英语人>网络例句>system engineering 相关的网络例句
system engineering相关的网络例句

查询词典 system engineering

与 system engineering 相关的网络例句 [注:此内容来源于网络,仅供参考]

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:"分涑入祊"分洪道工程地质条件分析、"分涑入祊"枢纽工程地质条件分析、"分涑入祊"葛九公路桥工程地质条件分析、"分涑入祊"327国道公路桥工程地质条件分析、"分涑入祊"鹅黄公路桥工程地质条件分析、"分涑入祊"小葛庄总干倒虹吸工程地质条件分析。

This problem involved many objective functions which had contradictions mutually and could not reconciled. According to different engineering requirements, the weighted and harmonic coefficient of each objective function was decided, and then it was changed to a single-objective optimization function. Engineering requirements on the system and related restrictions were given with the form of binding functions.

考虑问题所牵涉到的多个互相矛盾不可公度的目标函数,根据不同的工程要求,结合实践经验和计算经验确定各个目标函数的加权协调系数,然后将其表示为一个单目标优化函数;工程条件对系统的要求和相关限制,以约束函数的形式给出。

From the angle of engineering application, this article analysed the corrosion characteristics and damage causes of the current structural used concrete in the region of Hangzhou gulf, on the basis of on-site survey of all the Marine concrete projects in that area. Taking HPC used in Marine as research objective, this article put great emphasis on the influence of the composition cementing material system to concrete performance, and make a preliminary probe into the action mechanism of the composite effects of various mineral materials in improving the performance of concrete by laser measuring size machine and EMPA. Through experiments, the article discussed how chloride ingression in concrete will be effected by such factors as exposure time, chloride binding, environment temperature, stress and cracks conditions; and also analysed the symptoms of these factors in the model of concrete service life prediction by conference to all related research reports both home and aboard. On the foundation of abovementioned research, this paper brought up an engineering model of service life prediction of marine concrete, which is based on chloride-induced corrosion.

本文从工程应用的角度,在对杭州湾地区既有海工混凝土工程作实地调研的基础上,研究分析杭州湾地区既有海工混凝土结构的腐蚀特点和破坏原因;以海工高性能混凝土为研究对象,着重研究复合胶凝材料体系对混凝土性能的影响,并应用激光粒度仪、EMPA等分析手段,就复合胶凝材料的作用机理进行初步探讨;试验研究混凝土暴露时间、胶凝材料对氯离子的吸附、环境温度、应力和裂缝状态等因素对混凝土中氯离子迁移运动的影响,并结合国内外相关研究报导,探讨这些因素在混凝土使用寿命预测模型中的表征;在上述研究基础上,提出以氯离子侵蚀为基础的海工混凝土使用寿命预测的工程应用模型。

Nowadays, with the rapid development of cities and industries, human activities take on the characteristics of expansibility and instantaneousness, which produce much information data correspondently. The former information treatment methods in the field of soil, engineering can"t meet the users" demand on exactness and alternation. So the visual evaluation of liquefaction information system becomes the urgent task in soil engineering.

当今,随着城市化和工业化的加快,人类活动呈现出空间扩展性和时间瞬时性的特点,相应产生了大量的信息数据,原有的岩土工程信息处理方法已不能完全满足用户对信息的准确、直观、迅速、可交互等多样性需求,因此地震砂土液化的可视化评价信息系统是岩土工程界迫切需要解决的课题。

Meanwhile the heat recovery installment will select to the later actual engineering project in has the very good instruction significance. At the same time, in the economic analysis aspect, the article uses the new economic analysis method, calculates entire heat interchanger price which the Wuhan area the different function building air-conditioning system unit amount of wind may accept, this will call the roll of officers and assign them tasks to the Wuhan area later actual engineering project in the heat recovery installment selects has provided one directly, more convenient, more practical more and feasible method.

同时,在经济分析方面,文章采用新的经济分析方法,计算出武汉地区的不同功能建筑物空调系统单位风量可接受的全热交换器的价格,这一点将对武汉地区以后的实际工程项目中热回收装置的选用提供了一个更直接,更方便的,更切实可行的方法。

This paper points out the collaborative design oriented concurrent engineering includes two meanings.One is the design idea oriented concurrent engineering,the other is collaborative design based on web.2.This paper makes a general analysis of the context and research actuality of cooperative product commerce,and then points out that CPC is a kind of management idea and technical realization system based on cooperative product development,and it is a normalized method which comes out of the development ,change and introjection of external demand,management idea and IT tools in the aspects of cooperation,products and commerce.

同时指出面向并行工程的协同设计包括两方面的含义:面向并行工程的设计思想和基于网络的协同设计。2、论文对协同产品商务的产品背景、研究现状作了全面的分析,指出协同产品商务是基于协同进行产品开发的一种管理理念和技术实现体系,同时它也是客观需求、管理理念以及IT工具在协同、产品、商务三个方面不断发展、演变和相互渗透融合而出现的一种归一化方案。

Crystal Rand is committed to all types of LED-based lighting and illumination products development, production and large-scale light engineering system integration, engineering design and construction.

晶蓝德致力于以LED为基础的各类灯光及照明系列产品的开发、生产和大型灯光工程的系统集成、工程设计和施工。

With the rapid development of science technology , the social environment changes at very fast speed. Uncertain factors and risks of construction engineering project are manifolding increasingly, in addition ,the risk management of construction engineering project has not method system for reference. During the process of project management ,most of people deal with things by right of their experiences. The scale of expense lead by risks is larger and larger.

随着科技的飞速发展和人们生活节奏的不断加快,社会环境瞬息万变,各建筑工程项目所涉及的不确定因素日益增多,面临的风险越来越多,再有我国的建筑工程项目风险管理没有一套完整的可供参考的方法体系,在建筑工程项目的管理过程中,大多数是凭自己的经验办事,风险所致损失规模也越来越大。

Is there a formal system to provide feedback to Product Engineering, Process Engineering and Operations for microsection failures?

是否当作业员发现切片试验不良时,有正式的系统反馈给前工程,生技?

In order to predict the engineering and hydro-geological conditions, Positioned along the tunnel alignment/axis on the surface with a long array, super power-supply High density electrical resistance exploration system To prevent engineering accidents from occurrence and to reduce mudflow, water gushing providing the tunnel construction with scientific and reliable grounds.

在公路隧道工程建设过程中,为设计和施工风险,对于埋深大、工程地质条件复杂的隧道,在地表沿隧道轴线采用长排列、大功率供电的高密度电法系统进行视电阻率成像探测,能科学地指导设计和施工,对不良地质段地段提前采取预防措施,能避免和减少塌方、涌水等地质病害的发生,可缩短工期和节约投资。

第23/98页 首页 < ... 19 20 21 22 23 24 25 26 27 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。