Pile may incline due to the excavation of tunnel or pit, incorrect driven sequence and other reasons.

桩基会由于隧道或基坑开挖、扫桩顺序不当等原因而倾斜。

Pile may incline due to the excavation of tunnel or pit, incorrect driven sequence and other reasons.

桩基会由于隧道或基坑开挖、打桩顺序不当等原因而倾斜。

Structurally speaking, the pit tunnel project is the use of works covered by the upper layer and the engineering supporting structure together constitute the load-bearing structure works.

从结构上讲,坑地道工程是利用工程上部覆盖层与工程支护结构共同组成的承载结构的工程。

And in combination with the project practice the paper approaches to the arrangement of the prospecting option and compares the common option of the foundation pit enclosure of tunnel and the anti-floating design of foundation bottom.

本文对上海地区城市下立交工程的勘察设计进行了分析总结,并结合工程实践对勘察方案的布置进行了探讨,对地道基坑围护、基底抗浮设计的常用方案进行归纳比较,为今后下立交工程的勘察设计工作提出建议和参考。

The one that should pay attention to the CRD tunnel is fast closing of tunnel in order to reduce the development of the plasticity district and for dual sidewall guide pit tunnel is increasing horizontal supporting rigidity in order to reduce the horizontal displacement.

采用CRD法时,应注重隧道的快速封闭,以减小塑性区的发展;采用双侧壁法时,应注重增加隧道水平支撑刚度,减小隧道水平变形。

In the process of excavating the foundation pit and tunnel of the subway, it isdifficult to deal with the perched water, the saturated water in the aquiclude, as wellas the remaining water on the aquifer surface.

在地铁基坑和隧道开挖施工过程中,会经常遇到弱透水性的饱水层,这些地层在开挖后会出现侧壁渗水和在含水层界面形成残留水,会对隧道的整体稳定产生一定的影响。

With the background of the first sole-layer lining water tunnel - Qingcaosha raw water tunnel undercrossing Yangtze river, and based on the engineering characteristics, building requirements, geology and surrounding environment, this paper analyzes technical difficulties in the course of construction from the aspect of construction of hyper deep pit and long-distance tunnel.

摘 要 文章以国内首例单层衬砌输水隧道工程-青草沙原水过江管工程为工程背景,在深入研究工程特点、建设要求、工程地质情况、周边及沿线环境的基础上,从超深基坑施工和长距离隧道施工的技术难点进行分析,并提出控制措施及建议。

Against the compound transformation problem of existed shield tunnel under construction of foundation pit of the Beixinqiao station in Beijing No.5 subway line, by ANSYS, combining with geological condition and according to the different working condition, three-dimensional numeric models are built and the emulation of the construction process is carried on.

针对北京地铁五号线地铁车站基坑施工条件下既有盾构隧道的复合变形问题,基于ANSYS,结合场地的水文地质和工程地质条件,按照不同的工况建立了三维数值模型,并进行了施工过程的模拟通过对结果的对比和分析,揭示了在不同施工状态下,基坑周围土体、支护结构及既有盾构隧道之间相互作用的过程和机理,以及由此引起的围岩变形的分布与变化规律。

Based on the deep foundation pit project of tunnel in Nanjing metro west extending line, the supporting methods of the bored pile biting into deep mixing pile in soft soil are discussed. The key construction techniques and monitoring results for the supporting form in watered and soft soil bed are expounded. The ability of resisting seepage must be considered when insertion depth of supporting structure is designed, which may also prevent the skirting from losing its stability.

以南京地铁西延线区间隧道的深基坑工程为背景,对软土层条件下的钻孔桩咬合深搅桩的支护方法展开探讨和研究,著重阐述含水软土层中该围护型式的关键施工技术和监测结果,指出在设计围护结构插入深度时必须考虑抵抗渗流破坏的能力,同时安全的插入深度也是防止维护结构&踢脚&失稳的保证。

The supporting system of self-drilling soil-nail with sealing wall made by SMW construction machine are discussed through foundation pit of a tunnel project.

南京某隧道工程垂直支护段采用自钻式土钉与SMW机械施工止水帷幕相结合复合土钉支护技术,介绍了该技术的设计、施工方法,并结合现场试验分析了其受力及变形机理。

第153/168页 首页 < ... 149 150 151 152 153 154 155 156 157 ... > 尾页
相关中文对照歌词
Mosh Pit
Thug Pit
Rocket Skates
Bitch In The Pit
Drip
Hold Your Colour
Passion Pit
An Orgy Of Critics
Raw Shit
Pit Of Zombies
推荐网络例句

But this is impossible, as long as it is engaging in a market economy, there are risks in any operation.

但是,这是不可能的,只要是搞市场经济,是有风险的任何行动。

We're on the same wavelength.

我们是同道中人。

The temperature is usually between 300 and 675 degrees Celsius.

温度通常在摄氏300度到675度之间。