查询词典 slab-sidedness
- 与 slab-sidedness 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Analysis of characteristic of MDF abnormity Based on the measuring data of mould friction of continuous slab casting in steel plant, the fluctuation characteristic of MDF and its rootmeansquare has been studied on the unstable conditions, such as breakout, temperature system warning, abnormity of submerged entry nozzle, mould level fluctuation, and on-line change of slab width.
MDF异常特征和规律分析以宝钢2号板坯连铸机生产中的结晶器摩擦力实测数据为基础,对应现场的漏钢、水口断裂等异常纪录,讨论了生产中采取工艺操作、工艺参数变化及异常发生时MDF及其均方根的波动规律及变化特征。
-
As a kind of construction material, there are many kind of stone finish, like antique stone , split type stone, mushroom stone, flame granite slabs , hone slab, sandblast slab… these kind of finish is mainly to show the roughness of the stone surface, usually we call them rough surface stone.
作为一种建筑装饰材料,石材的商品类型是多元的,如仿古石、剁斧石、蘑菇石、花岗石火烧板,机刨板,亚光板,喷砂板等,是石材表达加工的另外一种形式。因这类石材主要是突出粗糙均匀的表达加工面,习惯上我国常称之为糙面板。
-
According to structural characteristics of floating slab tracks, a track segment element was taken between two adjacent fasteners. For each element, rails were regarded as Euler beams supported by discrete viscoelastic supports. The fasteners and rubber supports were replaced by a linear spring and damp. So the vibration model of the floating slab track was established. In constructing vibration model of a metro train, each car of the metro train with two suspensions was modeled as a multi-rigid body system, in which rigid bodies were connected with each other by a linear spring and damp. Combining the potential energy of vertical vibration of the track with that of the metro train, the total potential energy of vertical vibration of the train and track was obtained. And then, the matrix equation of vertical vibration of the system was established using the principle of total potential energy with stationary value in elastic system dynamics and the "set-in-right-position" rule for formulating system matrices. The vibration responses of the system can be obtained by solving the matrix equation with the direct time integration such as Wilson-θ method.
摘 要:针对浮置板式轨道结构特点,取相邻2个扣件之间的轨道为1个轨段单元,钢轨视为连续弹性点支承Euler梁,浮置板视为弹性薄板,扣件系统及橡胶支座均模拟为线性弹簧及粘滞阻尼器,建立浮置板式轨道振动模型;将城轨列车中的车辆均离散为多刚体系统,各刚体之间通过线性弹簧及粘滞阻尼器相连,建立列车振动模型;将浮置板式轨道及列车振动势能叠加,得到系统竖向振动总势能;基于弹性系统动力学总势能不变值原理及形成系统矩阵的"对号入座"法则,建立此系统竖向振动矩阵方程;采用Wilson-θ逐步积分法求解此矩阵方程,得出此系统竖向振动响应。
-
A Material nonlinear finite element analysis for the cast-in-place reinforced concrete hollow slab that occurs from initial loading, cracking, yielding to failing is carried on. The cracking load, ultimate load, the displacement rules and the principal stress distribution rules of the hollow slab under the vertical loads are obtained. A Material nonlinear finite element analysis for the single span hollow flat-plate floor is also carried on. The function of the concealed wide-flat beams is definite by analyzing the principal stress distribution diagram. The calculating results verify the theoretical analysis and give some important conclusions which are great useful to improve the constructing of the new flat-plate floor.
其次对空心板进行了从加荷、开裂、屈服直至破坏的全过程材料非线性有限元计算,得到了空心板在竖向荷载作用下的开裂荷载、极限荷载及位移和应力分布规律;还对单跨无梁楼盖进行了材料非线性有限元计算,通过分析主应力场明确了柱上暗扁梁的作用;有限元计算的结果验证了以上的理论分析并得到了一些重要的结论,对改进现浇空心板无梁楼盖的构造措施有重要的参考价值。
-
Its wave propagation properties in symmetry and asymmetry structure are analyzed by 3-D EBPM including the analysis and study of the influence of refractive index to wave propagation. The bend fiber-slab is also studied in this paper and point that the influence of the refractive index of the substrate to wave propagation in fiber-slab is very important. The calculating results agree with the results of the test.
本论文利用三维显式光束传播法很方便地分析了对称、非对称光纤—光波导复合结构中光波的传输问题,包括光纤折射率的大小、光波导折射率的大小对光波传输的影响等在内的主要内容;随后又研究了光纤弯曲时光波导包层折射率对光纤内能量功率大小的影响,计算结果和实验结果吻合。
-
The ratio of the vertical load distributed between the arch rib and the tie beam of the two schemes is the same. For the integral girder deck scheme, the longitudinal beams and the deck slab of endure more axial force compared to the ballast girder deck scheme, especially to the deck slab with a conspicuous increase of the axial force and higher stress, and the tie beam endure less. The force-bearing characteristics of the cross beams under the integral girder deck scheme is obviously better than that of the ballast girder deck scheme, especially at the two ends of each cross beam.
在受力上,与道碴板桥面方案相比,整体桥面方案竖向荷载在拱肋和系梁之间的分配基本相同,混凝土板和纵梁分担的纵向力则相对更大,尤其是混凝土板,增幅较明显,应力水平整体较高,系梁分担的纵向力则得到减小,横梁的受力状况整体桥面方案明显优于道碴板桥面方案,特别是在梁端处。
-
The complexity of the 660km discontinuity beneath MDJ shows that the subducting slab materials are piled above the discontinuity, and the existence of this discontinuity beneath HIA shows that the effect of the subducting slab on the discontinuity is very weak.
MDJ台下660km间断面的复杂性体现了俯冲带物质在660km间断面上的堆积,而HIA下660km间断面的存在情况,则表明俯冲带的影响已经相当地弱了。
-
The existing equipment and process technology ability in No.1 steel-making plant of Jigang are analyzed systematically, then a series of revamping items are carried out such as process optimizing of the whole-length protecting cast system, long-life tundish technique, optimization of coated layer of slab MD, setting up slab-quality analysis model on line, auto-control of the liquid level in MD, and so on, then the efficient production is reached.
通过对现有装备和工艺技术能力进行系统分析,济钢第一炼钢厂实施了全程保护浇注系统工艺优化、长寿命中间包技术、板坯结晶器表面镀层技术优化、铸坯在线诊断模型的建立、结晶器液面自动控制技术等,初步实现了高效化生产。
-
Ma,and lithosphere delamination and thermal exhumation during 196~163?Ma.The rapid thermal exhumation,co\|occurred with extensive regional metamorphism and intermediate\|acidic magmatism,implied that the subducted slabs had broken off and delaminated.The p T t path of UHPM consists of two curves,i.e.,a barrette\|like curve reflecting the process of cold slab subduction and exhumation,and a crescent curve representing the thermal exhumation after slab breakoff.
通过全面评述该区变质岩研究成果,作者认为:超高压变质岩的形成和剥露经历了240~200 Ma的板片冷俯冲冷折返和196~163 Ma的岩石圈拆沉热折返;热折返伴随了广泛而强烈的区域变质作用和中酸性岩浆活动,指示板片断离拆沉的发生;超高压变质岩p-T-t轨迹由两部分组成,即反映板片冷俯冲冷折返过程的发夹状曲线和指示板片断离拆沉热折返过程的新月形曲线。
-
The comby corn reinforced concrete hollow slab is much rigid than the spaced rib slab, therefore the displacement is much smaller.
蜂巢芯钢筋混凝土空心板梁楼盖的整体性好、刚度较大,与密肋楼盖相比,挠度有大幅度的减少,使得这种楼盖适于在大跨度大柱网的结构中使用。
- 相关中文对照歌词
- Betty's Worry Or The Slab
- The Slab
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。