查询词典 suspension bridge
- 与 suspension bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
The configuration software through completes the stage suspension bar to the stage suspension bar system design realization the monitor and controls the stage suspension bar automation information system construction mainly to include the stage suspension bar long-distance monitoring, part and so on distribution line automated system, its goal uses the scene supervisory system, realizes data source automatic gathering, with the aid of the stage existing network resources auto loading to the real-time database, applies for all levels of control section provides the opening the data platform, causes the administrative personnel promptly to control and to grasp the suspension bar tendency, thus realizes the entire stage suspension bar movement process automation; And may to the real-time data which obtains carry on the statistics, the analysis, the optimization, thus for guaranteed the suspension bar equipment normal work, reduces the performance production cost to provide the important basis.
组态软件通过对舞台吊杆系统的设计实现完成舞台吊杆的监测和控制舞台吊杆自动化信息系统建设:主要包括舞台吊杆远程监控、配电线路自动化系统等部分,其目的是利用现场监控系统,实现数据源头自动采集,借助舞台现有网络资源自动加载到实时数据库,为舞台管理部门应用提供开放的数据平台,使管理人员及时控制和掌握吊杆动态,从而实现整个舞台吊杆运行过程的自动化;并可以对取得的实时数据进行统计、分析、优化,从而为保证吊杆设备正常运转、降低演出生产成本提供重要依据。
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
Armour rods (to be installed in suspension clamps) Parallel clamps Sub-Total, items 4.1-4.7 OTHER HARDWARE Counterweights for jumper or suspension insulator strings, including necessary device for attachement 50 kg 100 kg Sub-total, item 5.1 – 5.3 SPARES Insulator Units Type U160 Type U210BS Hardware for Conductor ACSR-BISON Complete set of hardware and fittings for suspension string Complete set of hardware and fittings for tension string Complete set of hardware and fittings for jumper string Complete set of hardware and fittings for transposition string Extra suspension clamps Extra tension clamps Extra tension joints Extra repair sleeves Extra vibration dampers Extra armour rods Extra spacers: for span for jumper alternatively spacer dampers Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Sub-Total, items 6.1-6.4 Sub-total, Items 1.4, 2.7, 3.8, 4.8, 5.4 and 6.5 Transfer to Summary, Schedule AS-1
装甲棒 平行夹具小计,项目4月1号至4月7号其他硬件重物跳线或中止绝缘子串,包括必要的设备attachement 50公斤 100公斤小计,项目5月1号至5月3号备件绝缘子单位型U160 类型U210BS 硬件导体钢芯铝绞线,拜森一套完整的硬件和配件的暂停字符串一套完整的硬件和配件的紧张字符串一套完整的硬件和配件的跳投字符串一套完整的硬件和配件的转字符串额外的悬浮夹额外的紧张局势夹额外的紧张关节额外的修理袖子额外的振动阻尼器额外的装甲棒额外的间隔:为跨度跳线或者间隔减震器硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒小计,项目6月1号至6月4号小计,项目1.4 , 2.7 , 3.8 , 4.8 , 5.4和6.5 (换乘摘要,附表1 仅供参考
-
Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .
本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的&桥面吊机杆件拼装法&,由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥&自行式跨缆吊机荡移&架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
First, theoretical analysis methods were used for the static analysis of the suspension bridge. The formulas for endogen force of the asymmetry suspension bridge through elastic theory were deduced and they were contrasted with those of the normal suspension bridge. The basic differential equation of deflection theory was deduced and the method of getting the roots of the equation was offered, and some simplified methods for deflection theory were presented.
推导了非对称式悬索桥弹性理论的内力计算公式,并对比了其与对称式悬索桥弹性理论的内力计算公式的异同;推导了非对称式悬索桥挠度理论的基本微分方程,并且给出了部分均布荷载作用下基本微分方程的试算方法;提出了挠度理论的几种简化计算方法。
-
Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."
六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"
-
Zhao Xian is the age-old cultural city, many historical sites, with the provincial cultural relics protection for more than 11 of which, Zhaozhou Bridge is the earliest existing, to preserve the integrity of the single shoulder open stone arch bridge, known as the "originator of a bridge in the world" and "Bridge the best in the world," American Society of Civil Engineers has been selected as the 12th Department,"the International Civil Engineering of historical monuments"; Yong-Zhaozhou Bridge and the bridge and said "sister bridge", there are similar; dharani Jingchuang Hailed as "the first Chinese Tower."
赵县是历史悠久的文化名城,名胜古迹众多,拥有省保以上文物11处,其中,赵州桥是现存最早、保存最完整的单孔敞肩石拱桥,被誉为&世界桥梁鼻祖&和&天下第一桥&,被美国土木工程师学会选定为第十二处&国际土木工程历史古迹&;永通桥与赵州桥并称&姊妹桥&,有异曲同工之妙;陀罗尼经幢被誉为&华夏第一塔&。
- 相关中文对照歌词
- Suspension
- Suspension
- Suspension
- London Bridge Is Falling Down
- Suspension (Acoustic)
- Suspension
- Liar
- Suspension Without A Suspense
- Mud Digger
- Under The Bridge
- 推荐网络例句
-
The work of this paper is as follows: 1. Looking back the progressing history of the linear motor, introducing the features of the elevator driven by linear induction motor, radicating the topic of this paper "the digital frequency variable control of the elevator bi-side direct driven by linear induction motor". The research of this paper covers the conventional VVVF control, space vector based VVVF control, vector control and DTC.
本文主要开展了以下几个方面的工作: 1 回顾了直线电机发展历史,电机的驱动技术演变,特别是针对直线电机的驱动,简要介绍了直线感应电机驱动电梯的优点和不同结构类型,对传统的v/f控制,基于空间矢量法的v/f控制,矢量控制,和基于电压空间矢量的直接转矩控制进行了比较,确立了本课题的研究主题:直线感应电机双边直推式驱动电梯的全数字变频控制。
-
The article combines with the treatment of a superficial civil air defense work to introduce how the grouting method to improve the performance of the backfill soil.
文章从治理漂浮人防工事的角度提出了注浆技术在改善回填土性质方面的应用,并详细阐述了注浆技术的施工流程。
-
I knew nor shyness nor fear, my life was boisterous.
我不懂得羞怯和惧怕,我的