英语人>网络例句>support abutment 相关的网络例句
support abutment相关的网络例句

查询词典 support abutment

与 support abutment 相关的网络例句 [注:此内容来源于网络,仅供参考]

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Through the comparative analysis of the earth pressure calculated by the different calculation methods, it is known that when the earth pressure behind the abutment of the integral abutment bridge under the action of rising temperatures is calculated, it is not proper to use the m method to calculate the resistance coefficients of the abutment back wall and column earth while the resistance coefficient of the abutment back wall earth can be calculated by the Broms method. It is proper that the resistance coefficients of the earth of the abutment and pier piles should be considered by the p-y curve.

通过对不同方法计算的台后土压力的对比分析,得知:在计算升温引起的整体式桥台桥梁台后土压力时,桥台背墙及台柱土的水平抗力系数计算采用m法是不适合的;桥台背墙后填土的水平抗力系数可采用Broms法计算;土对台桩及墩桩侧的水平抗力系数按p-y曲线来考虑是适合的。

The stress and stability analysis of arch dam and abutment are the main task of traditional arch dam design. Nowadays there are two kinds of analysis method to use. One method is the arch-cantilever load-distribution method, in which the arch dam stress and abutment thrust are calculated, while the stability of abutment is evaluated by rigid body method or other method. The other is FEM method, which evaluates the arch dam stress and stability of abutment at the same time.

作为拱坝常规设计的主要任务—坝身和坝肩的应力和稳定分析,当今大体有两套体系可用:①用拱梁分载法分析坝身应力和坝肩推力,结合刚体法或其他方法进行坝肩稳定审核;②用有限元法对坝身应力和坝肩稳定同时进行审核。

Analyse the distributive law of shear-lag effect and influence of each structural parameter: pile length , bending stiffness of pile, bending stiffness of abutment, abutment length, different type of soil behind abutment, curve radius, width to span ratio,width of beam, etc. And the main influencing parameters were picked up.

进行结构参数分析,研究等代桩长、桩的纵向抗弯刚度、桥台纵向抗弯刚度、桥台高度、台后土压力、曲率半径、宽跨比及箱梁肋板间距等对剪滞系数的影响,从而得到影响无伸缩缝曲线箱梁桥剪力滞效应的主要参数和次要参数。

Said torsion spring is increasingly stressed torsionally as the wind acting on said propeller blades increases in velocity and, as the torsional stress on said spring reaches a certain magnitude, said spring moves at least partially away from said first abutment member and, with increasing torsional stress on said spring, through the intervening angle between said abutment members and into engagement with said second abutment member.

说扭簧是越来越强调扭矩为风署理就表示,螺旋桨桨叶的增加速度,由于扭应力就表示,春季达到一定的规模,说春天的举动,至少部分远离说,第一台的成员,随扭应力对说,春天,通过干预之间的角度说,坝肩成员和到接触说,第二台的成员。

Said abutment means comprises an abutment member fixed to said tubular member and in engagement with said spring to torsionally prestress the portion of said spring between said abutment member and the end of the spring fixed to the end of said tubular member.

说坝肩手段,包括一台固定的会员表示,肾小管会员和在接触说,春天扭矩预应力部分说,春季之间说,坝肩会员和年底春季固定到去年底表示,肾小管会员。

A finite element iteration method of safety factor against sliding of the abutment is presented to study the stability of Shuanghe arch dam abutment ,and the safety factor against sliding of the abutment is obtained.

采用坝肩抗滑稳定安全系数的有限元迭代法,通过三维有限元计算,研究了双河拱坝坝肩岩体的稳定性,得到坝肩岩体的抗剪安全系数,在此基础上,进一步分析加固后的坝肩稳定性。

The Broms method, m method and p-y curve method are respectively used to calculate the horizontal resistance coefficient of the filled earth behind the abutment back wall, the m method and p-y curve method are used to calculate the resistance coefficients of the earth around the abutment column and at the sides of the abutment and pier piles. The TDV software is used to simulate the restraint of the earth to the piles ends.

分别采用Broms法、m法及p-y曲线法计算桥台背墙后填土的水平抗力系数;采用m法及p-y曲线法计算台柱土的水平抗力系数和台桩、墩桩侧土的水平抗力系数;采用TDV软件模拟土对桩端的约束作用。

PRC support commonly used file format such as HTML, Palm effective in the PDB format support BMP, ICO, GIF, JPG, PCX, TGA, CHM文件 encountered have other graphics format support PDF file format supports ZIP compressed format support document not codecs which can be read directly on the content of encrypted ZIP support document Default passwords can be erected show its support for the arbitrary change font size, type, color, arbitrarily change the background color waterline support multiple types of support, the screen was set up to support fringe character spacing.

中华人民共和国支持常用的,如HTML,Palm公司在PDB格式支持BMP,保险公司,的GIF,JPG,PCX,热重分析的有效文件格式,CHM文件遇到有其他图形格式PDF文件格式支持支持ZIP压缩格式的支持文件,可以不编解码器予以对加密文件的ZIP支持直接预设的密码内容可以设置显示其对任意更改字体大小,类型,颜色,任意更改背景颜色水线支持支持多种类型的支持,屏幕成立了支持边缘字符间距。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Child Support
Life Support
Zydrate Anatomy
Zydrate Anatomy
Life Support
I Endorse These Strippers
Flower
Deport Them
5 x 5
Nah Gwan A Jamaica
推荐网络例句

The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.

组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。

We have battled against the odds in a province that has become increasingly violent.

我们对在一个争夺日益激烈省的可能性。

MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.

米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。