查询词典 surrounding rock
- 与 surrounding rock 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Through the analysis of characteristics in curve of deformation tests on the four kinds of rockmasses such as claystone, siltstone, feldspar-quartz sandstone and lithic sandstone underlain the dam foundation of Tingzikou Hydropower Station, it is thought that: the test deformation of thick lithic sandstone is mainly caused by slippage deformation of rock crystal lattice ; the test deformation of feldspar-quartz sandstone is mainly from small crevices in rock, compressive deformation of rock small holes and slippage deformation of rock crystal lattice; and the test deformation of thin layer claystone in which horizontal layer is developed and siltstone is mainly from compression deformation in interlayer, small crevices in rock, compression deformation of rock small holes and slippage deformation of rock crystal lattice.
通过对亭子口水利枢纽工程坝基下卧的黏土岩、粉砂岩、长石石英砂岩和岩屑砂岩等 4 种主要岩性的岩体变形试验曲线特征进行分析,认为:厚层岩屑砂岩的试验变形量主要来自于岩石晶格错动变形,长石石英砂岩的试验变形量主要为岩石内孔隙和空隙变形以及岩石晶格错动产生的变形,而层理较发育的薄层黏土岩和粉砂岩的试验变形量主要由层间压缩变形、岩石内孔隙和空隙变形以及岩石晶格错动产生的变形共同组成。
-
The study provided 2 kinds of finish systems which were pouring and anchoring rock-wool panel respectively. In general, galvanizing steel-meshwork using machine anchor can use all kinds of Rock-wool panel made in China. The interface mortar used in Rock-wool can prevent worker's hand from hurting and improve the water-proof capability and bonding intensity of rock-wool panel. The low-heat conductivity of polystyrene foaming granule paste improved the integer and anti-crack of system. The 2 kinds of rock-wool system all can resolve the current rock-wool panel applied difficulty in outer-wall external thermal insulation. The rock-wool external thermal insulation which has very nice fire-proof capability can apply any kinds of builds, especially high-rise buildings.
研究提出了现浇和锚固岩棉板2种涂料饰面构造做法,其中采用机械锚固热镀锌钢网施工可充分利用国产各类型岩棉板;岩棉板的界面砂浆处理可起到防止岩棉纤维扎手、增强岩棉板的防水性能和提高岩棉板与找平层的粘结强度的作用;聚苯颗粒的低导热系数过渡层提高了系统的整体性和抗裂性。2种构造做法经试验和工程试点证明均可解决目前国内岩棉难以应用在外墙外保温系统中的技术问题,具有优异防火性能的岩棉外保温系统可应用于任何类型的建筑中,在高层建筑和防火要求高的建筑中其优势更为明显。
-
In engineering application, we think that the rock laboratory experiments may simulate and reshow rock bursts considering the conditions of coupled static-dynamic loads and rock burst and their comparison. Energy demand of rock burst occurring is revealed through analyzing energy transition of rock failure process under coupled static-dynamic loads. At the same time, the rule of energy utilization under coupled static-dynamic loads is discovered; the measures for rock cracking by utilizing high stress condition in deep rock mass and energy utilization improving are found.
在工程应用方面,将动静组合载荷下岩石受力条件和岩石发生岩爆的条件及两者发生的现象进行了对比,认为室内动静组合加载试验可以模拟再现现场发生的岩爆,并通过分析动静组合载荷下岩石破坏过程中能量的转化来揭示岩石发生岩爆的能量要求,而且发现了动静组合加载能量利用的规律,找到提高能量利用率的措施和利用深部岩体受力状况来致裂岩石的手段。
-
In-situ monitoring gave the following results: 1 a tension stress zone occurred at the bottom of reinforced rock mass which indicated that the role of rock bolting was remarkable; 2 stress concentration at surrounding rock of main shaft was gradually transferred from shaft wall to complete rock mass far from shaft center; 3 vertical displacement was gradually smaller from up to bottom and from center to outside of the reinforced loose rock mass.
首先,建立了主溜井三维有限元计算模型,模拟了主溜井围岩的塌落破坏过程和加固后的加固体的稳定性及变形特性;同时,还采用多点位移计等对加固体的稳定性进行了实地监测。计算结果表明:网棚锚注加固体的纵剖面上的压力和位移规律是①加固体下部局部出现拉应力区,表明锚杆的使用是合理的;②加固体内的应力由塌落中心向周围围岩过渡,应力越来越大,最终将荷载传至围岩中;③从下到上下沉逐渐减小;④从加固体中心到周围下沉位移逐渐减小,且近似一条抛物线。
-
According to the change regularity of deformation modulus, combining with the rock mass structure characteristic of region studied, using interpolation method, the deformation modulus of rock mass in 36# adit can be deduced. The average vertical deformation modulus of rock mass during 0-70 zone is 39Gpa, and the horizontal deformation modulus of rock mass is 51. 3GPa in nature stress state and 50.8GPa in engineering load state. The average vertical deformation modulus of rock mass during 70-140 zone is 32. 2Gpa, and the horizontal deformation modulus of rock mass is 41GPa in nature stress state and 42. 6GPa in engineering load state. It will be a good reference of engineering design and evaluation.
9根据节理岩体变形模量变化规律,结合研究区岩体的结构特点,采用插值的方法对36号平硐岩体进行变形模量的推测,得到0-70段岩体的平均铅直向的变形模量为39GPa,水平向的变形模量:天然应力状态下为51.3GPa,工程荷载作用下为50.8GPa;70-140段岩体的平均铅直向的变形模量为32.2GPa,平向的变形模量:天然应力状态下为41GPa,工程荷载作用下为42.6GPa,这为工程设计、评程设计、评价等提供了必要的参考。
-
The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme
主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。
-
The comparative investigation of the characteristics of deformation and AE were conducted and the results are presented as followed: 1. The characteristics of rock AE are correlated to the strength, joints, cracks, and the size and hardness of crystalline grain. 2. The sequence of AE can be divided into four phases: beginning phase, tempestuousness phase, drop phase and dreariness phase. The loss and the duration of the phases are correlated to the rock character and flaws in the rock. 3. The AE rate characteristics are not almost concordant with the AE energy rate. 4. Besides the homogeneity, the strength of rock contributes the activity of AE. The higher the strength is, the lower the activity is. 5. There is a dreariness phase before the failure of most kinds of rock. 6. Whether the precursor is obvious is correlated to rock the character, and the precursor of AE rate is more apparent than the precursor of AE energy rate comparatively.
通过对比研究这六种不同岩石的变形和声发射特征发现,岩石声发射受到岩石强度、节理裂隙和晶粒软硬大小等的影响;岩石声发射过程存在初始区、剧烈区、下降区和沉寂区,各个阶段是否存在及持续时间与岩石强度、内部缺陷等有关;岩石的声发射事件率特征与能量率特征并不完全一致;岩石的声发射活性除了受其均匀性影响外,还受到岩石的强度影响,强度越小,声发射活性越强;大多数岩石破坏前存在一声发射沉寂区;岩石的破坏前兆是否明显跟岩性有关,相比较而言,岩石破坏时的声发射率前兆比声发射能量率前兆更为明显一些。
-
The study provided 2 kinds of finish systems which were pouring and anchoring rock-wool panel respectively. In general, galvanizing steel-meshwork using machine anchor can use all kinds of Rock-wool panel made in China. The interface mortar used in Rock-wool can prevent worker's hand from hurting and improve the water-proof capability and bonding intensity of rock-wool panel. The low-heat conductivity of polystyrene foaming granule paste improved the integer and anti-crack of system. The 2 kinds of rock-wool system all can resolve the current rock-wool panel applied difficulty in outer-wall external thermal insulation.
研究提出了现浇和锚固岩棉板2种涂料饰面构造做法,其中采用机械锚固热镀锌钢网施工可充分利用国产各类型岩棉板;岩棉板的界面砂浆处理可起到防止岩棉纤维扎手、增强岩棉板的防水性能和提高岩棉板与找平层的粘结强度的作用;聚苯颗粒的低导热系数过渡层提高了系统的整体性和抗裂性。2种构造做法经试验和工程试点证明均可解决目前国内岩棉难以应用在外墙外保温系统中的技术问题,具有优异防火性能的岩棉外保温系统可应用于任何类型的建筑中,在高层建筑和防火要求高的建筑中其优势更为明显。
-
The selection of geological prospecting in different stages(initial-prospecting, detailed-prospecting)(2)the selection of geological prospecting in the deep-laid and shallow-laid of tunnel project (3)the selection of geological prospecting of tunnel projecting in different geological conditions Finally, the author summed up main problems needing to be solved in tunnel engineering geological prospecting as follow:(1)differentiate stratum and find out the depth and thickness of different stratums in the tunnel section (2)find out geological structure and existence situation of fault, broken zone and weak plane (3)find out weathering level of bed rock to classify surrounding rock combining speed materials (4)differentiate stratum structure of the entrance of tunnel to judge the stability of it (5)find out existence situation and performance of ground water (6)situations of other harmful geological phenomenon In view of above problems and classification of surrounding rock, the author showed principles of rational choosing of methods in geological prospecting and counted disperse range of physical character parameter value in different petrosal character, getting achievements as follow:(1)summarization of effect, merits and demerits of different geological prospecting methods in the tunnel geological investigation (2)method selection and arrangement principle of tunnel engineering geological prospecting in different geological conditions and prospecting stages (3)According to previous experience and cases, the author concluded the物性parameters most in use ,and showed the basis of selecting geological prospecting methods in different geological conditions.
论文中用几个应用实例来说明:(1)不同勘察阶段物探工作的选用;(2)深埋、浅埋隧道工程物探工作的选用;(3)不同地质条件隧道工程物探工作的选用。最后总结归纳出隧道工程物探所需要解决的问题主要有:(1)划分地层,查明隧道通过剖面的各地层深度与厚度。(2)查明地质构造,隧道轴线段有无断层、破碎带、软弱层面等。(3)查明基岩风化程度,从而结合速度资料进行围岩分级。(4)划分洞口地层结构,判断洞口稳定性。(5)查明地下水赋存情况及其活动动态。(6)其他不良地质现象存在情况。针对上述需要查明的地质问题与计算围岩分级情况,论文提出合理选用物探方法的原则,并统计了物性参数值在不同岩性中的分布范围。得出以下研究成果:(1)总结出各物探方法在隧道地质调查中的作用和优缺点。(2)得出不同地质条件下和不同勘察阶段,隧道工程物探方法选择和布置的原则。(3)根据以往工作经验和事例,对常用的物性参数进行了归纳总结,同时介绍了不同地质条件下物探方法选择的依据。
-
The result shows that the main reasons of deformation failures in deep roadways are 1 highly relying on the piling up of several support styles, and 2 ignoring the coupling between support and surrounding rock or the couplings among different supports. This is because massive deformation energy is accumulated in surrounding rock, which is induced by high stress and soft rock dilatability.
结果表明,在深部高地应力及软岩膨胀性作用力的影响下,巷道围岩内部积聚了大量的变形能量,单纯依靠多种支护形式的叠加,而不注重支护体与围岩之间以及支护体之间的耦合是巷道失稳的主要原因。
- 相关中文对照歌词
- Rock N' Roll
- I Wanna Rock (Interstate Trafficking Remix)
- Robot Rock
- Rock Wit It
- Just Like Me
- I Rock, Therefore I Am
- I Wanna Rock
- Rock The Shocker
- The Walls
- Planet Rock 2K (Down South Mix)
- 推荐网络例句
-
The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.
组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。
-
We have battled against the odds in a province that has become increasingly violent.
我们对在一个争夺日益激烈省的可能性。
-
MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.
米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。