查询词典 system information
- 与 system information 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
RESULTS: The nature of meridians is probably the Regulation System of Directed Water Environment. That is, taking the continuous water environment of human body as the basis, especially the low resistance of flowing passage (14 meridians) as the trunk, the nerve system transmitting information quickly as the guide, the blood system transporting materials quickly as the source, and the point as the pivot, to create the coordination between the human body and environment and the whole and the local.
结果:经络的本质可能是人体定向水环境调控体系':就是以连续的人体水环境为基础,特别是循经低流阻通道为主干道,以信息快速传递的神经系统为主导,以物质快速运输的血液系统为源头,以穴位为枢纽,来反映人体与环境、人的整体与局部协调统一的功能调控体系。
-
Users logged news release system, the design of which ASP_NET Information Management System This is a terrific system.
用户登录新闻发布系统,其中的设计ASP_NET新闻管理系统,这是个很棒的系统!
-
In this system, the combined orientation model of DTWADGPS is established using the WADGPS, odograph, speedometer and roscope, etc. And the information of the multi-sensor is processed using the method of data fusion, which is used to resolve the accuracy and blind area problems of train position Combining the technology of GIS and GSM-R and the Expert System, the system of intellectualized train dispatch and management is established based on train positions and velocities acquired accurately.
系统采用WADGPS、里程表、车速仪、陀螺仪等构建分布式逆向WADGPS组合定位模型并对多传感器信息进行融合处理,解决列车定位的精度和盲区问题;在精确获取列车位置和速度的基础上,结合GIS和GSM-R技术和专家系统构建列车智能调度管理系统。
-
To establish an open, fair, equitable market operation rules, sound market system, establish and perfect market information system and an early warning reporting system, the increase of market self-regulation.
要建立公开、公正、公平的市场运行规则,健全市场体系,建立和完善市场信息体系和预警预报体系,增强市场的自我调节能力。
-
The realize method of ITC strategy in FSTP induction generation system is studied. In order to improve stable performance of FSTP induction generation system, SVM-ITC (ITC based on space vector modulation) is investigated. Creation method of reference voltage vector which includes change trend and magnitude information of flux link and torque is presented. Because there is no zero voltage vector in four-switch system, a method which employs opposite vector in equal time to replace zero voltage vector is proposed. Two vector modulation schemes are presented.
为提高容错型四开关三相异步发电系统的稳态性能,进行了基于空间矢量调制的瞬时转矩控制研究,提出了包含磁链与转矩变化趋势与大小信息的电压参考矢量生成方法;针对四开关系统无零电压矢量的情况,提出用等时间相反矢量来代替零电压矢量的作用,并给出了两种矢量调制方案。
-
On the basis of the fundamental theory of information optics, the Fourier transform and an iterative approach are used to calculate and analyze the point image of an optical imaging system the Point Spread Function (PSF of light intensity, to retrieve the phase of imaging system and then to obtain the wave font of the optical system.
基于信息光学基础理论,采用傅里叶变换和迭代算法计算分析了光学成像系统的星点图像(光强点扩散函数,PSF),实现了对光学成像系统位相的复原,获得了波像差信息。
-
This paper also points out that the employment of Distributed Control System and configuration software will ensure the compatibility of management information system and industry controlling system.
并指出集散控制系统和组态软件技术的采用将保证管理信息系统和工业控制系统的兼容性。
-
This thesis analyses and studies the up-to-date technology adopted in the Pilotage Supervisory Control Management Information System and the influence to the system performances. Moreover, a result of quantitative analysis is obtained by a comprehensive assessment to the system performances.
本文对宁波港引航监控管理信息系统建设过程中采用的新技术及其对系统性能产生的影响进行了分析与研究,并对采用新技术的系统性能进行综合评价,得到定量的分析结果。
-
Therefore,through the Geodatabase data model quoted by ArcGIS,the authors discussed the pipeline data organization and presented the system frameworks according to different requirements of application.The whole system design and function realization are accomplished by the combination of B/S and C/S architecture,which solved the problems such as management,application and dynamic ruled data-update of underground pipelines information.Meanwhile,the referenced scheme and basic idea for system construction of underground pipelines are provided in the paper.
为此,利用ArcGIS引入的Geodatabase数据模型,探讨数据的组织形式,根据不同的应用需求提出系统的框架结构,采用B/S和C/S架构相结合方式进行系统总体设计和功能实现,解决了地下管线信息管理、应用和法规保证的动态更新等问题,为城市地下管线的系统建设提供了借鉴方案和基本思路。
-
the digitized mapping technique is to combine the field data collection system with the computer assisted mapping system in surveys by computer technology.it aims to realize the information collected and processed digitally and automaticaity.the digitized mapping technique can cut short the working time,lighten the labor intensity and enhance the precision of the productions.the system consists of three parts,such as data input,data processing and data output.the survey-record digitized mapping technique is widely used in the digitized mapping working pattern.for its superiority over traditional plane-table mapping in accuracy and efficiency,the large scale digital mapping is becoming more and more popular.compared with traditional analogue mapping,digital mapping has more quality control pivotai points,and its contents and methods are more complex.with the appearance of new technology gps ,the coordinate of different levels controlling points may be surveyed in high precision and it has been applied widely in topographic survey.the operation process of gps electronic tachometer is introduced and its application in topographic survey is br
计算机应用论文,计算机论文, rtk ,全站仪,数字测图,地形测量, gps论文摘要:数字测图是在测量工作中利用电子计算机技术将野外数据采集系统与内业机助制图系统相结合,其目标是实现信息采集处理的数字化、自动化、信息化。数字测图可以缩短作业时间,减轻劳动强度,提高成果精度。数字测图系统主要由数据输入、数据处理和数据输出3部分组成,数字测图作业模式中测记式数字测图应用最为广泛。大比例尺数字测图正以其测图精度高,成图速度快等优势逐步的取代传统的,以平板仪为主的模拟测图。与传统的模拟测图相比,数字测图的质量控制关键点更多、内容与方法更为复杂。gps 新技术的出现,可以高精度并快速地测定各级控制点的坐标,在地形测量中已得到广泛地应用。本文介绍了gps 配合全站仪的作业流程,简要阐明了其在地形测量中的应用。在利用实测数据成图的过程中,解决一些常见的问题,并给出解决的办法及依据,同时给出一些有益的结论,以适应实际使用的需要。
- 推荐网络例句
-
I can not make it blossom and suits me
我不能让树为我开花
-
When temperatures are above approximately 80 °C discolouration of the raceways or rolling elements is a frequent feature.
当温度高于 80 °C 左右时,滚道或滚动元件褪色是很常见的特征。
-
The lawyer's case blew up because he had no proof.
律师的辩护失败,因为他没有证据。