查询词典 structural connection
- 与 structural connection 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
For accuracy and computation cost, the nonlinear finite element structural dynamics model of the naval gun is created with different elements such as solid elements, shell elements and the nonlinear components are considered, especially the large displacement slide and the nonlinear spring connection between gun tube and cradle rail.
在建立有限元模型时,考虑了火炮各部件间复杂连接,尤其是身管与摇架间的大位移滑动接触的非线性问题。
-
A good many mico-landblock of the early Neoproterozoic-Cambrian volcanic rock that distribute in the Tianshan orogenic belt and on its both sides, and the Carboniferous-Permian volcanic rocks that widely distribute in the Tianshan and adjacent regions are selected for subject investigating in this paper. Renewing the ocean-land format and ocean-land conversion process of Tianshan orogenic belt in the Paleozoic is the masterstroke for this paper. On the basis of detailed field investigation, many subjects, such asregional lithology、geochemistry、structural geology、volcanic sedimentology geology、sotope geochronology and synthesis analysis study of geophysics data, are adopted as instrumentality in the paper, this study lays emphasis on the formation, evolution and dynamics of early Neoproterozoic-Cambrian and Carboniferous-Permian volcanic rock in the Tianshan and its adjacent regions to find out Carboniferous-Permian volcanic rock property, eruptive sequence, time and space distribution characteristics, to resume and reconstruct evolution process of Carboniferous-Permian volcanic rock, and to explore connection of magmatism process and lithosphere stretching action of neopaleozoic ocean-land transformation in the Tianshan region.
本文选择分布于天山及其两侧的诸多微陆块上新元古代—早寒武世火山岩和天山地区广泛发育的石炭纪—早二叠世火山岩为研究对象,以恢复重建天山造山带古生代洋陆格局和洋陆转换过程为主线,在详细的野外工作基础上,综合运用区域岩石学、地球化学、构造地质学、火山沉积学、同位素地质年代学、区域地球物理资料综合分析研究等多学科手段,重点研究天山及其邻区新元代—早寒武世和石炭—二迭纪火山岩系的形成演化及其动力学,查明天山石炭纪火山岩系的性质、喷发序列、时空分布特点,恢复重建其形成演化过程,探索天山地区晚古生代洋陆转换过程中火山岩浆作用与岩石圈拉伸作用的关系。
-
Based on the result of the simulation, structural optimization of the connection rod was carded out, too.
在分析的基础上,提出了设计振动冲击务时应建循的原则和优化方法。
-
The structural configuration of traveling carriage is demonstrated. The connection problem of anchor joint between space cable and traveling carriage is solved by arc-shaped beam and former anchoring beam.
论证了红枫湖大桥挂篮的结构形式,并通过采用弧形梁、前锚梁解决了空间斜索面斜拉索与挂篮连接的问题。
-
In the structural design Unique scroll crushing chamber and P, S, T three broken, rotor system adopts the key sets of cone connection, efficient hammer wear-resistant plate, insert the installation form, tilt housings, the unique profile counterattack liner, multi-rack Position open the door, screw or hydraulic device to open the replacement of wearing parts, maintenance more convenient.
在结构上设计有独特涡旋破碎腔和P、S、T三段破碎区,转子体系采用无键锥套联接,高效耐磨板锤,插入安装形式,倾斜轴承座,独特的齿形反击衬板,机架多方位开门,丝杠或液压开启装置使更换易损件、检修更加方便。
-
As a structure formed by even arrangement and connection of standard materials with smaller cross section,wooden frame structure is characterized by that the house frame is assembled with standard-sized timber,while standard-sized structural plywood and flakeboard are used for its floor,wall and roof.
框架式木结构体系[1,2,3]是由构件断面较小的规格材均匀密布连接组成的一种结构形式,它由主要结构构件和次要结构构件共同作用,来承受各种荷载,最后将荷载传递到基础上。
-
The presentation introduces conditions, features and difficulties in the recovery project of Shanghai Metro Line 4, by stating cons and pros of overall proposal of recovery design, the safeness of support and bracing structure for hyper deep foundation, influence of mid-river cofferdam on existing sound tunnel and hyper deep foundation, structural design selection for connection section of the mined tunnel, water-proofing option for hyper deep foundation in confined aquifer soil.
报告介绍了上海地铁4号线修复工程建设条件、特点和难点,陈述了对修复设计总体方案取舍、超深基坑支护结构安全度、江中围堰对完好隧道及超深基坑的影响、暗挖连接段的结构设计方案选择、处于承压含水层中的超深基坑的结构防水等内容。
-
Outline of the Presentation The presentation introduces conditions, features and difficulties in the recovery project of Shanghai Metro Line 4, by stating cons and pros of overall proposal of recovery design, the safeness of support and bracing structure for hyper deep foundation, influence of mid-river cofferdam on existing sound tunnel and hyper deep foundation, structural design selection for connection section of the mined tunnel, water-proofing option for hyper deep foundation in confined aquifer soil.
报告内容介绍报告介绍了上海地铁4号线修复工程建设条件、特点和难点,陈述了对修复设计总体方案取舍、超深基坑支护结构安全度、江中围堰对完好隧道及超深基坑的影响、暗挖连接段的结构设计方案选择、处于承压含水层中的超深基坑的结构防水等内容。
-
Therefore, the reasonable evaluation of deformation of the structures becomes a significant issue that the bridge seismic design should confront, In this paper, in connection with the author's design experiences in this regard, the current calculation methods for structural ductility ratio of railway viaducts in Japan are described with an aim to providing reference to the seismic design of similar bridges.
根据作者过去在这一方面的设计经历,介绍了日本现行铁路高架桥设计采用的构件延性率计算方法,以供桥梁抗震设计参考。
-
This paper presented the relationships between roof shapes and form coefficient under wind loads, drainage and corresponding loads caused by rain. The paper also discussed the relationship between roof shape and roof structural height and span and the relationship between roof shape and connection styles. These relationships will influence both safety and price of roof structure.
阐述了屋面形状与风载体型系数、屋面排水及相应雨水荷载的关系问题,讨论了屋面结构形式与屋面跨度和厚度的关系问题、屋面形状与钢结构节点形式的关系问题,这些问题对大型场馆钢结构屋面的安全性、经济性均有显著影响。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。