英语人>网络例句>spotting machine 相关的网络例句
spotting machine相关的网络例句

查询词典 spotting machine

与 spotting machine 相关的网络例句 [注:此内容来源于网络,仅供参考]

In addition, the configuration software with a Human man-Machine Interface is used to monitor the dynamical industrial process.

此外,工控组态软件作为一种标准的人机界面被用于监控工业生产的动态过程。

An e-friend is a machine that looks just like a human being .

电子朋友是一台外表酷似人类的机器。

This paper is concerned with single machine problem about due window, the objective function concludes earliness/tardiness penalties and additional penalties.

本文对交货期窗口下的单机作业问题进行了研究,目标函数不仅考虑提前/拖期惩罚,还考虑附加惩罚。

First the different due dates earliness/tardiness scheduling problem with sequence dependent setup on a single machine is considered.

连铸机是钢铁企业炼钢—连铸生产阶段的关键设备,针对连铸机上的调度问题的特点,本文在第三部分研究了加工顺序依赖于设置时间的调度问题。

We study single machine earliness/tardiness scheduling problems with a common due window, and the size of the common common due window is arbitrary.

分别提出了定理和多项式时间算法确定了这两类调度问题的最优公共交货期和最优排序。

Furthermore, the paper researches the current status of production scheduling research and present ant colony algorithm for the Earliness / Tardiness Scheduling with single machine based on the Penalty rule .This paper introduces the process of the algorithm which is realized by software.

本文重点研究企业生产调度的研究现状,并在单机环境下的提前/拖期惩罚规则的基础上,提出了蚁群优化算法解决单机环境下的提前/拖期调度,详细说明了算法的思想思路,并在软件中得到了实现。

In order to solve non-identical parallel machine earliness/tardiness scheduling problem with different due windows,a hybrid genetic algorithm based on sectional coding is suggested.

为有效地解决不同交货期窗口下的非等同并行多机提前/拖后调度问题,设计了一种分段编码的混合遗传算法。

Identical parallel machine earliness/tardiness scheduling problem with common due-date is studied.

摘要研究了带有公共交货期的并行多机提前/拖后调度问题。

This paper discusses the problem in whicn n jobs with ready times and deadlines are to be processed on a single machine. The objective is to find a sequence so as to minimize the maximum earliness.

本文讨论了带截止期限与准备时间的n个工件需在单机上加工,目标是寻找一个可行排序,使得最大提前完工时间最小。

Furthermore, to counter the uncertainty of the processing time in the practical production process, this paper builds a single machine earliness/tardiness with fuzzy processing time.

本文针对实际加工过程中作业时间的不确定性,研究了任务加工时间为模糊区间的单机提前/拖期问题,提出采用模拟退火算法对该模型进行求解,仿真结果表明,该方法具有较强的实用性。

第500/500页 首页 < ... 492 493 494 495 496 497 498 499 500
相关中文对照歌词
Machine
War Machine
Rich Bitch
Ghost In The Machine
All The Money In The World
Big Star Machine
Time Machine
Love Machine
War Machine
Machine Gun
推荐网络例句

Listen,point and check your answers.

听,指出并且检查你的答案。

Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.

但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48

Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.

一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。