查询词典 simulated
- 与 simulated 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
And the surface temperatures simulated in northwestern China are low in the whole year. RegCM2 simulates the characteristic of geographical distribution and seasonal shifts of rain belt in China. But the simulated rainfall is low.
针对上述问题,我们对目前在中国应用较广泛的区域气候模式RegCM2进行了连续5年的模式气候积分,然后根据模式结果全面检验了模式性能,并重点对云—辐射参数化过程中存在问题进行了敏感性试验和改进工作,最后在改进的模式基础上研究了气溶胶的气候效应问题。
-
The procedure is applied in two projects:(1) Shanghai Huanqiu finance center tower foundation pit dewatering, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 149m, the horizontal flow barrier goes deep to 34m, the extraction wells are penetrated to 55m, the filters of the extraction wells are located between 34m to 55m, and the water level in the deep foundation pit is decreased to 26m under land surface, the result of 8 pumping wells optimization project is designed.(2) The forth subway of Dong Jia-du tunnel repair foundation pit dewatering in Shanghai, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 144.45m, the horizontal flow barrier goes deep to 65m, the extraction wells are penetrated to 60m, the filters of the extraction wells are located between 45m to 60m, and the water level in the deep foundation pit is decreased to 42.45m under land surface, then an optimization project is designed.
最后将成果分别应用于两个工程实例中:(1)上海环球金融中心塔楼基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、抽水井埋深达55m、抽水井过滤器埋深为34至55m,基坑内地下水位降至埋深达26m的情况下的地下水复杂流动状态,得出了8口抽水井优化降水方案;(2)上海地铁4号线董家渡隧道修复基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达144.45m、基坑周围挡水连续墙埋深达65m、抽水井埋深达60m、抽水井过滤器埋深为45至60m,基坑内地下水位降至埋深达42.45m的情况下的地下水复杂流动状态,确定出了最优降水方案。
-
In the exhibition area on the second floor there will be a simulated train crew's control compartment, whose highest simulated speed will reach 350 km/h.
一台动车组的模拟驾驶舱将出现在二层展区,这台驾驶舱的模拟时速最高可达350公里。
-
After the torsion wave was discovered in 1978, three brothers of Li Tailai, Li Tailin, and Li Taifeng invented the torsion meter, fully called Li's simulating meter of the torsion wave-caused destruction, In torsion meter, the torsion waves' coming into being, transmission and all the quake-caused destruction cannot only be simulated, but almost all the process of quake-caused destruction can be predicted and simulated.
继1978年发现了扭波,李泰来、李泰临、李泰丰三兄弟 2006年进而又发明了《扭仪》,全称是&李氏地震扭波破坏模拟实验仪&,在《扭仪》上不仅能展现扭波的产生和传播,还可以模拟和预测地震破坏的全过程。
-
Aiming at the guided entity model of apiece component, some frame boards of skin, ventro-board and crossbeam is simulated with curve surface, strengthen rib, frame and bars are simulated with curves in this paper, predigesting entity models to geometry models.
在ANSYS中,选取体单元solid45、壳单元shell63、梁单元beam188、质量单元mass21分别对相应的几何模型划分网格,用耦合方程实现23-3航炮所简化的质量元同炮舱结构其它组件的连接,建立了炮舱结构的有限元模型。
-
As it fell, the simulated gravity and simulated surface friction made its legs bounce and slip realistically.
当它掉下来的时候,模拟的重力和模拟的表面摩擦力会让它的腿像在现实中那样反弹和打滑。
-
Simulated results show that the model has a better analysis capacity on both time domain and frequency domain, and can also be used in other solar photo-thermal applications.2 Numerical simulation of road snow-melting processThe whole snow-melting process, including the idling process, the snow-melting process and the after-snow process, is simulated.
模拟结果表明,该模型在时域和频域都具有良好的分析能力,而且可以推广至其它有关的太阳能光热应用领域。2道路融雪过程数值模拟在上述温度场分析软件基础上,分别对待融过程、融雪过程和融后过程进行了模拟研究。
-
Because of the quality of ore, blast furnace characteristics of the relationship between medium-sized steel enterprises mainly long association mining, we simulated the second quarter, compared with the spot price of Australian mine co-lowest out of 10%-20%, but assuming that Australian iron ore price agreement long in the third quarter rise about 23%, sea freight and ore spot prices remain unchanged in the next six months, then we simulated the third quarter than the spot price of Australian mine co-7.8% higher price.
因矿石品质、高炉特点等关系,大中型钢企主要采用长协矿,我们模拟的二季度澳矿长协价较现货价低出10%-20%,但如果假设澳矿三季度长协价再涨23%,现货海运费和矿价在未来六个月均保持不变,那么我们模拟的三季度澳矿长协价较现货价高出7.8%。
-
The new circumstances that the discrete manufacturing enterprise is confronted with are analyzed; the function and configuration of production system is expounded; the research actuality and contents about production system capacity in the discrete manufacturing enterprise are summarized; the main research contents in this paper are developed.2. The calculating and analytical methods about production system capacity are studied systemically, a model to calculate rough-cut capacity instantly in "excel" table style is designed, the means to analyze production capacity in different production mode are brought forth, and the balance tactics of production capacity versus load are put forward.3. The application characteristics used in production system about the methods of Computer simulation and CRP in the MRPII/ERP are analyzed and compared; the advantages of Computer simulation method are pointed out; and the simulation researches aiming at production system capacity are implemented by Ithink simulation software.4. A simulation model is founded under the analysis of production system capacity in the production system background of a firm; the change instances of yield, output rate and WIP in the production system are simulated by the action of procurement cycle, machining time, setup time and so on. 5. The change instances of production capacity in the assembly stage are simulated , and rational employees are obtained.
本文主要进行了以下几个方面的研究:1、分析离散型制造企业面临的新情况,阐明生产系统的功能和结构,对离散型制造企业生产系统生产能力的研究内容和现状进行分析,提出本课题的主要研究内容。2、在系统地研究生产系统生产能力的计算和分析方法后,设计了用Excel表快速计算粗能力的方法;给出不同生产方式下的产能分析方法,并提出产能与负荷平衡的策略。3、比较和分析了MRPII/ERP的能力需求计划方法与计算机仿真方法在生产系统中的应用特点,指出计算机仿真方法的优势,并用Ithink仿真软件对企业生产系统生产能力进行了仿真研究。4、以A公司的生产系统为背景,在对生产系统生产能力分析的基础上建立了仿真模型,模拟了在采购周期、加工时间、调整时间以及返工率、废品率、机械开工率等因素作用下生产系统的产量、产出率和在制品数量的变化情况。5、研究在装配阶段生产能力的变化情况,通过仿真优化后确定合理作业人员数量。
-
The results of the comparis on between simulated DLDAS and MODIS land surface temperature indicate that the main difference between two LST are within ± 5K1 The scatter plots and standard deviation suggest that the simulated LST of night is 2 - 3Kmore accurate than that of day time.
对比了模拟的GLDAS地表温度与MODIS地表温度产品,结果显示两者之间的差值介于-5~5K之间,两者的散点图和标准离差显示模拟的夜间地表温度要比模拟的白天地表温度精确2~3K。
- 相关中文对照歌词
- Simulated Love
- Just A Sign
- Black Sheets
- No Shelter
- Genie On A Table Top
- The Adventures Of Greggery Peccary
- Torture
- The Certificate
- Artillery
- Nobody Wants To Be Parrot Man
- 推荐网络例句
-
Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.
目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。
-
On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.
一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。
-
What is the topic sentence of this article?
这篇文章中心的句子是那一句?