查询词典 slab bridge
- 与 slab bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
The slab bridge is a novel bridge style. It substitutes the flexible cable with the prestressed concrete rigid slab.
板拉桥是一种较为新颖的桥型,它以预应力混凝土刚性板代替柔性拉索。
-
The internal force of bridge deck slab can be analyzed through the method that set model. The result of calculation compares with the regulation in " specification ", it can be as to a kind of supplement calculating about the internal force of bridge deck slab in " specification ".
本文建立了分析稀排肋板式结构桥面板内力的模型,计算结果与《规范》中的规定进行比较,它可以作为对《规范》有关桥面板内力计算的一种补充。
-
According to the analysis theory of spatial vibration of high-speed train and slab track system, the effect of voided slab induced by deteriorations of cement asphalt mortar layer, such as felt invalidation, dehiscence, embrittlement and cataclasm, etc, on vibration responses of the slab track was studied.
摘 要:基于高速列车-板式轨道系统空间振动分析理论,研究板式轨道水泥沥青砂浆填充层的劣化(如脱层、开裂、脆化与碎裂等)引起的轨道板悬空现象对板式轨道振动响应的影响。
-
Calculation method of a reinforced concrete isosceles trapezoid slab is experiential arithmetic with which the isosceles trapezoid slab is simplified into an equivalent rectangled slab.
计算钢筋混凝土周边固支等腰梯形板通常是用经验算法即是把钢筋混凝土等腰梯形板简化成当量矩形板进行计算。
-
In the practical production it's proved that the level of central segregation of the slab is prominently lowered and the central porosity removed and thus the internal quality of the slab improved and the quality rate of the post rolled slab raised and the problem of central lamellation of the sample occurring after drawing solved and the satisfactory results achieved.
通过在实际生产中的应用使得铸坯的中心偏析级别明显降低,中心疏松消除,内部质量得到改善;铸坯轧后性能检验合格率得到提高,试样拉伸后产生的中心分层问题得到解决,取得了满意效果。
-
Test and analytical studies indicated that (1) connection moment strengths in positive bending were similar but in negative bending were different on the order of 0.72 and 0.6 percent compared to the bare steel beam subassembly so that the self-centering behavior of the subassemblies with the composite concrete slab was not observed,(2) force-transferring mechanism in the connection proposed was able to predict the force-deformation relationship of the subassembly with the composite concrete slab, and (3) a general-purpose nonlinear finite element analysis program ABAQUS was used to perform the correlation study on the subassemblies with and without composite concrete slab.
实验结果显示(1)含楼版试体在千斤顶往正方向作用时的弯矩与未架设楼版试体接近,但在千斤顶往负方向作用时未架设楼版试体的弯矩分别约为含楼版试体的0.72%及0.6%,所以预力梁柱接合系统於钢梁上架设楼版,对预力系统自行复位的能力造成很大的影响、(2)由预力梁柱接合系统力量与位移间的关系利用迭代方法可以预测含楼版试体的行为、及(3)以有限元素分析程式模拟其中一组含非传统楼版试体以探讨含楼版预力接合系统在挠曲载重作用下的行为。
-
In this paper, based on analysis of existing experiments and examples related to prestressed concrete slab system and finite element method, some problems in prestressed concrete beamless slab and reinforced concrete two-way slab supported by beam as the following items are studied.
本文对以往预应力混凝土板系的有关试验及例题进行分析,结合有限元方法对预应力混凝土无梁板及梁支双向板重点研究了以下内容: 1。
-
A number of calculation examples, including past experiments, our experiments, thick slabs experiments, thin slab experiments, single slab experiments and doweled slabs experiments, are given. By comparing test values with calculating values, some significative conclusions are drawn. The superiority of generalized conforming element for thick-thin slab on foundation is pointed out. The average ranges of foundation parameters are given according to these experiments.
6利用有限元程序进行正分析,用遗传算法进行反分析,识别地基的基本参数,实现地基参数的原位测试;给出大量算例,包括前人的试验和本文的试验、薄板与厚板、单板与接缝板,通过计算值与实测值的比较,得出一些较有意义的结论;阐明了双参数地基上广义协调厚薄板通用元的优越性并给出了试验场地地基参数的平均取值范围。
-
A mathematical model of the direct chill casting process for superlight Mg-Li alloy (LA141) slab has been developed using the finite differential method. Thermal boundary conditions including primary and secondary cooling conditions, have been selected based on knowledges of the physical process and the literatures. The variations of heat transfer coefficient between slab and dummy block interface resulting from the deformation of the slab have been considered.
中文摘要:运用有限差分法,对超轻Mg-Li合金(LA141)板坯直冷连铸过程温度场进行数值模拟,根据实际过程的物理现象以及文献资料确定包括一冷区、二冷区在内的边界条件,并且考虑底模与铸坯之间随着铸坯的变形而引起的换热系数的变化。
- 相关中文对照歌词
- Southside
- Toe Tagz 'n Body Bagz
- Phenomenal
- Southside (Crazy C Remix)
- Rollin
- London Bridge Is Falling Down
- Oh No
- Leanin'
- Oh No
- Rotation
- 推荐网络例句
-
The production moved off-Broadway to New York City, where she won the Joseph E. Calloway award for her performance, and was profiled in American Theater Magazine as one of ten young theater artists to watch.
生产提出过百老汇的新的纽约市,在那里她赢得了约瑟夫calloway奖,她的表现,并于异型在美国的战区杂志之一, 10战区的青年艺术家观赏。
-
It's a risk tradeoff, and I believe that adding test support code usually wins.
这是一个风险的权衡,我相信添加测试代码通常会占上风。
-
Besides, Fantine was only a moderately good workwoman
芳汀究竟还只是一个手艺平凡的工人。