英语人>网络例句>side beam 相关的网络例句
side beam相关的网络例句

查询词典 side beam

与 side beam 相关的网络例句 [注:此内容来源于网络,仅供参考]

As he plowed his fields he concieved of drawing a picture with an electron beam just like he was plowing the field, one line at a time, from top to botton and side to side.

正如他自己领域的袭击,他concieved绘制的图片与电子束就像他是春耕外地,一次一行,从顶部向底部和侧面向一边。

Existing literature on the inquiry,collation and analysis,this article had the following major tasks:1st,finite element simulation of the current analytical methods are summarized,and system introduction finite element software ADINA and ANSYS applied in the reinforced concrete built-up section.2nd,system introduction reinforced concrete component material performance as well as reinforced concrete nonlinear analysis main mathematical model. 3rd,the use of ANSYS and ADINA software simply supported beam simulation were compared.4th,uses the ANSYS analysis software,conducted 7 radical center bearing reinforcing steel-side steel pipe concrete short stump simulation test research,the research had indicated the reinforcing steel the existence strengthened the pillar ductility greatly.5th,based on ANSYS,has conducted 2 radical center bearing reinforcing steel-side steel pipe concrete member in bending simulation test research.

通过对现有文献的查询、整理及分析,本文进行了以下主要工作:1、对目前有限元模拟分析方法进行了总结,并系统的介绍了有限元软件ADINA和ANSYS在钢筋混凝土组合结构中应用。2、系统的介绍了钢筋混凝土构件的材料性能以及钢筋混凝土非线性分析的主要数学模型。3、利用ANSYS和ADINA软件对简支梁进行了对比模拟分析。4、利用ANSYS分析软件,进行了7根轴心受压钢骨-方钢管混凝土短柱的模拟试验研究,研究表明钢骨的存在大大加强了柱子的延性。5、利用ANSYS分析软件,进行了2根轴心受压钢骨-方钢管混凝土受弯构件的模拟试验研究。

The banjo-type axle housing 10 comprises an enlarged central, or banjo, portion 12 defining a hollow interior adapted for housing a differential assembly therein, and a pair of sleeve-like axle beam portions 14R and 14L outwardly laterally extending from opposite sides of the center portion 12 for housing axle shafts. The central portion 12 has a front carrier opening 16 formed therethrough on its forwardly facing side, and a rear opening 18 formed therethrough on its rearwardly facing side.

桥壳banjo-type组成的中央,放大10分12个定义斑鸠,或是一个空洞的室内适合住房差动总成,和一双sleeve-like轴部分梁横向延伸14L 14R外,从两端的中心部分12住房刚性车轴。12有一个中央部分开放前载体上16形成籍由氧化还原,使得面对18形成一个开放其rearwardly面对籍由氧化还原。

The elastic supporting forces are regarded as loads and act reversely on longitudinal beams, then the forces acting on longitudinal beams are calculated. Through structure selection, the large rectangular aqueduct bridge with high side beams should be adopted firstly. Because the side beams may reduce the middle beam loads, the span of aqueduct bridge can be increased.

通过结构形式的比较,指出具有大边梁的多纵梁矩形渡槽其侧墙兼做纵梁用,充分利用侧墙刚度大的特点,使横向挡水和纵向承重结合在一起,可以有效地减小水荷载对中纵梁的作用,从而增加渡槽的跨越能力,在大型渡槽的设计中应优先采用。

Changing the connecting form of side board and beam flange, considering remainder stress, researches on the influence of side board on connections were done.

改变侧板与梁翼缘的连接形式,考虑残余应力分布,研究侧板对节点受力性能的影响。

We hope you pay more attention to jobs are as follows haven't been finished this week:(1) right and left side of upper water wall has been aligned and fixed;(2) Nine downcomers been pre-stored;(3) All the wall packing aligned and fixed, then install right and left side rigid beam;(4) Finishing welding counterpart of front wall packing;(5) Get two booster pump for turbine driven boiler feed water pump aligned and make inspection;(6) Electric Feed Water Pump Unit, Coupling and Motor Pump positioned;(7) Equipment in Start-up Boiler House aligned and make inspection;(8) Get three Reusing Water Pump aligned;(9) Equipment in Integrated Water Pump House aligned and make inspection.

本周,以下工作未完成,希望贵单位引起重视:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)2台汽动前置泵找平找正,并验收;(6)电动给水泵组,耦合器和电泵就位;(7)启动锅炉房内设备找平找正,并验收;(8)3台复用水泵就位;(9)综合水泵房内设备找平找正,并验收。

Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.

下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。

A typical dragon boat ranges from 50-100 feet in length, with a beam of about 5.5 feet, accommodating two paddlers seated side by side.

一个典型的龙舟不等50-100英尺长,以束约5.5英尺,容纳两个乒乓球坐在并排的。

In the main peak,"Snow Bonding" side by side next to a 3 at about 5,000 meters above sea level in the mountains of their link line, with the Huanglong Mountain, snow-capped mountains southeast of Songpan composition of the beam barriers, cross the area of 160 square kilometers.

在主峰&雪宝鼎&的身旁并列着3座海拔5000米左右的大山它们连结成一线,同黄龙山、雪山梁组成松潘东南之屏障,所跨面积达160平方公里。

New box design with durable 0.5 inch (13 mm) paving skin Vertically-adjusting mold mount for precise leveling of mold to machine Telescoping end sections with 12 inches (305 mm) of width variation on each side are available Standard paving depth is zero to 24 inches (610 mm)Edge slump adjustment Hydraulic Vertical Hinged Sideplates, self-contained inside the mold for track clearance Split, pressure-compensated sideplates Folding side plate wings for transporting without removing Pivoting mold mounting beam to eliminate stress points Self-supported TA is hydraulically driven with 3.5 inch (89 mm) ACME screws for up to a six inch (152 mm) crown Front and rear top T-bar on mold for attaching accessories and structural integrity Inserts are bolted together with front and rear alignment pins for easy mold assembly New vibrator mounting tube attaches to T-bar on mold – Vertical vibrator lift – Rear lubrication system with grease zerks accessible from the work bridge New strike-off – Mounted on paver frame T-rail, independent of the mold – New modular design with wedge lock system for ease in changing widths – 10 inches (254 mm) of hydraulic height adjustment – Hydraulic crown adjustment Spreader plow mounted to paver frame T-rail, optional auger available Tamper bar optional

与耐久性的新的箱子设计铺精密水准测量的0.5英寸(13 mm)皮肤垂直调整的模子登上模子用机器制造挤撞与12英寸(305 mm)的末端部分在每边的宽度变异是可利用的标准铺的深度是零对24英寸(610 mm)边缘暴跌调整水力垂直的取决于的Sideplates,独立性在轨道清除分裂的模子里面,折叠运输的pressure-compensated sideplates旁边板材翼没有去除在轴上旋转的模子架置射线消灭重音点Self-supported TA水力驾驶与3.5英寸(89 mm)由六英寸(152 mm)冠决定的尖端螺丝在前后冠上在模子的T酒吧附有的辅助部件并且结构正直插入物与容易的模子汇编新的振荡器架置管随员T酒吧的定位销一起在前后被闩上在模子–垂直的振荡器推力与油膏zerks的–后方润滑系统容易接近从新工作的桥梁触击–在摊铺机框架足迹,模子的独立登上了与楔子锁系统的–新的模块设计在改变的宽度的舒适的– 10英寸(254 mm)水力高低调整–水力冠调整分布器犁登上了对摊铺机框架足迹,任意任意木钻可利用的堵塞器的酒吧

第4/9页 首页 < 1 2 3 4 5 6 7 8 9 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力