英语人>网络例句>steel girder 相关的网络例句
steel girder相关的网络例句

查询词典 steel girder

与 steel girder 相关的网络例句 [注:此内容来源于网络,仅供参考]

The deck is an orthotropic steel box girder of aerofoil shape with cantilevered cycle tracks and footway supported from the box.

我的翻译:桥面是桥路面合一支架结构的翼型钢箱梁,其中钢箱支持着突梁上的自行车道和人行道。

According to the three-dimensional finite element analysis, the graph of axis force on steel, the graph of Z displacement on steel and the graph of whole transmogrification on girder are drawn.

通过模型分析计算得出的结果,得到钢筋轴力的分布图,相应的钢筋Z向位移曲线和梁的整体变形图,钢筋应力及混凝土平均应力曲线图,最后根据分析结果推导出钢筋应力与荷载的关系公式。

In this paper,a new steel-concrete composite spine girder with large cantilevered beams of corrugated steel web is introduced.

介绍了带波形钢腹板悬臂挑梁的钢—混凝土组合脊骨梁这一新型结构。

But the steel box girder is typical space thin-walled bars, because of bending-torsion coupling and steel curved box bridge distribution of stress is relatively more complicated even under dead load, so it is necessary to distribute emulation analysis to the real stress of curved box bridge.

但是钢箱梁是典型的空间薄壁杆件,由于弯一扭耦合作用,曲线钢箱梁即使在恒载作用下其应力的分布也比较复杂,因此有必要对曲线钢箱梁实际的应力分布进行仿真分析。

The methods of plane arrangement and checking of bowl-button steel scaffold were demonstrated in detail based on the engineering construction of cast-in-place Continuous beam in Houyan Cross-bridge of Shenda Highway. In addition, the methods of communicating the length of U-tray and adjusting the gradient have been given. It is pointed out that original pod can adjust the greater longitudinal or tranverse grade in the box-girder construction and welding-steel-bar can reduce partial compression.

通过后盐立交桥连续箱梁施工这一工程实例,详细论述了碗扣式钢管脚支架的平面布置方法及受力验算方法,提出了碗扣式钢管脚支架的U托旋出长度的计算方法及纵横坡的调整方法,并指出采用找零立杆的方法可以解决较大纵横坡度箱梁的施工问题;采用贴焊钢筋的方法可以解决U托偏心受压的间题。

In the construction of highway bridge and railway bridge, square box boltwelding girder steel bridge is commonly used in the construction of steel bridge.

在公路、铁路桥梁建设中,方箱式栓焊梁钢桥梁,是钢桥梁建设中常用的一种桥梁形式。

Key characteristics of 911 building demolition events: Straight Down Motion - Sudden Structural Failure - Buildings Collapsing At Free-Fall Speed - Total Collapse Of The Entire Load Bearing Cores - Many Examples of Cleanly Sliced Heavy Girder Steel Core Supports - Dust Clouds Containing Heavy Girders In Highly Energetic Horizontal Motion - Horizontal Ejections Of Heavy Girders And Pulverised Concrete Onto The Tops And Embedded Into Surrounding Buildings - Rescuers Reported And Seismic And Other Detectors Recorded Energy Dissipation Produced By Many Explosions (Recorded in real time by several different independent sources) In addition: Pools of molten Steel recorded over 1 week after collapse in the sub-basements (Refer to paper written by Physics Professor Steven Jones) Closer inspection of original video evidence shows heavy steel core columns turning to dust within seconds – question:- was a novel "StarWars type" energy directed beam weapon used in conjunction with explosives to undermine the integrity of the twin tower complex?

关键特征911房屋拆迁事件:直上下动作-突然结构上的故障-建筑物倒塌,在自由降落速度-彻底瓦解整个承载内核-很多例子,干净利落地切成沉重的大梁钢为核心的支援-尘土含重,在大梁高能水平运动-横向抛射重的大梁和青山混凝土上,车顶嵌入到周围建筑物-救难人员据报,地震和其他探测器记录耗能所产生的许多爆炸事件(记录在实时性,由几个不同的独立消息来源),此外:池钢水录得超过一周后崩溃,在分库(指书面文件,由物理教授史蒂文琼斯)加强检查,原来录像证据表明,重钢芯柱谈到粉尘数秒内-问题:-是一种新型的&为Starwars型&能源定向粒子束武器配合使用炸药完整性的前提下,在双塔复杂吗?

Due to their simplicity in fabrication and excellent strength to weight ratio, stiffened steel plate are also widely used for construction of land-based structures such as box girder and plate girder bridges.

由于制作简单且有良好的强度重量比,加筋板也广泛应用于制造陆基结构物如箱梁和板梁桥等。

This paper presents the construction techniques for lifting and installation of the steel girders for railway trestle bridge by floating crane,connection of the girder to girder in the temporary aid of pinning in the axle holes in the girders and also installation of the high accuracy bridge bearings.

介绍铁路栈桥利用浮吊吊装钢梁安装技术、梁梁连接过渡配合轴孔穿轴技术以及高精度支座安装技术。

Taking Rong hu bridge project as the background, the paper Studies on the optimization of dead load cable tension, construct system of controlling, effect of non-linear factor, limit bearing capacity of structure and spatial stress of concrete-filled steel tubular tower and the combination of girder, which are based on the hybrid cable-stayed bridge.Asking for the maximal deformation of tower and girder to be minimized and cable permissible stress as constraint conditions, the paper tries to solve the ideal dead load cable tension by combining finite element calculation and optimize analysis.

本文以蓉湖大桥工程为背景,就混合梁斜拉桥的成桥恒载索力优化、施工监控体系、过程非线性因素影响、结构极限承载力、索塔和主梁结合部的空间应力分析等问题开展研究:关于索力的优化,是以斜拉桥索塔和梁的最大变位最小为目标,以拉索容许应力为约束条件,采用有限元计算与优化分析相结合的方法来确定斜拉桥的成桥合理恒载索力。

第4/9页 首页 < 1 2 3 4 5 6 7 8 9 > 尾页
推荐网络例句

What would he tell Judith and the children?

他将怎样告诉朱迪丝和孩子们呢?

I this is at that time, the opinion with peacockish true girl is full of in a heart.

这就是当时的我,一个心中布满虚荣的女孩子真实的想法。

Oh, and I bought myself a new laptop," he said."

哦,我还给我自己买了一个新笔记本"他说。"