查询词典 span
- 与 span 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The multistage construction analysis method has been successfully used to simulate the whole erection process of a 102m-span barrel vault grid structure and a 118m-span double-layer spherical reticulated shell.
并运用多阶段施工全过程跟踪数值理论进行了两算例分析:某102m跨度大型柱面网壳结构的累积滑移施工与支架滑移施工的理论模拟,某118m跨度双层球面网壳结构悬臂施工的全过程理论分析。
-
For beams employed in any span between supports there shall be no splice in the middle one-fourth of the span nor in the one-eighth of the span nearest any support, nor closer than 1200 mm to the edge of any support/joint, as applicable.
在任何支撑点的跨距内使用的梁,在跨距中间的四分之一位置上,不得有拼接口,在靠近支撑的八分之一跨距位置上,不得有拼接口。在应用上,接口与支撑/接头边缘的距离不得小于
-
The internal forces of the main arch springers are calculated in different rise-span ratios of top and bottom arch ribs. The internal forces of arch ribs and deformations of main spans are calculated in 1/5, 1/4 rise-span ratios of top and bottom stacked arch ribs and in 1/5 rise-span ratio of dumb-bell arch ribs.
给出上、下拱肋为不同矢跨比情况下的主拱拱脚截面内力,当叠合拱桥的上、下拱肋矢跨比分别采用1/5、1/4与矢跨比为1/5的哑铃拱拱肋的内力和主梁及拱顶变形计算结果。
-
It is understood that the Yangtze River Bridge have been completed with the opening of the Yangtze River Bridge, Sanqiao different, it is the main span of Nanjing, the first 1418 meters of the twin towers three-span suspension bridge, looks like a well-known San Francisco Golden Gate Bridge, but the main span longer than the Golden Gate Bridge more than one hundred and thirty meters.
据了解,长江四桥与已建成通车的长江二桥、三桥不同,它是南京第一座主跨1418米的双塔三跨悬索桥,外观类似著名的美国旧金山的金门大桥,但主跨比金门大桥还要长130多米。
-
Aiming at calculation of the equivalent rigidity of truss stiffening girder in an aeroelastic model design of a long-span suspension bridge with truss stiffening girder,Aizhai bridge,a super-long -span suspension bridge across deep valley with single span,was taken as an example for investigation.
针对大跨度桁架加劲梁悬索桥气弹模型设计中主梁等效刚度计算问题,以矮寨大桥为实例,建立不同长度空间桁架加劲梁节段模型有限元模型,通过悬臂梁位移法反算得到主梁的等效刚度特性,研究了不同荷载施加方式以及不同梁段长度对等效刚度特性的影响。
-
The text obtains some data that caving span of immediate roof is 30m, caving span of main roof at first weighting is 42m and caving span of main roof at periodic weighting is 14m. Mining influence range is determined about 40m through numerical modeling, namely about three advance pillars were in the range of mining influence.
利用数值模拟得出煤柱采场直接顶的垮落步距为30m,老顶的初次来压步距为42m,老顶的周期来压步距为14m;通过模拟超前支承压力,确定了采动影响范围约为40m,即采场超前的三个煤柱都在影响之内。
-
In the pump body installed a stator swing span and a swing span rotation shaft, the swing roller bearing on the stator swing span connects with an end of the stator mount, the other end of the stator mount connects with the stator; on the plunger connecting rod sliding boot installed a static pressure balance chamber, the holding rings are arranged on the two sides of the plunger connecting rod sliding boot which has a fit clearance with the holding rings; the rotor rotates the stator simultaneously via the plunger piston; the needle roller bearings are arranged on the two inner circles and fit with the port axle.
在泵体内安置有定子摆架和摆架转轴,位于定子摆架上的摆架滚子轴承与定子托架的一端配合联接,定子托架的另一端与定子相连;柱塞连杆滑靴上设有静压平衡室,柱塞连杆滑靴两侧设有保持环,柱塞连杆滑靴与保持环有一定的配合间隙;转子通过柱塞带动定子同步旋转;在转子内圆两端设有滚针轴承,滚针轴承与配流轴配合。
-
With the appearance of a free span pipeline, its loading types and stress state will be changed. Especially when ocean currents pass through it, a periodical vortex shedding is often produced and induces vibration of the free span pipeline. This type of vibration contributes a lot to the fatigue failure of a free span pipeline.
管跨段的出现改变了海底管线所承受的载荷形式和应力状态,尤其是在海流作用下流经管跨时,常伴随着周期性的涡旋发放,引发管跨段的周期性振动,成为管跨段发生疲劳失效的主要因素之一。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
- 相关中文对照歌词
- Attention Span
- Attention Span
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。