查询词典 shift bid
- 与 shift bid 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Objective To study the efficacies of quadruple regimens for thetreatment of peptic ulcer disease and eradication of Helicobacter pylori.Methods 102patients with Hp associated peptic ulcer were randomly divided into three groups,groupA(n=98)received sanjiuweitai-based quadruple regimen(Yangweishul.2g,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid);group B(n=31)received colloidal bisˉmuth subcitrate110mg,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid;groupC(n=23)received ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid.Antibiotics were griven for two weeks,the other drugs were given for six weeks,the efficacies were determined by gastroendoscopy or 13 C—UBT.
目的 探讨四联疗法对消化性溃疡的治疗作用及根除幽门螺杆菌的效果方法将102例胃镜证实消化性溃疡者随机分为3组,A组48例给予养胃舒1.2g+雷尼替丁150mg+阿膜西林500mg+甲硝唑400mg,bid;B组31例给予铋剂220mg+雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;对照组(C组,23例)给予雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;以上药物除抗菌药物只服用2周外,其余药物服至6周末疗程结束,第7周复查胃镜和 13 C呼气试验。
-
Methods 102patients with Hp associated peptic ulcer were randomly divided into three groups,groupA(n=98)received sanjiuweitai-based quadruple regimen(Yangweishul.2g,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid);group B(n=31)received colloidal bisˉmuth subcitrate110mg,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid;groupC(n=23)received ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid.Antibiotics were griven for two weeks,the other drugs were given for six weeks,the efficacies were determined by gastroendoscopy or 13 C—UBT.
将102例胃镜证实为消化性溃疡者随机分为3组,A组48例给予养胃舒1.2g+雷尼替丁150mg+阿膜西林500mg+甲硝唑400mg,bid;B组31例给予铋剂220mg+雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;对照组(C组,23例)给予雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;以上药物除抗菌药物只服用2周外,其余药物服至6周末疗程结束,第7周复查胃镜和 13 C呼气试验。
-
Methods 102patients with Hp associated peptic ulcer were randomly divided into threegroups,groupA(n=98)receivedsanjiuweitai-basedquadrupleregimen(Yangweishul.2g,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid);group B(n=31)received colloidal bisˉmuth subcitrate110mg,bid+ranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid;groupC(n=23)receivedranitidine150mg,bid+amoxicillin500mg,bid+metronidazole400mg,bid.Antibiotics were griven for two weeks,the other drugs were given for six weeks,the efficacies were determined by gastroendoscopy or 13 C―UBT.
将102例胃镜证实为消化性溃疡者随机分为3组,A组48例给予养胃舒1.2g+雷尼替丁150mg+阿膜西林500mg+甲硝唑400mg,bid;B组31例给予铋剂220mg+雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;对照组(C组,23例)给予雷尼替丁150mg+阿莫西林500mg+甲硝唑400mg,bid;以上药物除抗菌药物只服用2周外,其余药服至6周末疗程结束,第7周复查胃镜和 13 C呼气试验。
-
Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .
本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。
-
In this paper, the theory, algorithm, and experiment of automatic object detection and tracking are studied in depth. It is firstly pointed out that the essential of Mean Shift method is a special Newton-Gaussian method. A new method named Fast Mean Shift is established to stretch the conservative step of Mean Shift method. The convergence and validity of this new method are proved in theory. And it is also proved that the convergence speed of Fast Mean Shift is faster than that of Mean Shift. The contrast experiments of searching the maximum possibility density of random of data sets in plane and 3D space are done. The results show that this new method can reduce the iterations greatly. A new object tracking method based on Fast Mean Shift is built to improve the object tracking performance, which is shown in the face tracking experiment with the tennis sequence provided by the Ohio State University, and the car tracking experiment with the car sequence provided by Kalsruhe University. The face trcking experiment with highly noised images show that the object tracking method based on Fast Mean Shift has strong anti-jamming ability. A new fast color object detection technology based on characteristic color is established, which use characteristic color distribution to compute the characteristic color vector of any area in an image quickly. With the high performance search method, the fast object detection is achieved. At last, using object tracker based on Fast Mean Shift and color object detector based on characteristic color with the Kalman filter, PID controller, searial communication and other technologies, automatic object detection and tracking system with control system is built. The availability and anti-jamming ability of this system are verified by some object detection and tracking tests in different scenes.
本文对目标自动识别与跟踪进行了理论、计算、试验三方面的深入研究,主要包括:首次指出了目标跟踪技术中常用的均值迁移方法的本质为一种特殊的高斯-牛顿方法,改进了均值迁移方法步长取值保守的弱点,建立了快速均值迁移方法,证明了该方法的收敛性、有效性以及收敛速度优于均值迁移方法;进行了平面和3维随机分布数据集的最大概率密度搜索对比试验,试验结果表明,快速均值迁移方法大大减少了迭代次数;建立了基于快速均值迁移的目标跟踪方法,利用俄亥俄州立大学提供的乒乓球序列图像和卡斯鲁厄大学的汽车序列图像,对人脸和汽车目标跟踪性能分别进行了对比试验,并进行了高噪声人脸图像目标跟踪试验,结果表明,基于快速均值迁移的目标跟踪方法有效提高了目标跟踪性能,具有很强的抗干扰能力;建立了一种新型彩色目标自动识别方法,采用特征色彩分布函数实现了对任意图像区域特征色彩矢量的快速计算,建立了高效的搜索方法,实现了彩色目标的快速识别;将基于快速均值迁移方法的目标跟踪方法、基于特征色彩的目标识别方法与卡尔曼滤波、PID控制、串行通讯等技术结合,建立了带有控制系统的快速目标自动识别与跟踪系统,并在不同场景下进行了目标自动识别与跟踪试验,验证了快速目标自动识别与跟踪系统的有效性和抗干扰能力。
-
Article 7 The bid evaluation commission shall be organized and established according to law and be responsible for the bid evaluation activities, for recommending candidates for bid-winning to the bid inviters or determining the bid-winners directly according to the authorization of bid inviters.
第七条 评标委员会依法组建,负责评标活动,向招标人推荐中标候选人或者根据招标人的授权直接确定中标人。
-
The article is based on the policy analysis for bid invitation and bidding of engineering and construction project, according to systemic theory knowledge, make innovative research for the bid evaluation method which meet with the requirement of existing policy and regulations. penman settle and analyses the result for the exercise of the innovative bid evaluation method so as to make the bid evaluation method more reasonable and embody the bid evaluation principle: fairness and justness.
本文以工程建设项目招标投标政策分析为基础,结合系统理论知识,对符合目前政策法规要求的评标办法进行创新性研究,并对创新的评标办法在项目实际操作中运用后的结论进行整理和分析,以使评标办法更趋科学、合理,体现公平、公正的评标原则。
-
In equilibrium, the bid and ask prices depend only on the numbers of buy and sell orders in the book. The model has a number of empirical predictions: higher trading activity and higher trading competition cause smaller spreads and lower price impact; market orders lead to a temporary price impact larger than the permanent price impact, therefore to price overshooting; buy and sell orders can cluster away from the bid-ask spread, generating a hump-shaped order book; bid and ask prices display a comovement effect: after, e.g., a sell market order moves the bid price down, the ask price also falls, by a smaller amount, so the bid-ask spread widens; and when the order book is full, traders may submit quick, or fleeting, limit orders.
均衡时,出价和要价仅仅依赖于买卖本书的订单数量:(1)较高的贸易活动和贸易竞争造成较小的买卖差价并且降低价格的影响;(2)市场订单导致了临时的价格影响会大于永久性的价格影响,因此会形成价格过度;(3)买卖订单可以从集群申办远离价差,产生驼峰形的订单;(4)出价和要价显示了联动效应:例如,由于份额较少,销售市场订单导致投标价格下降,卖出价格也会下跌,因此买卖价差扩大;(5)当订单已满,投资者可以提高提交速度,或短暂的使用限价订单。
-
The valuators send the bid information to the resources entities,whether the resources entities bid according to the bid information,if the valuators receive bid applications sent by the resources entities,than they just only research trusted entities in the resources entities that they have send the bid applications,than the valuators sign the contract with the resources entities which accord with the conditions.
首先由评估者向资源实体发出招标信息,资源实体根据招标信息投标或不投,评估者收到资源实体的投标申请书,就只需在已发投标申请的资源实体中进行信任查找,然后与符合条件的资源实体签订合约;在信任更新机制中将推荐行为发生后总体信任值作为较真实的信任值,与中间实体推荐信任值比较,根据二者的误差生成反馈,调整对此实体的信任度。
-
After a noncompetitive advance, doubler's strength-showing cue-bid does not promise another bid if advancer bids no higher than two of his original suit, but the cue-bid promises another bid if advancer bids higher than that.
在非竞叫性的回答之后,加倍人在回答人叫牌后以扣叫示强时,若回答人未逆叫,则加倍人的扣叫并不保证再叫,但若回答人逆叫,则加倍人的扣叫保证再叫。
- 相关中文对照歌词
- Sweet Love (Night Shift)
- Employee Of The Year
- The Shift
- Working The Midnight Shift
- Graveyard Shift
- Graveyard Shift
- Boom Boom
- Adrenalin
- Graveyard Shift
- Gone Til November (The Makin' Runs Remix)
- 推荐网络例句
-
All of that was part of some slow recovery process.
所有的那些都是一个缓慢的恢复过程。
-
These were the sons of Abihail, the son of Hurl, the son of Jara, the son of Galaad, the son of Michael, the son of Jesisi, the son of Jeddo, the son of But.
他们都是阿彼海耳的子孙:阿彼海耳是胡黎的儿子,胡黎是雅洛亚的儿子,雅洛亚是基肋阿得的儿子,基肋阿得是米加耳的儿子,米加耳是耶史赛的儿子,耶史赛是雅多的儿子,雅多是步次的儿子。
-
I like chicken, haddock, steak, meat loaf, pork and ribs as far as meat goes.
我喜欢鸡,鳕,牛排,肉片,猪肉,排骨,我想知道我该吃什么水果,能吃多少?