青少年注意能力的特点。

You execute the test manually while the test tool sits in the background and remembers what you do. It then generates a script that you can run to re-execute the test. It's a great idea - that rarely works.

测试者在后台运行测试工具,再手工执行测试,工具将测试者的动作记录下来,自动生成一个脚本,以便测试者可以重新运行测试动作,这虽然是个好想法,但对测试工作本身并无太大意义。

Jiangsu Bao Ying decay BAOYING pump covers an area of 45,000 square meters, 26,000 square meters building, with assets of 20,050,000 yuan, the existing types of professional and technical personnel more than 120 people, has the domestic advanced vehicles, milling, planing, grinding, and Play various types of processing equipment more than 200 sets of a set of physical and chemical testing equipment, vibration equipment, a set number of hours, and has formed the test flow of 10000m3 / h, a diameter of 20 inches, power of 800KW capacity within the pump test to meet the test of various Pump performance requirements.

江苏宝应县盈宝耐腐泵厂占地45000平方米,建筑26000平方米,拥有资产2005万元,现有各类专业技术人员120多人,拥有国内先进的车、铣、刨、磨、插各类加工设备200多台套,理化试验设备一套,振动时数设备一套,已形成测试流量为10000m3/h、口径为20英寸、功率为800KW以内的水泵测试能力,可满足测试各类水泵性能指标的要求。

Companies rely on some of Xi'an University of Electronic Science and Technology professor, research institutes of technology support, long-term cooperation in research and development power automation, electrical testing, electrical testing equipment, including: Switching mechanical properties tester, vacuum tester, cable fault tester, cable test Management systems, cables altimeter instrument, relay calibrator, DC high-voltage generator, or flow, test transformers, DC Resistance Tester, loop resistance tester, and change than the group tester, MOA tester, Transformer test aircraft, dielectric loss tester, ground resistance tester, such as electric Zhaoou table.

公司依托西安电子科技大学部分教授,科研院所的科技支持,长期合作研发电力自动化、电力测试、电气试验仪器设备,包括:开关机械特性测试仪、真空度测试仪、电缆故障测试仪、电缆测试管理系统、电缆测高仪、继电保护校验仪、直流高压发生器、升流器、试验变压器、直流电阻测试仪、回路电阻测试仪、变比组别测试仪、氧化锌避雷器测试仪、变压器试油机、介质损耗测试仪、接地电阻测试仪、电动兆欧表等。

The behaviors of SRC beam transferring structure, which is the major research of this dissertation, is studied from four aspects:(1)Pseudo-static test of transfer structure shaking table test of a whole frame model with transferring story and a field measurement;(2)Push-over analysis;(3)the test research and theoretical analysis of joints for SRC transferring frame;(4)the research on the creep and shrinkage of SRC transfer beams.

本文的主要工作是研究型钢混凝土梁式转换框架结构的受力性能问题,为此,从以下四个方面:①转换框架结构的拟静力试验、整体结构的模拟地震振动台试验和施工现场实测;②静力弹塑性分析;③型钢混凝土转换框架节点的试验研究与理论分析;④施工阶段转换大梁的徐变、收缩特性的研究,展开了对课题的研究。

China's high-speed railway pre-selection of the three types of ballastless track indoor scale model is the laying of the performance test and the first two structure of a bridge and tunnel test shop and field test.

对我国高速铁路前期选用的三种结构型式无碴轨道进行室内实尺模型铺设及各项性能试验,对前两种结构型式进行桥上和隧道内试铺及现场试验。

Zhu Meng in detail discussed the test automation tool principle from test automation tool angle, as well as introduced the Nuint use vividly, and that made the meeting members have a deep understanding on the important of the test and on how to carry on it.

朱猛从自动测试工具的角度,详细地讨论了自动测试工具的原理,以及生动地介绍了Nuint的使用,使得到会会员对于测试的重要性以及怎样进行测试有了深刻的认识。

第70/500页 首页 < ... 66 67 68 69 70 71 72 73 74 ... > 尾页
相关中文对照歌词
Test Of Time
Put It To The Test
Start Well
Across The Nation
Across The Nation
Piss Test (Interlude)
Test Drive
Truth
Test Drive
I Cram To Understand
推荐网络例句

You can snipe the second and third union leaders from this position.

您可以鹬第二和第三工会领袖从这一立场出发。

Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.

针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。

This is a very big challenge to developers especially that Ajax is constantly changing.

这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。