查询词典 soils
- 与 soils 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The BIOLOG method was applied to exploration of functional diversity of soil microbial communities in sludge-amended soils sampled from the Yangtze River Delta.
利用BIOLOG测试方法对长江三角洲地区施污泥土壤的微生物群落功能多样性进行了初步探讨。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com
-
By simulating the movement of groundwater in soil plough layer, the pollution characters of groundwater contaminated by salinity and heavy metals in the plough layer were researched under different water tables, different pollution levels and various texture soils.
通过模拟不同水位、污染度的地下水在不同质地土壤耕层中的迁移,进行了地下水中盐分和重金属对土壤耕层污染规律的研究。
-
The simulation test s were carried out to study the variation of the vertical additional force acted on shaft lining by surrounding soils during dewatering of alluvium by means of multi-function rig in vertical shaft.
利用大型竖井模拟试验台,对冲积层疏排水过程中立井井壁受到的竖直附加力的变化规律开展了模拟试验研究。
-
The simulation tests were carried out to study the variation of the vertical additional force acted on shaft lining by surrounding soils during dewatering of alluvium by means of multi-function rig in vertical shaft.
利用大型竖井模拟试验台,对冲积层疏排水过程中立井井壁受到的竖直附加力的变化规律开展了模拟试验研究。
-
Soils that are acidified enhance the cadmium uptake by plants.
酸性的土地使植物更容易吸收土壤中的镉。
-
Introduce of actual acidification velocity(H~+ produced) for evaluating the acidifying effects of soil tested,only the stimulated acid rain with pH2.5 could lead to soil acidifying,however,acid rains with pH≥3.5 played a buffering role to soils tested,with the weakening of soil acidity.
引进土壤的实际酸化速率H产生+值衡量供试土壤的酸化,只有pH2.5的模拟酸雨淋溶促进了土壤的酸化,而pH≥3.5的模拟酸雨处理对土壤的酸化具有一定的缓冲作用,且土壤酸度减弱。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力