查询词典 steel plate girder
- 与 steel plate girder 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Structure form adopts converse triangle beam double-hole connection welded by general electric trolley wall plate and steel plate, connection shaft, triangle beam bottom is connected with girder by nut and thrust bearing, triangle beam could rotate 360 degrees horizontally, thus realize whole set electric trolley horizontal rotation, largely reduce curve track curvature radius of electric hoist traveling mechanism.
描述: 结构形式采取通用电动小车墙板与一个钢板和连接轴组焊的倒三角形吊梁双孔连接,三角吊梁下面通过螺母及推力轴承与一个横梁连接,三角吊梁相对横梁可在水平方向做360度旋转,从而实现电动小车的整体水平方向转动,大大减小了电动葫芦运行机构弧形轨道曲率半径。
-
The main technical systems that SBS has are: door style rigid frame house system, steel frame-core tube residence system, steel frame-steel plate with slots system, rectangle steel pipe-H section steel girder system, interveined joist frame system, wide-spanned board system, steel frame-steel underprop system, surrounding system, separated structure system, suspension system for balcony and plank of air-conditioners, LM board as shear wall system for low buildings, and strong girder-weal column structure system for low buildings.
赛博思拥有的技术体系主要有:门式刚架房屋体系、钢框架-核心筒住宅体系、钢框架-开缝钢板剪力墙体系、方矩管-H型钢梁体系、交错式桁架体系、大跨度楼板体系、钢框架钢支撑体系、围护体系、隔断结构体系、两侧阳台、空调机支架独立悬挂系统、低层住宅LM板兼作剪力墙体系以及低层住宅强梁弱柱结构体系等。
-
The 1∶3 scaled-down model test is carried out for the ear plate type cable and girder anchor structure of the steel box girder of Hangzhou Bay Sea-Crossing Bridge,and further,through the model test and simulation analysis,the type of the anchor structure of steel box girder of long span cable-stayed bridge is studied from aspect of stress distribution,force transformation path,safety and workability of the structure.
对杭州湾跨海大桥钢箱梁耳板式索梁锚固结构进行了1∶3缩尺模型试验,并通过模型试验和仿真分析相结合,研究大跨度钢箱梁斜拉桥中耳板式索梁锚固结构的应力分布、传力途径、安全性能和使用性能。
-
In the paper,the equations of motion for the vehicle_bridge_MTMD system are presented and the effectiveness of suppressing the transverse vibration of the deck steel plate girder bridge with multiple tuned mass dampers is investigated by the field test and simulated calculation.
本文建立了车-桥-MTMD系统振动方程,对利用多重调频质量阻尼器抑制铁路上承钢板梁桥横向振动的效果进行了模拟计算和现场试验。
-
With the theory of energy random analysis of train derailment, the security of moving train on up line and down line of Laoluanhe bridges is analyzed contrastively, and the influence on improving resisting derailment ability of bridges by widening the distance between two main beams of the deck steel plate girder bridge is studied.
进一步运用列车脱轨能量随机分析理论,对比分析了老滦河桥上、下行线上的列车走行安全性,分析了增大钢板梁主梁中心距对提高桥梁抗脱轨能力的影响。
-
Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge,conclusions are made as follows:with static reinforcing,the vibration amplitude can be suppressed to some extent,but quasi-resonance of the bridge can not be avoided,moreover,the construction is inconvenient and costly.
通过对目前抑制铁路上承式钢板梁桥横向振动的几种方案进行定性的分析和比较,认为:静力加固方案可以使桥梁振幅有所减小,但不能避免准共振现象的发生,而且工程造价较高,施工也不方便;两桥连接方案减振效果明显(减振率近50%),比较经济也比较方便,但同样不能避免准共振现象的发生;动力减振方案可以有效的抑制桥梁的准共振现象(现场试验中减振率达51.83%),而且工程造价较低,施工简单、方便。
-
Due to their simplicity in fabrication and excellent strength to weight ratio, stiffened steel plate are also widely used for construction of land-based structures such as box girder and plate girder bridges.
由于制作简单且有良好的强度重量比,加筋板也广泛应用于制造陆基结构物如箱梁和板梁桥等。
-
Due to severe deficiency of vertical and lateral stiffness in most railway steel plate girder bridges after train speeds being raised,the bridge structures of existing railways must be strengthened in order to guarantee the safety of railway transportation.In addition,assessment of strengthening effect has become one of the most important topics in the study of railway steel plate girder bridges.
由于大部分铁路钢板梁桥在列车提速后竖向刚度和横向刚度都存在严重的不足,为保证铁路运输安全必须对其进行加固,而对其加固效果进行准确评估已成为铁路钢板梁桥研究的重要课题之一。
-
Structure form adopts converse triangle beam double-hole connection welded by general electric trolley wall plate and steel plate, connection shaft, triangle beam bottom is connected with girder by nut and thrust bearing, triangle beam could rotate 360 degrees horizontally, thus realize whole set electric trolley horizontal rotation, largely reduce curve track curvature radius of electric hoist traveling mechanism.
结构形式采取通用电动小车墙板与一个钢板和连接轴组焊的倒三角形吊梁双孔连接,三角吊梁下面通过螺母及推力轴承与一个横梁连接,三角吊梁相对横梁可在水平方向做360度旋转,从而实现电动小车的整体水平方向转动,大大减小了电动葫芦运行机构弧形轨道曲率半径。
-
The ZTP II series rubber support is suitable for T girder. it uses the column kneading board and the roof coordination, to make it only carry on longitudinally automatic stepless moved slope, which may avoid the question of the girder list effectively, moreover, ZTP series rubber support because its can adapt the random orientation slope, the bottom of the girder the embedded steel plate does not allow to design the wedge shaped block, therefore specially
ZTPⅡ系列橡胶支座更适用于T型梁,它采用柱面板和顶板的配合,使其只能进行纵向的自动无级调坡,可以有效地避免架梁时的侧倾问题,另外,ZTP系列橡胶支座由于其能适应任意方向的坡度,梁底预埋钢板不许设计楔形块,因此特别适宜于在顶推连续梁上采用。
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。