英语人>网络例句>site test 相关的网络例句
site test相关的网络例句

查询词典 site test

与 site test 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on model test in the laboratory and site test, a blasting effect is achieved.

在实验室进行模型试验的基础上进行了现场试验,并取得了较好的爆破效果。

The key of longwall mining along strike safely and efficiently is efficacious controlling of surrounding rock, and the difficult points of surrounding rock controlling are dynamic stability of system "R-S-F" has be made clear by the facts from site test, experimental study and theoretical analysis, and three patterns may cause system "R-S-F" destabilization, such as dislocation, consequentiality and retrogradation among R, S and F in the process of longwall face advancing is put forward in the paper .

大倾角煤层走向长壁工作面开采方法与装备研究由于其矿压显现和围岩破断活动的复杂性而进展缓慢,较少见到国外主要产煤国家此方面的专门文献,我国目前的研究、试验与使用水平处于国际该领域的前沿。

We also obtained the valuable data of the site test in the Erlang Mountain tunnel.

管棚法施工的现场量测资料还很少。

At first, this paper conducts in depth research on classification method, compaction propeties, granulometric composition and crushing of stone. On the basis of clarifying engineering characteristics of material of rock-filling embankment, requirements of ground treatment have been put forword in this paper. Then combined with the site test and engineering practice in SHUINAN Road and LANLIN Road, through the synthetical analysis of factors of influencing densification effect for the maximum grain size of filling material, lay-down thickness, granulometric composition, densification machinery and densification frequency etc., this paper studies key technical problems about construction technologies for spreading and leveling of filling material, choosing densification machinery, densification technology and slope construction systematically. Finally, construction technologies of filling lime-stone and sand-stone roadbed have been proposed in this paper ,which are significant for quality guarantee of highway engineering.

本文首先从石料的分类方法、压实特性、粒径组成以及破碎性等方面进行研究,在明确填石路基填料的工程特性基础上,进而提出了填石路基的地基处理要求,然后结合广西水南路和甘肃兰临路填石路基试验路段上的现场研究,通过对填石路基填料最大粒径、松铺厚度、粒径组成,压实机械以及碾压遍数等影响压实效果因素的综合分析,系统研究了填石路基填料的摊铺与整平技术、压实机械选型技术、压实工艺以及边坡施工技术等施工工艺中的关键问题,最后提出石灰岩类和砂岩类填石路基的施工工艺要求。

Some methods aiming at the two problems have been researched. First, the optimal number of ATE site can be calculated based on a cost model of DAT-ATE. Second, the problem of test schedule which is equitant with two-dimensional Bin-Packing problem is presented. Then a TCG denotation satisfied with T-admissible rule is more convenient for combinational optimization. With Simulated annealing algorithm, better test scheduling results can be achieved; but there is no great optimization space because the efficiency of scheduling is greater than 90%. Third, A novel test compression method——Multi-capture testing is proposed to compress the stimuli. And the ATPG results show that MC achieves high compression ratio which is greater than 90% in some large-scale circuits. MISR, widely used in LBIST, is employed to compress the responses. The aliasing analysis demonstrates that the fault coverage reduction is little due to the existence of aliasing. Fourth, an improved TIC (called S-TIC) aiming at structured test is proposed based on ARM's TIC. A MC scheduling algorithm is proposed to compute the SoC test time and combine MC vectors to SoC test vectors. The scheduling results shows that test time is greatly reduced when using the proper scheduling priority.

首先,给出了低成本ATE的成本模型,根据此模型得到最低测试成本时系统级测试调度的基本参数——测试Site数;其次,本文将DAT-Scan方式的SoC测试调度等价为两维BP问题,为有效地求解该问题,将该BP问题表示为TCG图并通过模拟退火算法解决其求解过于复杂的问题,调度的结果表明该方法在测试时间上有一定改善,并指出DAT-Scan测试调度效率已经大于90%,进一步优化的空间较小;第三,本文尝试通过测试压缩来解决激励所需的测试带宽,提出了Multi-capture结构并解决了MC测试过程中的&矢量&退化问题,MC测试的ATPG结果表明其测试压缩率很高(大电路接近90%);第四,在激励获得很高压缩比的情况下,测试响应也需压缩,本文采用LBIST中常用的MISR作为MC测试的响应压缩电路,理论分析和实验结果都证明了MC测试的别名对故障覆盖率影响较小(小于2%),并对两类别名的成因做了具体分析;第五,在MC测试及其响应压缩的基础上,本文改进了ARM公司的测试控制器TIC使之适合于MC测试,为了解决MC测试矢量合成问题,本文抽取了MC测试模型,通过固定优先级的MC测试调度模拟将MC矢量合成为ATE矢量,并模拟出了总的MC测试时间。

The essentials of design for pier plate prestressed stretching bed and treatment on expansion joint structure are emphasized. Based on the comparison and calculation to this structure in non - linear finite element method with Duncan - Chang model, and through site test, it is proved to be rational in design, simple in structure and convenient in construction.

着重讨论墩板式预应力张拉台座强度和温度应力计算的设计要点及伸缩缝的构造处理,并采用 Duncan- Chang模型对该结构进行了非线性有限元的对比计算,同时配予现场试验观测印证,说明墩板式张拉台座设计合理、结构简单、施工方便。

Based on the results of exploration and in-site test of typical waste dump in southwest mountainous area,the analysis theory and method of waste dump rainfall infiltration are discussed beginning at analysing coal waste's mechanics characteristic and seepage theoty. Fllowed estimating method of waste dump stability is discussed influenced by rainfall. At last a typical engineering example of coal waste dump landslide influenced by rainfall is researched, acquiring research fruit hereinafter.①Particular exploration of typical waste dump in chongqing area and analysis estimate to its area engineering geology are done. Granule gradation、water content、nature density、dry densit etc parameter of waste granular media are tested. The mechanics characteristic of waste are researched by in-site shear experimentation、compressibility experimentation and infiltration experimentation.②The coal waste dumping is different from other consecutive solid material as incompact granule structure. Its shear strength and transforming characteristic also have itself characteristic.

本文针对山区矸石山,结合踏勘和现场试验,从分析矸石散体的力学特性以及渗流理论出发,研究了矸石山降雨入渗的分析理论与方法,在此基础上提出了矸石山体降雨作用下的稳定性评价方法,最后进行了降雨作用下典型矸石山滑坡工程实例研究,取得了以下研究成果:①对重庆山区中梁山、万盛、荣昌、天府、綦江等矿区代表性的矸石山进行详细踏勘,对矸石山的堆放形态及其区域的工程水文地质情况进行调查;针对重庆山区矸石山,测试矸石散体的颗粒级配、含水量、天然密度、干密度等参数、并在此基础上,通过现场剪切、压缩、渗透试验等研究矸石散体的力学特征。

Test output film's site density usually tools of the trade is density gauge, the type of the current density gauge, it is not all the same features, but we use density gauge at least should have test film site density values and film dot value two things, and you must test a higher accuracy.

尝试输入胶片的实地密度值凡是搁置的东西不离是密度仪,长远密度仪的种类比力众,功用也不尽不异,但是我们所搁置的密度仪起码不该敷裕尝试胶片实地密度值和胶片网点百分比值两项功用,并且务必敷裕较矮的尝试精确度。

Test output film's site density usually tools of the trade is density gauge, the type of the current density gauge, it is not all the same features, but we use density gauge at least should have test film site density values and film dot value two things, and you must test a higher accuracy.

尝试输入胶片的实不天密度值凡是搁置的东西不离是密度仪,长远密度仪的种类比力众,功用也不尽不异,但是我们所搁置的密度仪起码不该敷裕尝试胶片实不天密度值和胶片网不面百分比值两项功用,并且务必敷裕较矮的尝试大略度。

By means of analyzing the thermodynamic process within reheating turbine and combining with the on-site test results, traditional steam turbine model for power grid stability calculation is improved, and a brand new concept of natural power overshooting coefficient of high-pressure cylinder is proposed.

华北电力调度通信中心,北京市宣武区 100051通过对再热凝汽式汽轮机热力过程的原理分析,结合现场试验的验证,改进了传统的电力系统稳定计算的汽轮机模型,创新性地提出了高压缸功率自然过调系数的概念。

第1/15页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?