查询词典 slab-sided
- 与 slab-sided 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Big slab were only used for billiards tabletop, blackboard, only in recent years it is used in house and commercial building, big slab have many color and size to choose.
大板-大板在过去只运用于台球桌面、黑板和屋顶瓷砖。最近几年才在住宅和商业运用中流行起来,大板作石井材料是比较完美的,它们有很多颜色和尺寸可供选择。
-
By using of on the large-scale test flat and giving the control of ground subsidence curves, the results of large-scale tests of two different abutments (gravity type and cross brace type), which were treated with Geocell wedged-shaped flexible slab, were analyzed. The adaptability to ground subsidence and active property of Geocell Wedged-shaped Flexible Slab were achieved.
首次利用大比尺模型试验平台,结合给出的地基沉降控制曲线,对砂砾填料下土工格室楔形柔性搭板处治两种不同桥台类型之路桥过渡段的大比尺模型试验结果进行了对比研究,对两种桥台类型中土工格室楔形柔性搭板的作用性状及对地基沉降的适应性进行了分析,论文研究成果为该技术的进一步应用打下了坚实基础。
-
The bump at the approach abutment, which is the intuitionistic showing form, is the difficult problem of worrying the highway construction. By using of on the large-scale test flat and giving the control of ground subsidence curves in this paper, the results of large-scale tests of two different abutments (gravity type and cross brace type), which were treated with Geogrid, Geocell wedged-shaped flexible slab and lime soil replacement, were analyzed. The adaptability to ground subsidence and active property of Geocell Wedged-shaped Flexible Slab were achieved.
本文利用大比尺模型试验平台,结合给出的地基沉降控制曲线,对黄土填料下土工格室楔形柔性搭板、土工格栅加筋与灰土换填处治两种不同桥台类型之路桥过渡段的大比尺模型试验结果进行了对比研究,对两种桥台类型中各种处治方法的作用性状及对地基沉降的适应性进行了分析。
-
The entire Superstructure cross-section, except for traffic barrier, shall be considered to be placed at one time for purposes of determining support requirements and designing falsework girders for their stresses and deflections, except as follows: For concrete box girder bridges, the girder stems, diaphrams, crossbeams, and connected bottom slabs, if the stem wall is placed more than 5 days prior to the top slab, may be considered to be self supporting between falsework bents at the time the top slab is placed, provided that the distance between falsework bents does not exceed 4 times the depth of the portion of the girder placed in the preceding concrete placements.
整个上部结构截面除交通障碍,应被视为在一个确定的要求和支持他们的设计应力和挠度除,脚手架时间放在梁的目的如下:对于混凝土箱形梁桥,主梁茎,diaphrams,横梁,和连接底板,如果干墙放置超过5天前向顶板,可能被认为是自我支持之间的脚手架本茨当时顶端板放置,只要脚手架茨之间的距离不超过4倍,在前面的混凝土主梁部分存款放在深度。
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
Relation of main workshop with different structure, internal force of slab floor and stiffness of bearing beam is discussed by finite element program considering space frame of slab floor, and its result is concluded.
使用考虑楼板作用的空间框架有限元程序,对不同结构型式的主厂房、楼板内力与支承梁刚度的关系进行探讨,并对其结果进行分析总结。
-
The design parameters, design criteria and design methods for the stress-absorbing interlays structure on PCC and ACO on cracking and seating slab are discussed. The computation method for equal resilient modulus on top of cracked slab is studied.
最后,系统总结了国内外旧水泥路加铺设计方法,以有限元计算结果为理论依据,提出了基于应力吸收层系统破坏形式的沥青加铺层厚度设计方法和流程。
-
Multi-ribbed slab structure is composed of multi-ribbed slab wall embedded in the hidden frame, which is a brand new structural system.
密肋壁板结构是由密肋复合墙板内嵌于隐形框架而形成的一种新型结构体系。
-
Multi-ribbed slab structure is a new structural system developed in recent years, with multi-ribbed slab wall as its main bearing member.
密肋复合墙体是建筑结构新体系密肋壁板结构的主要受力构件。
-
The paper researches two models for optimized management of slab-yard, and researches respective application about putting-in stock and model of taking-out stock. In the model of putting-in stock, the paper considered the cell of hot-rolling when making plan of putting-in stock, swings in the model of putting-in stock with the parameter 85, which indicates whether the slabs belong to the same hot-rolling cell. In the model of taking-out stock, The paper classed the slab-yard location according to the practice of the factory, based on which, the paper brings forward optimized turned-out algorithm founded on experts system, and the result of the experiments shows that the number of the turned-out pile is greatly reduced with the new algorithm.
文章重点研究了板坯库优化管理中的入库计划和出库计划编制问题,对两个决策模型:入库决策模型和出库决策模型进行了应用研究,其中在入库决策模型中,编制入库计划时就考虑了热轧工序轧制计划单元,在入库决策模型中添加&同一热轧单元&参数δ_5;在出库决策模型中,基于实际应用现场对板坯库库位进行分类,提出基于专家系统的板坯最优倒垛算法,实验结果表明提出的算法大大地降低了倒垛量。
- 相关中文对照歌词
- One Sided Love
- Southside
- One-Sided Love Affair
- Toe Tagz 'n Body Bagz
- Phenomenal
- Southside (Crazy C Remix)
- Rollin
- One-Sided Love Affair
- One Sided Love
- Semi-Automatic
- 推荐网络例句
-
Through comparing with the results by simulation to study the effects of theprojectile"s final velocity, the angle of rotation and the ballistic trajectory"s migration withdifferent projectile"s rotating speeds, different target"s moving speeds and differentpenetration angles.
通过比较数值模拟的结果来研究不同弹头转速、目标速度、侵彻角对侵彻过程中弹头最终速度、翻转角度和弹道偏移的影响。
-
I love stationery and all the accoutrement of writing.
我爱文具以及所有的书写的工具装备。
-
Just loll there: quiet dusk: let everything rip.
只消懒洋洋地享受这宁静的黄昏,一切全听其自然。