查询词典 section plane
- 与 section plane 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
Tear off fault section close erect, much on seismic section plane performance is wave series fault to break, inphase axis is disorder wait for diagnostic; to be on horizontal time section, expression is inphase axis twist, size and the diagnostic; such as change yield record to basically be behaved in logging curve appear often to lie between interlining and toothed the buildup that changes rate.
撕裂断层断面近竖立,在地震剖面上多表现为波组错断、同相轴紊乱等特征;在水平时间切片上,表现为同相轴扭曲、宽窄和产状变化等特征;在测井曲线主要表现为隔夹层的频繁出现以及锯齿化程度的增强。
-
Calculate what forecasted the pressure coefficient of wing section surface as a result to distributing, the circumstance such as isopleth of the position of average rate section plane, shock wave, Mach number.
计算结果猜测了翼型表面的压力系数的分布、平均速度剖面、激波的位置、马赫数等值线等情况。
-
In the procedure of researching and developing project, brings forward the method of fast establishing new project based on template file; develops the module used for forecasting movement and deformation of multiple random-shape faces according to probability integral principle; according to the traits of forecasted data, puts forward a new algorithm of drawing isoclines in Maplnfo environment; designs the new algorithm of drawing section plane and the new calculation of area and volume of subsided section based on isoclines; at the same time, gives the rale of classifying mine surface damage under GIS environment on the basis of GIS uncertainty theory.
在课题的研制过程中,提出了以模板文件形式快速建立新项目的方法;运用概率积分法编写了任意形状多工作面开采沉陷地表移动与变形预计模块;根据预计数据的特点,基于MapInfo设计了等值线新的绘制算法;基于等值线设计了新的剖面图绘制算法和塌陷区面积、体积的计算方法;并结合GIS不确定性理论提出了GIS图形环境下矿区地表塌陷破坏等级划分准则。
-
With the vertical time sequence results computed by the monitoring data (until Aug, 2008) from 28 GPS stations of continuous observation in Tianjin and Beijing Area, the paper analyzes the variation characteristics of vertical component of each GPS continuous stations, calculates the vertical movement velocity of GPS stations in Tianjin and Beijing Area of 2007~2008, compares with the vertical deformation velocity calculated by leveling of 2007-2008 in Capital Circle Area; Furthermore, searches GPS stations nearby the leveling route, corresponding to the first and second leveling time period, calculates the section plane of GPS route, analyzes and compares the section results of GPS and leveling of 2 time periods.
利用北京和天津地区的28个GPS连续观测站资料(资料截至2008年8月)计算得到的垂直向时序结果,分析各个GPS连续观测站垂向分量的变化特征,计算得到2007~2008年北京天津地区GPS站垂直运动速率,并与水准测量计算得到的2007~2008首都圈地区垂直形变速率进行比较;通过寻找水准测量路线附近的GPS站点,相应于水准的初测和复测时段,计算得到GPS路线剖面图,将GPS与水准2个时段的剖面结果进行对比分析。
-
The presterssed anchor cable frame combined with backwall, drainage is necessary due to longtime sability and permanent utilization.Firstly,according the study of engineering of geology situation of the high slope, the mechanism of deformation failure and the major hazard of the high slope of PanMei is analysed comprehensively.And the whole slope is divided into two different geology enginnering areas:Western slope(1160 section plane -1240 section plane)and Eastern slope(1240 section plane -1320 section plane). The result of 3D numerical simulation is the same as geology judgement. Later,slope cut (1:0.75) is implemented based on the engineering comparison and criterion.Meanwhile, Limit equilibrium method , Monte Carlo Probabilistic slope stability the stability , Sensitivity analysis and Finent element method of for assessing the cutted slope stability is carried out. The result indicates that Western slope is instable, Eastern slope is relatively stable.So much attention should be paid to Western slope.Different reinforcement measures in different areas are given according to its stability and meet economical request. Gravity wall is introduced in accordance with landform in order to prevent small falling at the foot of the high slope ,which will be a threat to the high slope stability. Handling measure is also applied to Eastern slope. At last,FLAC3D numerical analysis shows the feasibility and reasonableness of the handling measure of the high slope.
论文首先研究了边坡的工程地质条件,全面分析边坡的变形破坏机制和边坡的主要地质灾害,将边坡分为西段不稳定边坡区(1160剖面~1240剖面)和东段相对稳定边坡区(1240剖面~1320剖面),通过三维数值模拟再现了边坡在自重作用下的破坏机制和过程;在此基础上通过工程类比和规范要求,确定按照1:0.75进行放坡处理,并分析了放坡后边坡的稳定性状况,分别通过极限平衡法、蒙特卡洛法概率分析、参数敏感性分析和有限元稳定性计算等多种方法对边坡在各种工况下的进行稳定性研究,计算结果表明,西段边坡较之东段边坡稳定情况差,是边坡支护的关键之处,而东段边坡相对是稳定的;边坡的综合治理措施选用的是框架锚索并结合挡土墙和排水工程,治理设计根据不同区段的稳定性情况采用不同的支护结构,做到了经济合理的要求;在边坡的坡脚设置重力式挡土墙,防治边坡小规模的崩塌,会对上部的锚索支护护造成不利影响,进而影响边坡的稳定;东段边坡的填方区也给出了治理对策;最后通过三维显示拉各朗日有限差分程序(FLAC3D)模拟了高边坡放坡和支护效果,论证了治理措施的有效性和合理性。
-
The thesis is about the research of the updating problem of strip mine geological model that taking contour plane and section plane as the foundation,adopt the Re-development of CAD,through digitization of mine graphs,use geology stetch data,realize contour plane,section plane upgrading each other,on this basis,have developed the geological information management system of production.
本文主要研究传统露天煤矿以平、剖面为基础的生产地质模型的更新问题,采用二次丌发的方法,通过矿图数字化,使用地质写实信息来实现平、剖面的相互更新,在此基础上,丌发了生产地质信息管理系统。
-
Ray tracing method is used to calculate the spot pattern for different lens section plane,and then lens section plane of available dielectric material is optimized to reduce aberrations,so as to expand the field-of view.
采用射线追迹方法计算不同透镜剖面成像系统焦面上的点列图,对商用介质材料透镜通过优化剖面形状来减小像差从而获得视场扩大的效果。
-
The registration involves such steps as registration plane scanning,establishment of registration table ,section plane scanning,recognition of registration substance and registration of all sections.
一种不需要附加定标硬件系统的定标方法是根据各超声断层中定标物与目标物相对空间位置关系,通过定标平面扫查、建立定标表、断层平面扫查、识别定标物、定标各断层等超声断层定标过程,来确定各超声断层的空间相对关系,以达到断层标定的目的。
-
You can buy joysticks and other equipment at www.X-Plane.com in the "orders" section.
你可以从 www.X-Plane.com 的orders板块里订购摇杆和其他的设备。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?