查询词典 tendons
- 与 tendons 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the homogeneous model, the function of tendons is assumed to be uniform in some approximated way in order to form an equivalent homogeneous material within concrete. The formulation of the homogeneous model is same with that of general FEM for common continuum, let alone the elastic matrix being resultant of that of tendon and concrete. The computation is simple, but the approximate assumption makes this method cannot be generalized, because it only represents the constitution and function of tendons in such a rough way, that the numerical results are inaccurate. In the combined model, the function of tendon is considered by the stiffness matrix with rod element, then add it into the stiffness matrix of concrete by a rational way.
均匀类单元是设想将钢筋均匀弥散于整个单元中,使其成为一种连续均匀材料单元,这种单元的与一般有限元的单元刚度矩阵推导过程一样,只不过其弹性矩阵由混凝土和钢筋两部迭加而成的,此类单元刚阵计算简明而又不会扩大计算规模,但均匀弥散只是为计算简单而作一种假想,不贴近单元构造实际,也不符合实际作用效果。
-
Therefore, the author takes account the constructive features of the Reinforced Concrete structures to raise the concepts of identical and un-identical displacement field, and to establish new elements for plane and space RC structures, including plane quadrangle element with several tendons, plane triangle element with one tendon or several tendons, block element with several tendons and so on.
在深入研究已有钢筋混凝土组合与均匀二类单元,发现普遍存在没有充分考虑到钢筋实际作用的问题,从而导致了计算结果过于保守后,本文首先针对钢筋混凝土的构造特征,提出了同一位移场与非同一位移场的概念。
-
The constant nutritional arteries of the great saphenous vein-saphenous nerve on the medial foot: Perforator at medial side of the tendon of the tibialis anterior ,it is (2.27±0.43)cm distal to the intermalleolar line .it passes across the medial side of the tendon of the tibialis anterior and pierces the deep fascia between the upper and lower bundle of the inferior extensor retinaculum with a diameter of (0.72±0.04)mm;The length of it after piercing the deep fascia is (7.3±0.6)mm,It has an emerging rate of 95%; Perforator between tendons ,it is (3.02±0.39)cm distal to the intermalleolar line;it pierces the deep fascia between the tendons of tibialis anterior and extensor digitorum longus with a diameter of (0.57±0.06)mm ;The length of it after piercing the deep fascia is (7.4±0.6)mm .It has an emerging rate of 94%; A constant distal fascial perforator pierces the deep fascia between abductor hallucis muscle and medial side of first metatarsal bone (1.97±0.23)mm distal to the first metatarsophalangeal joint with a diameter of (0.50±0.03)mm.
足内侧大隐静脉-隐神经营养血管近端来自内踝前动脉较为恒定,外径较大的穿支有:踝间线远端(2.27±0.43)cm,经胫骨前肌腱内侧、伸肌下支持带上、下束间穿出,外径(0.72±0.04)mm ,穿出深筋膜的长度为(7.3±0.6)mm,出现率为95%;踝间线远端(3.02±0.39)cm,经胫骨前肌腱与趾伸肌腱穿出,外径(0.57±0.06)mm,穿出深筋膜的长度为(7.4±1.2)mm ,出现率为94%;3远端来自交通支最为恒定,外径较大的穿支于踇展肌与第一跖骨内侧缘之间穿出深筋膜,距第一跖趾并节近端(1.97±0.23)cm,直径(0.50±0.03)mm,穿出深筋膜的长度为(6.5±0.5)mm,出现率为100%。
-
So we suggest in design of the jacketing steel reinforced concrete frames prestressed with bonded tendons for storey-adding, in the area of earthquake fortification intensity of degree 8, steel reinforced concrete frames prestressed with bonded tendons situated in Class II and III soil with the height of ground floor is 8.1m and the number of added stories is 2 to 4, multiplying coefficient of bending moment of column, detail of seismic design of beam, column, and joint, should conform to a higher one earthquake-resistant grade.
建议套建增层预应力钢骨混凝土框架结构设计时对于8度抗震设防区建造在II、III类场地土上的底层结构层高为8.1m,增层层数为2层到4层的原二级抗震框架其柱端弯矩增大系数及相应的梁、柱、节点的抗震构造措施应按一级抗震框架取用。
-
Finally, the real function of the tendons jointing supports and fan shape tendons was investigated.
最后本文探讨了设置于支座间的预应力拉索形式和辐射状预应力拉索形式对网壳结构的施加预应力的影响。
-
The use of unbonded tendons is now common in prestressed concrete structures, and they may be in the form of internal or external tendons.With the increasing use of unbonded tendons in both new construction and retrofitting of existing structures, there is the need for a closer look at their design and analysis.
采用无粘结预应力是现在常见的预应力钢筋混凝土结构,并且它们可能采取的形式是内部或外部tendons.with越来越多地使用无粘结预应力在这两个新的建设和改造现有的结构,有必要建立更密切看看他们的设计与分析。
-
The method of calculating the bearing capacity of Normal Section in external unbonded prestressed beams is also suggested, which can be used to calculate the strength of concrete beams with straight unbonded tendons prestressing tendons and draped prestressing tendons with one or two support deviators.
计算结果表明,公式计算值与实测值接近,所建立的公式对直线预应力筋、具有一个转向块、两个转向块的折线形预应力等布筋方式的梁的承载力计算结果是能满足工程需要的。
-
The flexural capacity, deformation and failure modes of beams with different parameters can be analyzed using the program, such as types of plan and prestressed tendons(extrenal prestessed tendons, internal unbonded prestressed tendons, internal bonded prestressed tendons), jacking and effective stress in external prestressed tendons, configuration of the deviators, properties of tendon, ratio of span to effective depth of the beam and load pattern, initial loading state at tendon jacking, etc.(3) Nonlinear behaviors of the concrete beam prestressed with external or internal unbonded tendons were studied by the program developed.
本程序可以对任意截面型式的预应力(体外预应力筋、体内无粘结预应力筋、体内有粘结预应力筋)混凝土梁和普通钢筋混凝土梁进行非线性全过程数值分析计算,程序可以就转向块的布置方式、体外预应力筋纵断面形状、体外筋有效预应力的大小及材性、张拉预应力筋时梁的持荷状态等因素对体外预应力混凝土梁在外荷载作用下的强度、变形特征、破坏模式等的影响进行分析研究。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
- 相关中文对照歌词
- Tendons
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。