查询词典 side-step
- 与 side-step 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The first step is to clean the hawthorns, and then remove the stone. Then use a slender pointed piece of bamboo and string the hawthorns together. The second step is to put water and sugar in a pot and boil it for 20 minutes until it's a liquid. The third step is to put the hawthorns in the pot, coating them in the sugar. The last step is to wait until the sugar cools off and then you're done.
第一步,把山楂洗干净,再把里面的核去掉,用竹签子把山楂串在一起;第二步,把白糖和水放在锅里熬20分钟,熬成汁儿;第三步,把山楂放进锅里,蘸上糖;最后一步,等糖冷却了以后就可以了。
-
Huangshan step by step mountain road step by step scenery, four sides the high peak strange lycopodium cloud gets a panoramic view, says it " considerably ".
登泰山,不象黄山步步山路步步景,四面奇峰怪石松云尽收眼底,谓之&可观&。
-
Zhuang Mashan do in the gym for the dead when the soul of the dead ascend to heaven as soon as possible, must undertake a "step towards" the clearance, step by step around the lantern and Tap dance called "lantern step."
马山壮族人在为死人做道场时,为尽快使死人灵魂升天,必须经过&踩朝&这一关,因围绕花灯踩步跳踏而又名为&踩花灯&。
-
14Th century BC, Ramses II of the ancient Egyptian empire 100,000 people have a standing army; the 8th century BC Sargon II of the Assyrian Empire team has a step-by-step 200,000; Persian King Darius Millions of so-called step-by-step team.
公元前14世纪拉姆西斯二世的古埃及帝国拥有常备军10万人;公元前8世纪萨尔贡二世的亚述帝国拥有20万步队;波斯王大流士的步队则号称百万。
-
After all of these six changes have been carried out on one side of the palate,the operated side becomes completely relaxed.It can be moved both posteriorly and medially to lengthen the side of the palate and to contact with the cleft margin of the non-operated side without tension.Obviously,there is no need to perform the same surgical maneuvers on the other side again.The cleft is then closed by layers.
手术时,在腭部的一侧作完改变的六项操作以后,手术侧的腭部即彻底松弛,可以充分后退,增加该侧腭部先天不足的长度,并随意向近中侧移动,与对侧的裂缘接触,不需要在对侧再作同样的手术操作,即可将裂隙缝合。
-
The head is slowly turned 90° toward the side where nystagmus is induced less intensely. Then the head is rotated 180° rapidly toward the opposite side. This article reports three cases of the ageotropic form of HC-BPPV that were cured by rapid head rotation. The three cases demonstrated that rapid head rotation was an effective maneuver to treat cupulolithiasis on the utricle side. It is recommended that rapid head rotation can be used for therapeutic diagnosis: If nystagmus subsides immediately after this maneuver, the diagnosis is cupulolithias is on utricle side. If nystagmus changes into the geotropic form, the diagnosis is cupulolithiasis on canal side or canalolithiasis in the anterior arm of horizontal semicircular canal. A repositioning maneuver for geotropic form can then be applied to treat these patients.
逆地眼振型水平半规管良性阵发位置性眩晕的3种耳石可能位置如下:水平半规管前臂的管耳石、管侧的顶帽沉石(canal side cupulo-lithias1s)与囊侧的顶帽沉石,本文报告3例以快速转头治疗逆地眼振型水平半规管良性阵发位置性眩晕成功的病例,显示快速转头法对囊侧的顶帽沉石具迅速有效的治疗效果,对於逆地眼振型水平半规管良性阵发位置性眩晕的治疗,作者建议先以快速转头作治疗性诊断,若病人马上复原,诊断为囊侧的顶帽沉石;若眼振转为向地型,则诊断为水平半规管前臂的管耳石或管侧的顶帽沉石,进一步再以向地型的耳石复位法治疗病人。
-
Based on 3D steady and incompressible N-S equation and k-ε turbulent model, the aerodynamic performance of three different design options of 160 km/h container flat wagon was analyzed and compared using finite volume method. The three design options are as follows: the first design option has no headwall and the side surface of side beam is flat; the second and the third both have headwall and high side beam, and the side surface of side beam of the second is obtuse, while the third is cambered.
基于三维、不可压、定常N-S方程和k-ε双方程湍流模型,采用有限体积法对3种不同设计方案在运行时速为160 km/h的集装箱专用平车在有、无横风情况下的气动性能进行分析与比较,其中:方案一的平车无端墙,侧梁侧面平直;方案二和三的平车均加有端墙,且侧梁加高、侧面形状分别为钝形和弧形。
-
Based on 3D steady and incompressible NS equation and kε turbulent model, the aerodynamic performance of three different design options of 160 km/h container flat wagon was analyzed and compared using finite volume method. The three design options are as follows: the first design option has no headwall and the side surface of side beam is flat; the second and the third both have headwall and high side beam, and the side surface of side beam of the second is obtuse, while the third is cambered.
摘 要:基于三维、不可压、定常 N S 方程和 k ε双方程湍流模型,采用有限体积法对3种不同设计方案在运行时速为160 km/h的集装箱专用平车在有、无横风情况下的气动性能进行分析与比较,其中:方案一的平车无端墙,侧梁侧面平直;方案二和三的平车均加有端墙,且侧梁加高、侧面形状分别为钝形和弧形。
-
A machine component comprising: an elongated base plate with side edges, a linear actuator assembly having two parts which can move away from and toward each other, first mounting means on said base plate, said mounting means supporting one part of said assembly, a slide plate rectangular in cross-section and having parallel straight side edges, two elongated guide members each having a rectangular slot adapted to slidingly receive the edge of the slide plate, each elongated guide member including a lowerpart and an upper part and means for securing them together, the lower part having means for attachment to the base plate, said rectangular slot having (1) a first side wall adjacent to and parallel with the base plate, said first side wall being definedby a surface of said lower part,(2) a second side wall defined by a surface of said upper part, and (3) a bottom wall defined by a surface of one of said upper and lower parts, the upper and lower parts having oblique mating surfaces such thatlongitudinal meovement of one part with respect to the other causes the parts to separate from or approach each other in a manner to change the width of said slot, and second mounting means establishing a connection between the slide plate and the other part of said assembly.
有一长条形底座与身边的边缘,一个线性驱动器装配有两个部分,可以离开,彼此之间,首批意味着在说底座、说安装方式支持之一说总成,一个矩形截面板、平行直边棱、两种细长的引导会员都有一个矩形槽适应slidingly收到边缘的细长板,每一个lowerpart引导会员包括一个上方和手段,确保他们在一起,下方附件的方式,在底座,说矩形槽有(1)第一次侧墙毗邻,平行底座,一边说:definedby墙表面说下方,(2)第二次侧墙表面的定义,并说上方(3)底壁由一个表面的上部和下部零件,说上部和下部阀部件表面的thatlongitudinal拥有斜meovement这样的一部分的原因部分可以分离或接近对方的方式来改变宽度的槽,第二次安装方式,建立连接板之间,另一部分说总成。
-
The crushed rock in the side abutment weakens the side restriction while the side wall and the apron strengthen the side restriction. The analysis showed a new stress distribution with automatic modification and less stress concentration when the side restriction is weakened by using crushed rock in the abutment.
结合某碾压混凝土拱坝的拱座,在减弱和加强侧约束时,即在坝体部分高程的破碎软弱岩石减弱坝体侧约束以及坝体下游边墙和护坦增强坝体侧约束的情况下,研究侧约束对于坝体应力和位移的影响。
- 相关中文对照歌词
- Step By Step
- Step By Step
- March Nigga Step
- My Shoes
- Step Your Game Up
- Take Another Step
- Step Up
- Step By Step
- Yo Side Of The Bed
- Step
- 推荐网络例句
-
The work of this paper is as follows: 1. Looking back the progressing history of the linear motor, introducing the features of the elevator driven by linear induction motor, radicating the topic of this paper "the digital frequency variable control of the elevator bi-side direct driven by linear induction motor". The research of this paper covers the conventional VVVF control, space vector based VVVF control, vector control and DTC.
本文主要开展了以下几个方面的工作: 1 回顾了直线电机发展历史,电机的驱动技术演变,特别是针对直线电机的驱动,简要介绍了直线感应电机驱动电梯的优点和不同结构类型,对传统的v/f控制,基于空间矢量法的v/f控制,矢量控制,和基于电压空间矢量的直接转矩控制进行了比较,确立了本课题的研究主题:直线感应电机双边直推式驱动电梯的全数字变频控制。
-
The article combines with the treatment of a superficial civil air defense work to introduce how the grouting method to improve the performance of the backfill soil.
文章从治理漂浮人防工事的角度提出了注浆技术在改善回填土性质方面的应用,并详细阐述了注浆技术的施工流程。
-
I knew nor shyness nor fear, my life was boisterous.
我不懂得羞怯和惧怕,我的