查询词典 suspension
- 与 suspension 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
By simplifying air spring mechanics model, We analyze the damping characteristics for air spring suspension system of single degree of freedom, then educe optimal damp of air spring suspension with throttle hole under various situation and optimal diameter of throttle hole. The capability opinion guideline of air spring suspension system is analyzed.
通过简化空气弹簧的力学模型,对单自由度有阻尼空气弹簧悬架系统的阻尼特性分析,得出带有节流孔的空气弹簧在各种工况下的最佳阻尼及节流孔的最佳直径,并分析了空气弹簧悬架系统的性能评价指标。
-
The method of control calculation of Suspension bridge and the design of SBCS (Suspension Bridge construction Control analysis System) is mainly analyzed in this paper.
本文主要研究了悬索桥施工控制方法及施工控制分析计算软件SBCS(Suspension Bridge construction Control analysis System)。
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
A Some environmentalists are against the project on biological grounds.B What do the world's longest bridges have in common?D They're what will keep the bridge from going anywhere.E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individuals steel wires.F They will tip up the scales at 166, 500 tons more than half the bridge's total mass.__2__. They're suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to should the structure's mammoth weight,..
B。 分析:思路特点:注意空格后句中的词语使用特点:空格后面连续两句都涉及到了"suspension bridge/吊桥"因此判断空格处出现对"吊桥"进行讲述的句子的可能性最大,但被选项中没有该词出现,注意到空格后的句子中出现了代词They,该词的出现表明前面有复数的名词与之相呼应,而且They内容是指"桥",因此排除A,C和E, F(没有与They呼应的内容),所以答案是B。
-
A Some environmentalists are against the project on biological grounds.B What do the world's longest bridges have in common ?D They 're what will keep the bridge from going anywhere.E The second job will be to pull two sets of steel cables across the strait , each set being a bundle of 44,352 inPiduals steel wires.F They will tip up the scales at 166, 500 tons – more than half the bridge 's total mass.__2__. They're suspension bridges , massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to should the structure's mammoth weight,..
B。 分析:思路特点:注意空格后句中的词语使用特点:空格后面连续两句都涉及到了"suspension bridge/吊桥"因此判断空格处出现对"吊桥"进行讲述的句子的可能性最大,但被选项中没有该词出现,注意到空格后的句子中出现了代词They,该词的出现表明前面有复数的名词与之相呼应,而且They内容是指"桥",因此排除A,C和E, F(没有与They呼应的内容),所以答案是B。
-
A some environmentalists are against the project on biological grounds.b what do the world's longest bridges have in common?d they're what will keep the bridge from going anywhere.e the second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individuals steel wires.f they will tip up the scales at 166, 500 tons – more than half the bridge's total mass.__2__. they're suspension bridges, massive structures built to span vast water channels or gorges. a suspension bridge needs just two towers to should the structure's mammoth weight,..
b。 分析:思路特点:注重空格后句中的词语使用特点:空格后面连续两句都涉及到了"suspension bridge/吊桥"因此判定空格处出现对"吊桥"进行讲述的句子的可能性最大,但被选项中没有该词出现,注重到空格后的句子中出现了代词they,该词的出现表明前面有复数的名词与之相呼应,而且they内容是指"桥",因此排除a,c和e, f(没有与they呼应的内容),所以答案是b。
-
Armour rods (to be installed in suspension clamps) Parallel clamps Sub-Total, items 4.1-4.7 OTHER HARDWARE Counterweights for jumper or suspension insulator strings, including necessary device for attachement 50 kg 100 kg Sub-total, item 5.1 – 5.3 SPARES Insulator Units Type U160 Type U210BS Hardware for Conductor ACSR-BISON Complete set of hardware and fittings for suspension string Complete set of hardware and fittings for tension string Complete set of hardware and fittings for jumper string Complete set of hardware and fittings for transposition string Extra suspension clamps Extra tension clamps Extra tension joints Extra repair sleeves Extra vibration dampers Extra armour rods Extra spacers: for span for jumper alternatively spacer dampers Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Sub-Total, items 6.1-6.4 Sub-total, Items 1.4, 2.7, 3.8, 4.8, 5.4 and 6.5 Transfer to Summary, Schedule AS-1
装甲棒 平行夹具小计,项目4月1号至4月7号其他硬件重物跳线或中止绝缘子串,包括必要的设备attachement 50公斤 100公斤小计,项目5月1号至5月3号备件绝缘子单位型U160 类型U210BS 硬件导体钢芯铝绞线,拜森一套完整的硬件和配件的暂停字符串一套完整的硬件和配件的紧张字符串一套完整的硬件和配件的跳投字符串一套完整的硬件和配件的转字符串额外的悬浮夹额外的紧张局势夹额外的紧张关节额外的修理袖子额外的振动阻尼器额外的装甲棒额外的间隔:为跨度跳线或者间隔减震器硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒小计,项目6月1号至6月4号小计,项目1.4 , 2.7 , 3.8 , 4.8 , 5.4和6.5 (换乘摘要,附表1 仅供参考
-
The configuration software through completes the stage suspension bar to the stage suspension bar system design realization the monitor and controls the stage suspension bar automation information system construction mainly to include the stage suspension bar long-distance monitoring, part and so on distribution line automated system, its goal uses the scene supervisory system, realizes data source automatic gathering, with the aid of the stage existing network resources auto loading to the real-time database, applies for all levels of control section provides the opening the data platform, causes the administrative personnel promptly to control and to grasp the suspension bar tendency, thus realizes the entire stage suspension bar movement process automation; And may to the real-time data which obtains carry on the statistics, the analysis, the optimization, thus for guaranteed the suspension bar equipment normal work, reduces the performance production cost to provide the important basis.
组态软件通过对舞台吊杆系统的设计实现完成舞台吊杆的监测和控制舞台吊杆自动化信息系统建设:主要包括舞台吊杆远程监控、配电线路自动化系统等部分,其目的是利用现场监控系统,实现数据源头自动采集,借助舞台现有网络资源自动加载到实时数据库,为舞台管理部门应用提供开放的数据平台,使管理人员及时控制和掌握吊杆动态,从而实现整个舞台吊杆运行过程的自动化;并可以对取得的实时数据进行统计、分析、优化,从而为保证吊杆设备正常运转、降低演出生产成本提供重要依据。
-
For high voltages,overhead-line construction is generally used with suspension-type insulators.Steel towers,called pylons,serve to carry the insulators,with each conductor suspended from the bottom of a group or string of insulator units.
对于高电压、overhead-line普遍采用的建设与suspension-type绝缘体塔塔钢铁、服务、叫的绝缘体,每个导体停赛的底部或串绝缘子单位组。
- 相关中文对照歌词
- Suspension
- Suspension (Acoustic)
- Suspension
- Suspension
- Suspension
- Willful Suspension Of Disbelief
- Suspension Without A Suspense
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。