查询词典 test charge
- 与 test charge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
China's high-speed railway pre-selection of the three types of ballastless track indoor scale model is the laying of the performance test and the first two structure of a bridge and tunnel test shop and field test.
对我国高速铁路前期选用的三种结构型式无碴轨道进行室内实尺模型铺设及各项性能试验,对前两种结构型式进行桥上和隧道内试铺及现场试验。
-
Zhu Meng in detail discussed the test automation tool principle from test automation tool angle, as well as introduced the Nuint use vividly, and that made the meeting members have a deep understanding on the important of the test and on how to carry on it.
朱猛从自动测试工具的角度,详细地讨论了自动测试工具的原理,以及生动地介绍了Nuint的使用,使得到会会员对于测试的重要性以及怎样进行测试有了深刻的认识。
-
METHODS The killing effects of NDV-L on cancer cells and normal cell were observed by means of plaque assays, HA titer test and MTT test. The inducing effects of NDV-L on apoptosis were observed by means of Giemsa's dying test, phase contrast light microscopy, transmission electron microscope, DNA extraction, and flow cytometry.
通过噬斑形成单位、HA效价、MTT法等方法检测NDV -L对细胞的杀伤作用;通过Giemsa's染色法、倒置相差显微镜、透射电镜、DNA凝胶电泳、流式细胞仪检测NDV -L诱导肿瘤细胞凋亡的作用。
-
Be familiar with test software development and test solution development and test equipments technology.
熟悉测试软件开发,测试方案和测试设备。
-
Based on a thorough investigation of the engineering geological condition for the reservoir region of the Huizhou Pumped Storage Power Station, the in-situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass.
摘要在对惠州抽水蓄能电站库区工程地质条件进行详细调查的基础上,采用现场试坑注水和钻孔注水、压水试验等方法了解岩土体的透水性。
-
The test has been done to simulate the movement of ground fracture after surface water soaking in. The test result has been described and the causes of differential subsidence on the bottom of test pit have been analyzed from two aspects (deformation of loess collapse and slip and subside of wet soil mass along fracture).
通过对试验的几种不同沉降关系曲线和试坑沉降变形等值线图的描述,文章从可能引起试坑产生不均匀沉降变形的两个方面黄土湿(来源:ABC论4c文网www.abclunwen.com陷变形、浸湿土体沿裂缝滑移下陷作了探讨,得出地表水与地裂缝的活动是相互促进相互影响的关系。
-
The fluid sediments imitating the rapidly deposited seabed silts were made in-situ, and an iron plate covered part of the test pit to cut off the effect of the marine hydrodynamics. By field-testing methods, such as static cone penetration test, field vane shear test, the variation of strength is measured at real time, and the marine hydrodynamics' impaction on the consolidation process of the sediments in the Yellow River Estuary was studied.
在黄河三角洲刁口叶瓣潮坪上,开挖2m ×1m×1m 的试坑,现场取土配置黄河口快速沉积形成的流体状堆积物,以铁板部分覆盖试坑隔绝波浪和潮流作用,利用微型贯入、静力触探、十字板剪切试验等原位测试手段,实时测定快速沉积的海床土强度,研究快速沉积的粉质海床土分别在自重条件下以及在波浪和潮波等水动力作用下的固结过程。
-
Work with test lead and other test team members to conduct test activities.
据预测,2010年全球离岸软件和IT外包收入将达到294亿美元。
-
The paper test-retest reliability evaluation of the test is an important indicator, which refers to the ability to test the stability of the level of actual student responses.
试卷再测信度是进行试题评价的一项重要指标,它是指考试能否稳定反应学生实际水平的程度。
-
The test items includesingle-point height sound level test and multi-point sound level test in a certain height range.
测试项目包括单点高度声级测试和一定高度范围内的多点声级测试。
- 相关中文对照歌词
- Charge Me Up
- Cops & Buns
- Charge It To The Game
- Batty Rider
- Supercharger
- Test Of Time
- HBIC
- Put It To The Test
- Don't Charge Me For The Crime
- Across The Nation
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。