查询词典 slab-sidedness
- 与 slab-sidedness 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Bottom slab is classified by grams to select paper bottom slab paper and the size of the amboceptor line.
底版是否按产品纸张克数来选择底版纸和介线的大小。
-
90Ma. The variance of dip angle of subduction slab was caused by the velocity change of subduction slab.
造成俯冲板块倾角随时间变大的主要原因是板块俯冲速度减小。
-
Find the surface bound charge density on the two large surfaces of the slab, and the electric field in the slab.
求平板两表面上的束缚电荷密度,以及平板中的电场。
-
This paper is to research singular transport equations with anisotropic continuous energy homogeneous slab geometry for periodic boundary condition in slab geometry.
在Lp1周期边界条件下各向异性、连续能量、均匀介质的奇异迁移方程,证明了其相应的奇异迁移算子产生C0半群和该C0半群的Dyson-Phillips展开式的二阶余项是紧的,从而该算子的谱在区域Γ中由具有限重的离散本征值组成等结果。
-
A number of calculation examples, including past experiments, our experiments, thick slabs experiments, thin slab experiments, single slab experiments and doweled slabs experiments, are given. By comparing test values with calculating values, some significative conclusions are drawn. The superiority of generalized conforming element for thick-thin slab on foundation is pointed out. The average ranges of foundation parameters are given according to these experiments.
6利用有限元程序进行正分析,用遗传算法进行反分析,识别地基的基本参数,实现地基参数的原位测试;给出大量算例,包括前人的试验和本文的试验、薄板与厚板、单板与接缝板,通过计算值与实测值的比较,得出一些较有意义的结论;阐明了双参数地基上广义协调厚薄板通用元的优越性并给出了试验场地地基参数的平均取值范围。
-
A mathematical model of the direct chill casting process for superlight Mg-Li alloy (LA141) slab has been developed using the finite differential method. Thermal boundary conditions including primary and secondary cooling conditions, have been selected based on knowledges of the physical process and the literatures. The variations of heat transfer coefficient between slab and dummy block interface resulting from the deformation of the slab have been considered.
中文摘要:运用有限差分法,对超轻Mg-Li合金(LA141)板坯直冷连铸过程温度场进行数值模拟,根据实际过程的物理现象以及文献资料确定包括一冷区、二冷区在内的边界条件,并且考虑底模与铸坯之间随着铸坯的变形而引起的换热系数的变化。
-
The results show that space finite analysis results are close to test ones, bottom chords suffer axial force and large in-plane bending, and the max stress is nearby each middle internode. The max stress of node crossbeams occurs in No.2 bottom flange, and that of internode crossbeams happens in ones lying in the middle of every internode. The concrete slab is in tension at the longitudinal direction, and also suffers bent at vertical loads. The degree of completely-composite model taking part in the combined actions is about 55%, while that of semi-composite model is 42%-43%. The combination of concrete slab and bottom chord increases the degree of floor system taking part in the combined actions, lightens the burden of bottom chord, and reduces out-of-plane bending of node crossbeams especially the ones near bridgehead. Stress and displacement of main truss can be evaluated by a equivalent plane rigid frame in preliminary design, and effective stiffness of bottom chords are composed of original ones and concrete slab, and the concentrated load from deck can be translated into uniform load.
研究结果表明:空间有限元分析结果与试验结果较吻合;下弦杆受到轴向拉力和较大的面内弯矩作用,各节间最大应力出现在节间中点附近;节点横梁最大应力发生在横梁2的下翼缘,节间横梁最大应力发生在位于端节间中部的小横梁上;混凝土板顺桥向整体受拉,并在竖向集中荷载作用下产生弯曲变形;全结合模型大部分节间内的桥面板参与主桁共同作用的程度为55%左右,半结合模型桥面板的参与程度为42%~43%;桥面板与下弦杆结合能够增加桥面板的参与程度,减轻下弦杆荷载,减少节点横梁尤其是靠近桥头横梁的面外弯曲;对桥梁进行初步设计时,主桁杆件的位移与内力可按照1个等效的平面刚架计算,下弦杆的等效刚度由原下弦杆截面和混凝土桥面板截面组合而成,桥面荷载可转化为均布荷载施加。
-
Based on the destructive test of certain old pre-stressed concrete hollow slab after structural strengthening by CFS,the destructive mechanism and ultimate bearing capacity of old pre-stressed hollow slab after structural strengthening is being researched,which is useful for the strengthening design of old bridge and solvating of single slab problem.
通过某已使用10年的旧桥预应力混凝土空心板受拉区碳纤维布加固后的破坏荷载试验研究,对受拉区加固后的旧桥预应力混凝土空心板的破坏机理、变形性能及极限承载能力等进行了研究,为旧桥预应力混凝土空心板的加固设计及单板受力问题的分析解决提供了试验依据。
-
The optimal turned-out slab pile problem is to d etermine N slabs from M related pile locations so that the total turned -out slab pile number can be minimized while the corresponding slab sequence re quirements of the rolling turn are satisfied.
最优倒垛问题是如何从M个相关的板坯垛位中选择N个板坯,在满足相应的轧制单元计划所需要的板坯序列要求的条件下,保证总的板坯倒垛次数最少。
-
The heating process and rolling process of slab are very important procedures in hot rolling production line. Reheating furnace should heat the slab to the temperature distribution that is needed by the rolling technology of roughing mill, and roughing mill should roll the slab into the product with the desired dimension. Reheating furnace and roughing mill are two main energy-consuming facilities in hot rolling production line.
钢坯的加热过程和轧制过程是热轧生产线上非常重要的两个生产环节,加热炉需要将钢坯加热到满足粗轧机轧制工艺要求的温度分布,粗轧机则需要根据生产要求将加热好的钢坯轧制成指定规格的产品,这两者是热轧生产线上的主要耗能设备。
- 相关中文对照歌词
- Betty's Worry Or The Slab
- The Slab
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。