查询词典 sketch a plan
- 与 sketch a plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The building materials industry garden area plan uses 3000 Mu land, the total investment will be 1,500,000,000 Yuan, issue of project plan use land 600 Mu , 10 new ceramic production line will be invested, the second phased project plan use land 2400 Mu.50 ceramic production line will put into use in 2010 with the annual output of ceramic production 2 hundred million square miters, After an issue of project had ended, the annual production may amount to 20 hundred million Yuan.
建材工业园区规划用地3000亩,总投资15亿元,其中一期工程规划用地600亩,新上陶瓷生产线10条,二期工程规划用地2400亩,到2010年达到50条陶瓷生产线,年产建筑陶瓷2亿平方米。一期工程结束后,年产值可达到20亿元。
-
This dissertation is addressed on the problem of enterprise procurement plan with outsourcing in global business environment. And the research outspreads with Model Building, Algorithm Design and Algorithm Evaluation.The main work and results is shown as follows.Firstly, the actual research background and motivation about such a topic is outlined and more comprehensive and in-depth survey on the research progress of procurement plan is made. It is indicated that integration procurement plan in supply chain level is the research trend in future.
本文研究了全球商务环境下的带转包企业采购计划问题,遵循建立模型、设计算法和评估算法流程开展研究,主要工作及成果如下:(1)概述了问题的实际研究背景与动机,较全面深入地综述了采购计划问题的研究进展,指出面向供应链的集成采购计划是未来的发展趋势。
-
Face this kind of situation, the author thinks not to answer to the control that funds overspends from production very busy season just begins, and should be when plan of funds of year of make known to lower levels of management department of superior of the beginning of the year, build a rigorous plan management and budgetary management system, combine the characteristic of highway conserve branch, act on the principle of keep expenditures within the limits of income, making overall plans and take all factors into consideration, year funds the plan presses different content, with the work out estimated method, below the analysis, premise that forecast, undertake index is decomposed, layer upon layer fulfil, fore-and-aft decompose team and group, each accessary production unit, transverse fulfil each room, departmental door, implement pyramid form manage by different levels, make every every branch, worker has index, responsible, form fore-and-aft after all, transverse control a network to stagger of edge, freely.
面对这种局面,笔者认为对经费超支的控制不应从生产大忙季节才开始,而应在年初上级治理部门下达年度经费计划时,就建立起一套严格的计划治理和预算治理制度,结合公路养护部门的特点,本着量入为出、统筹兼顾的原则,将年度经费计划按不同内容,用编制预算的方法,在分析、猜测的前提下,进行指标分解、层层落实,纵向分解到班组、各附属生产单位,横向落实到各股室、各部门,实行金字塔形的分级治理,使每个部门、每个职工都有指标、有责任,形成一个纵向到底、横向到边、纵横交错的控制网络。
-
Risk management can be divided into five parts, these five parts are respectively: The risk of turning uncertainty into essential task that the risk is stated discerns the course, the risk changing into being arranged in the order of PRI tabulates the risk analysis course of the necessary task to state the risk, will tabulate and change the definition risk of the task needed in order to tackle the plan in risk to plan the course according to the risk that PRI will be arranged , monitor the risk state and give notice to start the risk and tackle the risk that take action and follow the course, with carry out the action plan of the risk, the risk in order to drop the risk to the task that the acceptable degree needs to finish deals with the course.
风险管理可被划分为五个部分,这五个部分分别是:将不确定性转化为风险陈述的必要任务的风险识别过程,将风险陈述转变为按优先级顺序排列的风险列表所需的任务的风险分析过程,将按优先级排列的风险列表转变为风险应对计划所需要的任务的定义风险计划过程,监视风险状态以及发出通知启动风险应对行动的风险跟踪过程,和执行风险行动计划,以求将风险降至可接受程度所需完成的任务的风险应对过程。
-
The main clue is the normal design process of the regulatory plan. This paper analyzes the plan and development of domestic and overseas high-tech parks and then theorizes a design framework for regulatory plan of high-tech parks in china.
本文以控制性规划设计的一般流程为主线,通过对国内外高技术产业园区规划实践的分析,最终建立了一个关于我国高技术产业园区的控制性规划设计框架。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
As we have learned main component is system of fee of Internet bar plan software plan cost, hardware plan cost.
据了解网吧计费系统主要分为软件计费、硬件计费。
-
Responsibilities:Allocate the available resources in terms of workforce, materials and production equipment to fulfill daily production plan as per business requirements for Dye House Ensure on time delivery and continuous improvement for Dyeing order processing and shorten order lead timeMonitor Dyeing operations and implement action plan to achieve a time-bound labor productivity target Implement quality plan in association with quality department and ensure color quality Lead dyeing workforce to control dyeing production cost in terms of water consumption, electricity consumption, dyed chain/tape wastage generation Establish a safe, healthy and environment-protected working environment to ensure zero industry injury in Dyeing area Assist setting annual manufacturing budget for Dyeing section Monitor people performance and provide training to production supervisors and workers to develop and retain a competent and motivated production workforce
职责:分配现有的在劳动力,材料和生产设备等资源以满足每日的生产计划,实现染厂的业务需求。确保准时交货,不断加快染色订单处理过程,缩短订单准备时间。监控染色过程,实施计划以在有限的时间内完成生产目标。和质量部门实施质量保证计划,确保染色质量。带领染色车间工人减少水,电,生产线等方面的浪费,以控制生产成本。建立一个安全,健康和环保的工作环境,以确保印染环节零工伤。协助制定印染环节年度生产预算。监控员工绩效,为生产管理人员和工人提供培训,以培养,激励,保留合格的生产工人。
-
Initially NALCO had envisaged to spend Rs 3623 crores for its second phase expansion plan during the 10th Plan, which will now spill over into 11th Plan owing to cost escalation following delay in Government approval, he said.
起初,国家铝业公司计划在第10个五年计划的二期扩张计划投资362.3亿卢比,现在因政府延迟了批准时间该项目也将移至第11个五年发展计划中。
- 相关中文对照歌词
- Little Guitars
- Wake Up Call (One More Time)
- Black Belt
- The God Song
- A Sketch In Black And White
- Plan B
- Sleeping In
- Pity The Plight
- Backfired
- Backup Plan
- 推荐网络例句
-
" I' d like to get some rough idea about music in the baroque ear, please."
请简要介绍一下巴罗克时期的音乐,好吗?
-
The results showed that the peak latency and pattern of SEPs elicited by electrical needling in LI-l1 and MP were similar. The amplitude of SEPs elicited by electrical needling in LI-l1 was higher than that of MP. There was no obvious SEPs generation when MM was electrical needling.
结果显示,电针刺激曲池穴和其邻近桡侧伸腕长肌运动点诱发性脑电波的波形和波峰时间是类似的,只是穴位的诱发性脑电波波幅较大,而电针刺激非穴位点并没有明显的诱发性脑电位。
-
Mom and Dad better bone up on these not so ordinary competitions like polo, yachting and synchronized swimming!
爸爸妈妈更好的骨落实这些不是普通的比赛一样,水球,帆船和花样游泳!