英语人>网络例句>speed test 相关的网络例句
speed test相关的网络例句

查询词典 speed test

与 speed test 相关的网络例句 [注:此内容来源于网络,仅供参考]

Build a CAD valve design center and three-dimensional simulation test system design and manufacturing ensures the quality of the new product development and speed.

集团建立CAD阀门设计中心及三维立体模拟制造试验设计系统,保证了新产品开发的质量和速度。

The official footage, which has now appeared on the internet, shows an entirely new class of air-to-surface missiles, airborne launch trials of the Kh-31 high-speed anti-radiation missile and the PL-12 active radar beyond-visual-range air-to-air missile, heavy air-to-surface loads for the Chengdu J-10 and Shenyang J-11B fighters, plus extensive test and development activity with virtually every front-line combat aircraft in Chinese service.

官方电影胶片,已经在英特网上出现,展示一种完全新级别的空对地导弹,Kh-31高速、反辐射导弹和PL-12主动雷达超视距空对空导弹机载发射试验,用于成都J-10和沈阳J-11B战斗机重型空对地负载,加上广泛测试和开发工作包括实际上中国服役的每架前线战斗机在内。

The transmission ratio (cone/bit rotary speed ratio) of a mono-cone bit was tested on the bit test stand.

单牙轮钻头的牙轮转速与钻头转速之比是研究和设计钻头的重要参数。

Test of Time and Speed of Siemens Switch with graphite contactor optional

1.7 西门子石墨触头开关的时间及速度测试

The upsetting test of metal powder sintered preform by blow speed of the hydraulic press,crank press,pneumatic hammer and high energy rate forging hammer was reported.

研究了用液压机、曲柄压力机、空气锤及高速锤的打击速度对粉末冶金烧结体进行的镦粗试验。

The results show that side force, lift and overturning moment obtained by simulation and by wind tunnel test are consistent. When train travels with certain speed, the aerodynamic force and overturning moment acting on passenger car running on bridge, embankment and flat will increase greatly as cross-wind becomes larger while those increase less when the train runs on cut. Under the condition of strong cross-wind, aerodynamic force and overturning moment acting on train traveling on bridge are the largest. So the train traveling on bridge tends to overturn compared with that traveling on other three kinds of railway conditions. Aerodynamic force and moment acting on train traveling on cut are the least.

研究结果表明:侧向力、升力和倾覆力矩数值模拟结果与风洞实验结果均吻合较好;车速一定时,随着侧风速度的增大,列车在桥梁、路堤、平地上运行所受气动力和倾覆力矩均急剧增加,而在路堑上运行所受气动力及力矩增加缓慢;当侧风速度一定的情况下,客车在高桥上运行所受到的气动力及力矩最大,因此,强侧风下列车在高桥上运行较容易发生倾覆事故;在路堑上所受到的气动力相对最小。

By measuring the residual stresses of the cylinder of a cement ball mill in four cases,and the fatique crack spreading for the thermal treatment and the un thermal treatment test samples,the results showed that the heat treatment sample reduced the residual stress,enhanced the fatique strength and lowered the crack spreading speed.

对球磨机筒体的4种情况的焊件进行残余应力测试,并对进行热处理和未进行热处理的试件做疲劳试验及疲劳裂纹扩展测试。试验结果表明:经过热处理的试件,残余应力降低,疲劳强度提高,裂纹扩展速率降低,结构抗疲劳性能增强。不过从工程应用角度看,对于板厚为20~25mm的球磨机筒体而言,不进行焊后热处理也能保证足够的疲劳强度

To liberation, the two piers cracks have occurred, endangering the bridge itself, has had to limit heavy vehicles crossing the bridge, speed limits, limit the number. 1954, the local spent six months repaired the crack of the pier, in the original steel trusses on the level of amputation and a curved shape of the upper limbs, using reinforced concrete bridge deck boards, so that the bridge deck beam into a combination of vertical and horizontal beams, Increase the carrying capacity of 20 tons of cars can have full. 1981, the upper reaches of the Yellow River Bridge has withstood the test of catastrophic flood, safe and sound.

到解放时,两个桥墩已发生裂缝,危及大桥本身,不得不对过桥车辆限重、限速、限数。1954年,当地用了半年时间修好了开裂的桥墩,在原来钢桁架的水平肢上加了一根弯曲形的上肢,桥面改用钢筋混凝土板,使桥面的纵横梁变为组合梁,提高了承载能力,20吨重的汽车可以畅行无阻。1981年,大桥经受了黄河上游特大洪水的考验,安然无恙。

The independent variables in this research are two type backrests, three speed conditions, and three levels of surface. The kinematic and kinetic data are dependent variables. To test the study hypothesis, we used a two-way respeated measures analysis of variance on two factors (backrests and speeds, or backrests and slopes).

依研究目的将不同靠背组别作为主要影响因子,运动学资料与动力学资料为依变项,以重复量数双因子变异数分析(Repeated Measurement Two-way ANOVA)来验证不同靠背之间的差异性。

The calculation of the rolling time shall not account for the times required for reduced rolling speed due to material faults, operator's error, pause, repair, maintenance, test program change and the other downtimes, for which Seller is not responsible.

轧制时间的计算不包括由于材料的问题,操作人员的失误,暂停,维修,保养,测试程序的改变等浪费的时间和其他时间,卖方对此不负责。

第23/29页 首页 < ... 19 20 21 22 23 24 25 26 27 ... > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力