英语人>网络例句>substructure 相关的网络例句
substructure相关的网络例句

查询词典 substructure

与 substructure 相关的网络例句 [注:此内容来源于网络,仅供参考]

The key problem of uplift piles in deep buried substructure compared to underground engineering with shallow bury depth is how to reflect the influence of deep excavation off-loading on the uplift piles' bearing characteristic and capacity....

与浅埋的地下工程相比,该深埋地下结构抗拔桩设计面临的特殊问题是如何反映如此大体量深层地下开挖卸荷对抗拔桩承载特性的影响,主要表现在:深埋地下结构抗拔桩地面试桩开挖段侧摩阻力的扣除;开挖卸荷后桩周土体围压减小对桩基承载力削弱的影响;开挖卸荷基底隆起对桩产生的预拉力。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

MOTC Directorate General of Highways, Xie Zhexiong:"We deepen the foundations, so no matter how low the riverbed gets, we're still underneath it. Then we make the pillars thinner, so they're less susceptible to fierce currents. The advantage of substructure replacement is it's cheap, and lasts forever. Finally, during construction the bridge can stay open."Alternative to thick bridge piers?

公路局第二区养护工程处课长谢哲雄:「我们把基础加深,深了以后河床再怎麼降低,还是在河床下面,然后我们的墩柱再稍微减细,减细以后它受的攻击坡会比较少,换底工法的好处就是节省经费,也就是永久的,最后在施工的时候,桥上的车子照样通行。

Zhong Hang machinery Co., Ltd is rare in the field of oil machinery which support Complete equipment sets in Xindu,sichuan,china. The production of company include Oil equipment,such as:drawworks,must,mud pump,hook,substructure,Crown block .Meanwhile,According to the requirements of different customers, we also can process the various non-standard products.

中杭机械有限公司是新都少有的石油机械配套产品生产厂家,公司生产石油设备井架,泥浆泵,大钩,底座,天车,绞车等产品,还可根据客户不同要求承接、加工各类非标产品。

The wide arpeggios in the left hand, maintained in a continuous stream of tone by the strict legato and fine and constant use of the damper pedal, formed a harmonious substructure for a wonderfully poetic cantabile.

左手广泛的琶音,通过连奏以及巧妙地连续使用延音踏板,保持着连续的一连串的音调,为诗歌般的轻柔流畅形成了和谐的基础。

The tong counter-weight must not rest on derrick sub floor, derrick substructure sills or other obstruction. The counter-weights must be shielded to prevent crew members from accidental contact with the lines or weights.

大钳悬重一定不要压在井架小平台上、底座基础上或其他的妨碍物上,配重一定要有防护,防止人员意外接触吊绳和配重。

Concludes:Three subsets of mast cell in human tissue are sorted and depurated with antibodies of specific enzyme and immunofluorescence labelling and flow cytometry. Mast cell of containing profuse secretary vacuoles could be displayed by confocal microscopy. It demonstrate that mast cell have material substructure offering for fast reaction of I type allergies of human being.

利用肥大细胞的特征性酶抗体、免疫荧光标记和流式细胞仪可将人组织中的肥大细胞分选纯化为三种亚型;以共聚焦显微镜显示肥大细胞含有丰富的分泌颗粒,它说明肥大细胞具备了为人体I型变态反应提供快速反应的物质基础。

The substructure uses the distyle bridge pier, the pillar foundation is a pile foundation.

下部结构采用双柱式桥墩,墩基础为桩基础。

The type of structure can achieve light-duty of girders, thus reduces the engineering work of its substructure.

这种结构能够实现主梁的轻型化,进而减轻下部结构的工程量。

第8/9页 首页 < 1 2 3 4 5 6 7 8 9 > 尾页
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。