查询词典 site test
- 与 site test 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The Unit has maintained repeatedly pre-collated box pattern, the recent upward movement test site frequently to enlarge the volume to a moderate, KDJ and MACD indicators金叉form, short-term rebound in prices is expected to brewing.
前期该股一直维持反复箱体整理格局,近日向上试盘动作频频,量能温和放大, KDJ和MACD指标形成金叉,短期有望酝酿反弹行情。
-
Objective: In order to evaluate the impact of aircraft-made noise on riveters' and test pilots' hearing in aircraft-made site.
目的:探讨噪声对铆工和试飞员听力的影响。
-
To test for reliability, 10 sites were randomly selected (every 10th site on Appendix A) from the 100 sites and recoded three days later.
为了为可信度测试, 10个位置任意地从 100个位置被选择(在附录一上的每个第 10个位置)而且三天之后再编码。
-
This article presents the result of test research at site about the large diameter pile applied in heavy industry building.
本文仅就大直径挖孔灌注桩在朝阳电力修造厂套装车间中的应用,作简单介绍。
-
This article presents the result of test research at site about the large diameter pile applied in heavy industry building.
试验结果证明,大直径桩的承载能力较高、质量较好、造价低,并能避勉施工中的公害。
-
Site tests need a lot of time and money, the datum are not many, even few the test of pile with cap which we need to analyze the effects of cap.
而现场静载荷试验需要花费大量的时间和经费,已有试验资料较少,承台和桩一起试验的资料更少,难以分析承台对单桩水平承载力的影响程度。
-
According to the failure analysis of the test well, that the drilling well locates at the site 30 m far from the outtake may improve the stability and the term of service.
通过对试验钻井破坏情况分析,钻井布置在靠近回风巷侧30 m以内,可能会提高钻井的稳定性和服务期限。
-
2 Removal of 39.1 Improper Work, Materials or Plant The Engineer shall have authority to issue instructions from time to time, for: the removal from the Site, within such time or times as may be specified in the instruction, of any materials or Plant which, in the opinion of the Engineer, are not in accordance with the Contract, the substitution of proper and suitable materials or Plant, and the removal and proper re-execution, notwithstanding any previous test thereof of interim payment therefore, of any work which, in respect of materials, Plant or workmanship, or design by the Contractor or for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.
工程师有权随时发出指令:在指令规定的时间内一次或分几次从现场运走工程师认为不符合合同规定的任何 34 不合格工 39.1 程,材料或设备的拆除和运走材料或设备;用适用合格的材料或设备取代原来的材料或设备;对尽管先前已进行过检验或中间支付,但工程师认为材料,设备或施工工艺,或由承包人本身进行的或由其负责设计的不符合合同规定的工程拆除并重新施工。
-
Since a drilling rig is usually on the site during exploration well testing, this rig is used to retrieve the test string.
p206m 译文:由于在勘探井测试期间,译文:由于在勘探井测试期间,钻机通常还在井场上,通常还在井场上,钻机可用于回收测试管柱。
-
In order to find out the cause of gas well corrosion,the correlative processing of corrosion environment data measured at well site in Zhongyuan oil field was done by use of the grey association analysis method in grey theory on the basis of the material failure analysis and indor simulation test of tubing.
为了弄清气井腐蚀原因,在对油管进行管材失效分析和室内模拟试验的基础上,应用灰色理论中的灰关联分析方法对中原油田现场实测的腐蚀环境数据进行了相关处理,分析了影响气井油管腐蚀的主要因素并探讨了其腐蚀规律。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?