查询词典 second-grade
- 与 second-grade 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The First Party will be entitled to take the punishment to the Second Party in manner of amercement, if the Second Party is absent from work without the doctor's certification.
连续旷工三天以上违纪者将视为乙方有意违反合同,雇主有权提前终止合同并遣送乙方回国,一切损失由乙方自己承担。
-
A second break allowed him to take the second set 6-2, and while Andreev held his serve throughout the third, it was always going to come under pressure at the sharp end.
在第二次破发得手之后,他以6-2拿下了第二盘。随后,Andreev在第三盘的发球局中始终被动地处于巨大的压力之中。
-
Department of anesthesiology, second affiliated hospital of second military medical university, shanghai 200003, china
作者单位:解放军第二军医大学附属上海长征医院麻醉科,上海200003
-
Hence, the first and second generations of anglicized people will still be influenced by their ethnic cultures, thus other people will not be able to see the full anglicize effects on them (In other words, most of the first and second generations of anglicized people will not feel and think that they are being anglicized).
因此,第一及第二代英语化者还会受本族文化的影响,其他人因此将无法从他们身上看到英语化的全面作用(換句话说,第一及第二代英语化者多数不会觉得,也不会认为,本身被英语化了)。
-
It is part of the success of the theory that the same value—approximately one angstrom per second per second —works for all these diverse appearances.
同一个数值能够适用于那麽多不同的情况,也算是这个理论的成功之处。
-
The invention relates to an ESD protector which comprises the first well and the second well inside the semi-conductor liner, while a separating area is between them; the N pour area is inside the second well, to couple the first node; the NLDD area is between the N pour areas, and annularly poured under the NLDD areas; when the voltage of first node is higher than the breakdown voltage, the current discharge path is limited by the NLDD area and annular pour; said breakdown voltage is lower than the breakdown voltage of oxide of logic gate.
本发明提供了ESD保护技术。一种ESD保护器件包括设置在半导体衬底中的第一阱区和第二阱区,并且隔离区位于中间。N 注入区被设置在第二阱区中,并且在第一节点处耦合在一起。NLDD区被设置在N 注入区之间,并且环形注入位于每个NLDD区之下。当第一节点的电压超过击穿电压时,电流放电路径由对应的NLDD区和环形注入所限定。在一个具体实施例中,所述击穿电压小于逻辑门氧化物的击穿电压。
-
There are only two pins for the chip, a pin from the first to embark on the anticlockwise with the pin that the two figures, which indicated that the first column is the first face of the resistance, the second column, said second surface of the resistance value.
对于只有两面有引脚的芯片,从第一个引脚开始按逆时针方向的引脚用两列数字来表示,其中第一列表示的是第一面的阻值,第二列表示第二面的阻值。
-
From the second week on, the Apomorphine induced rotation behavior is detected once a week in the second, third, and forth week after the operation.
从术后第2周开始,分别于术后第二、三、四每周一次检测动物的Apomorphine诱导的旋转行为。
-
From the second week on, the Apomorphine induced rotation behavior is detected once a week in the second, third, and forth week aft...
从术后第2周开始,分别于术后第二、三、四每周一次检测动物的Apomorphine诱导的旋转行为。
-
Co-ordination between the railway company has four new Shenzhen Metro Corporation Board on the 1st line of the four target the installation of integrated electrical and mechanical equipment, Anhui Huadian Suzhou water pipeline project, the Shenzhen subway project between the installation of fire doors, Beijing Metro Line IV V standard integrated Electrical equipment installation and equipment engineering and environmental monitoring system, the Beijing Subway Line blanking integrated mechanical and electrical renovation project of Beijing Metro Line Willow on the 10th installation of depot facilities, the Beijing Olympic Park transport links underground access to install the Second Section of the Electrical and Mechanical Engineering , Baotou Coal Chemical Industry apotheosize the second installation of recycled water, the Beijing-Shanghai high-speed rail train Shanghai section.
公司先后配合中铁四局集团公司新建深圳地铁一号线四标的综合机电设备安装工程、安徽宿州华电给水管道工程、深圳地铁一期工程区间防火门安装工程、北京地铁五号线四标综合机电设备安装工程及环境与设备监控系统工程、北京地铁一号线综合机电消隐改造工程、北京地铁十号线万柳车辆段设备安装工程、北京奥林匹克公园地下交通联系通道二标段机电安装工程、包头神化煤化工第二循环水安装工程、京沪高铁上海动车段工程。
- 相关中文对照歌词
- Another Second To Be
- A Single Second
- Three Second Notice
- Second Guessing
- Second Coming
- In A Second
- Pulled Under 2000 Metres A Second
- Second Sunday
- The Second Time Around
- Second Intermission
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。