查询词典 surface coating
- 与 surface coating 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
At substrate temperature 20℃, the maximum recoat interval between layers can be prolonged to 4 days on condition that the surface has not been exposed to sunlight, water/ice or other contaminant before over coating.
重涂前,施工表面未接触日光、水/冰或其它污物的情况下,底材温度20℃时,两层间的最大重涂间隔可延长一倍。
-
Machining process and general information:· General Information – Tooling o Plan to have own engineering group as company expands o Hwasung is subcontracted to do engineering currently o Uses same cutting tools as in Korea facility – all diamond o Regrind tools if can o Hwasung has capability to surface grind, repair dies, and make molds with wire EDM process · General Information – Machining o Boundary samples are used: okay, borderline, not good o Quality room has separate windows for incoming and outgoing parts o New equipment will be coming in from FM LaGrange plant o Each operation has pictures and job instructions for what to check and which gage to use to check part o Parts are manually loaded into machine or pallet, depending on line o Auditor checks parts for verification: after operator checks part, puts in bin, auditor checks part and reloads back on line o Have tool management system o A pokeyoke check is used for orientation prior to loading o Machines are guarded o Mostly have CNC machines o Manual chip collection systems o If automated, have robots with grippers to load/unload parts from pallets o After final inspection, operator visually inspects and loads onto plastic dunnage with the crown up and loads into the washer o Repairs: filing down of burrs or sharp edges after anodizing the crown o Have 2 Excello machines for special machining of the pin bores o 2.7% scrap for gasoline pistons o Cycle time is 18 seconds for gasoline piston o Process – Wash o Spray system o 4 stations: heated wash, wash with degreaser, 2 rinse stations o Uses RO water o Operator blow dries piston and puts on dunnage with crown up o Parts wheeled into coating room o Needs major improvements here o Chemical analysis done for bath in chemical room o Comments/Observations: o Relatively small piston facility, but plans for additional space.
加工工艺和一般信息:·–的一般信息工具 o 有自己的工程集团,随着公司的扩展计划 o Hwasung 是分包做当前工程 o 用途相同的扦插工具,如在韩国设施–所有钻石 o 回收料工具如果可以 o Hwasung 已表面研磨,修复模具,和模具丝电火花加工能力过程·一般信息–加工 o 界限示例用于:好交界,不好 o 质量房间有单独的窗口传入和传出的部件 o 新设备会在来从调频拉格朗日植物 o Each 操作具有图片和工作说明的什么复选,计为使用检查部分 o 部件是手动加载到机器或托盘,取决于行 o 审计检查验证零件:置于 bin,运算符检查部分后,核数师检查部分并重新加载回行上 o 有工具管理系统 o 为 pokeyoke 复选用于在加载之前的定位 o 机被保护 o Mostly 有数控机床 o 手动芯片收集系统 o 自动,如果有与要加载/卸载部分从托盘 grippers 机器人 o 后最终检验,运算符将直观地检查并加载到与塑料衬垫冠了与到洗衣机负荷 o 修复:提交下毛刺或锋利的阳极氧化冠后 o 有 2 Excello 机特别加工的销孔 o 2.7%废料的汽油活塞 o 周期时间是为汽油活塞式 18 秒 o 过程–洗 o 喷射系统 o 4 站:加热洗、与脱脂剂洗、 2 冲洗站 o 使用反渗透水 o 运算符吹干活塞式并将了放冠衬垫 o 部件轮式进涂层房间 o 需要重大改善在这里 o 为在化学的房间里浴做的化学分析 o 注释/结论: o 相对小活塞式设施,但额外的空间的计划。
-
Prior to coating, check whether steel surface treatment meet de-rusting requirements, if rust or dirty found, it should receive rehandle. De-rusted steel should be coated with prime within 12 hours after de-rusting.
在涂装前,先检查钢材表面处理是否达到防锈等级的要求,是否仍有返锈或重新污染的现象,否则应重新处理,同时除锈后要求在12小时以内即喷底漆。
-
As relying on the universities and lnstitues in Xi'AN, TTI has the rich qualified scientists and technicians, advanced technilogy and equipments, complete quality assurence systems, and the products have been sold to European, America, East Asia, Hong kong, Taiwan, delta of Yangtsse and zhujiang River widely used for electron, plating, petrol-chemical and chemical industry, energy source projects, coking, papermaking, saltmaking, ocean projects, wet metallurgy, surface treatment, pharmacy and medical treatment, electrodemaking, coating film etc., which produced a lot of economic and social benefit.
特钢钛业'依托西安著名高校和科研院所,拥有雄厚的科研技术力量,先进成熟的生产工艺及装备,完善的质量保证体系,公司产品已在欧美、东亚、港台、中国大陆长江三角洲和珠江三角洲电子线路板、电镀、石油化工、化学工业、能源工程、焦化、造纸、制盐、海洋工程、湿法冶金、表面处理、医药医疗、电极制造、镀膜等行业得到了广泛应用,创造了良好的社会经济效益。
-
The effect of TiC coating in electrode tip surface on spheriform electrode degradation during resistance spot welding zinc coated steel was investigated by SEM,EDX and XRD.
利用SEM、EDX和XRD等方法分析了在点焊镀锌钢板时球形电极表面熔敷TiC涂层对电极失效的影响。
-
The surface morphology was observed by means of SEM. The EDX results show that the coating's sulphur content increase and cobalt content decrease with the sulphourea concentration increasing. A gradient structure with solphur content increase from inside to outside was formed.
用SEM观察镀层表面形貌,面能谱测试镀层的结果表明,随着镀液中硫脲浓度的升高,镀层中S元素的含量逐渐提高,钴元素的含量逐渐降低,镀层由内到外形成了S元素含量不断增加的梯度结构。
-
The paint may be used in the outer surface of oil tank and roof to form sunproof coating.
可用于石油化工储罐外表面及屋顶的防日晒涂层。
-
The factors of temperature and humidity influenced on film thickness and order of layer were studied, in which pulling speed and pulling times were also included. It showed that the thickness of single dip-coating film reached 0.23 μm ~ 0.625 μm, and the degree of order of surface layer were still holding much higher.b Adopting calcined or uncalcined mesoporous silica membrane as matrix, nano zirconia particles were assembled through ion exchange method and ion-template exchange method.
结果表明,单次提拉膜膜厚0.23μm~0.625μm、8次提拉后表层膜仍有一定的有序性; b以自制的介孔氧化硅煅烧/未煅烧厚膜样为基体,采用离子交换法/离子模板交换法组装锆氧纳米粒子,选用DSC-TG、FT-IR、Uv-vis、SAXRD等对不同组装方法、锆源浓度、pH值等组装条件下ZrO_2/介孔氧化硅厚膜组装效果进行评价。
-
Firstly, a composite antifouling composition is prepared by taking super-fine tourmalin powder and nano zinc oxide powder as materials and coating a layer of silicon dioxide on the surface of the super-fine tourmalin powder and nano zinc oxide powder, and the nontoxic conductive marine antifouling paint is prepared by dispersing composite antifouling composition, film-forming matter, conductive powder and addition agent.
以超细电气石粉末与纳米氧化锌粉末为原料,在其表面包覆一层二氧化硅,制得复合防污剂。然后以复合防污剂、成膜物质、导电粉末、助剂经过分散制成无毒海洋防污涂料。
-
We hereby ensure the durability of the surface finishing of E-coating, at least no discolouration or ffading within 12 months!
人生就是一段旅程,在乎的不是目的地,在乎的是沿途的风景以及看风景的心情!
- 推荐网络例句
-
I didn't watch TV last night, because it .
昨晚我没有看电视,因为电视机坏了。
-
Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.
今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。
-
I'm running my simile to an extreme.
我比喻得过头了。