查询词典 skirting board
- 与 skirting board 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
To ensure close adhibition of connecting board, screwing should start from center to outside, that is, screwing from enlarged center to skirting area. To avoid coating's influence on tensile force, screwing work should be finished on one day. And to decrease prestress' difference of high-tension bolt, bolt screwing runs in two steps: primary screwing and final screwing. For large-scale joint with great amount of bolts demands a second screwing.
为使被连接板叠密贴紧,应从螺栓群中央顺序向外施拧,即从节点中刚变大的中央按顺序向下受约束的边缘施拧,为防止高强度螺栓连接副的表面处理涂层发生变化影响拉力,应在当天终拧完毕,为减少先拧后拧的高强度螺栓预拉力的差别,其拧紧必须分为初拧和终拧两步进行,对于大型节点,螺栓数量较多,则需要增加一道复拧工序。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力