查询词典 second-class
- 与 second-class 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
According to the GPS receiver and the fathometer capability and requirement, the correlation index of data interface is: The sounding data is gathered 2 times per second, and GPS data is gathered 1 time per second.
按GPS接收机、测深仪的性能和要求,数据接口的相关指标设置为:水深数据每秒采集2次,GPS数据每秒采集1次。
-
M:Minutes later, the second plane hit the second tower. The fire ball ate up the aircraft.
几分钟后,第二架飞机撞上了第二座高塔,飞机被大火吞噬。
-
Second order incident boundary condition on fixed incident boundary is derived for numerical simulations, based on the cnoidal or sinusoidal motions of wave maker paddle, which shows that the prediction with second order incident boundary condition is more accurate than the prediction with first order incident boundary condition. 2 The analytical solution for higher-order Boussinesq equations is derived and its applicable range is discussed. 3 A 2-D fully non-linear numerical model using boundary element method is developed to obtain wave forces acting on rectangular obstacle. 4 The three-dimensional fully non-linear waves are studied in a numerical wave tank using finite element method.The studies on the coupled numerical model combined Boussinesq equations with Laplace equation are following.
非耦合非线性波浪计算模型:1 根据造波板做椭圆余弦运动或正弦运动速度,推导出数值模拟波浪水槽时固定入射边界上的二阶波浪入射边界条件,数值计算结果和实验结果的对比表明采用二阶入射边界条件对波面升高的预报比采用一阶入射边界条件对波面升高的预报更为精确;2 推导了波浪水槽造波板做正弦运动所产生波浪的高阶Boussinesq方程摄动展开解析解,讨论了该解析解的适用范围;3 对整个波浪水槽应用边界元方法数值模拟了波浪对物体的非线性作用;4 用有限元法求解三维Laplace方程模拟了三维完全非线性波浪水槽。
-
With the help of the fundamental theory to singular measure differential system, Green's function matrix expression of solution and well-posed boundary condition are given, together with discussing the properties of the Green's function matrix under the influence of impulsive effect In section 5, based on Lyapunov function method, we investigate that the existence of the first boundary value problem to second-order singular system by macthing the solutions to the second boundary value problem; and the existence and uniqueness of three-point boundary value problem to third order singular system by macthing the solutions to two-piont boundary value problem.
第五部分借助Lyapunov函数法,通过将第二类边值问题的解对结成第一类边值问题的解,得到了二阶广义系统的第一类边值问题解的存在性;通过将两点边值问题的解对结成三点边值问题的解,得到了三阶广义系统的三点边值问题解的存在性和唯一性。
-
She was the first Second Lady of the United States and the second First Lady.
她是美国历史上第一位副总统,第二位第一夫人。
-
According as different projection of point of fall for Rocket in XOZ quadrant, the correction points are searched with the method along OX axle for errors point of fall, first correction point is searched in first quadrant, second t correction point is searched in second quadrant, third t correction point is searched in third quadrant and so on.
该方法以炮弹落点在XOZ象限投影的不同,沿落点偏差轴OX 寻找推冲点:第一象限一次可寻找到第一修正点,第二象限则应寻找第二点,以至第三点。
-
The effect of different second ligand on the flourescent properties of polymers were studied. Then AxByEu/HTTA/PMMA was prepared using the best second ligand HTTA.
考察了不同的第二配体(咔唑、二甲基-联吡啶、邻菲罗啉、噻吩甲酰三氟丙酮HTTA)对脂肪酸铕聚合物发光性能的影响,选择出合适的第二配体HTTA,进而合成了A3Eu/HTTA/PMMA聚合物。
-
One newton is equal to a force of 100,000 dynes in the centimetre-gram-second system, or a force of about 0.2248 lb in the foot-pound-second English or U.S.
1牛顿等于公分-克-秒制中的100,000达因,或者英呎-磅-秒制中的大约0.2248磅。
-
Under the gravitational grasp of a large gang of galaxies, called the Fornax cluster, the small bluish galaxy is plunging headlong into the group at 600 kilometers per second or nearly 400 miles per second.
现在,这个 NGC1427A 星系正与星系间的气体产生摩擦,使其形状变得如此不规则,而在这过程中,新的恒生会以高速诞生。
-
The irregular galaxy NGC 1427A is a spectacular example of the resulting stellar rumble. Under the gravitational grasp of a large gang of galaxies, called the Fornax cluster, the small bluish galaxy is plunging headlong into the group at 600 kilometers per second or nearly 400 miles per second.
星系NGC 1427A就是这样的一个例子,在一个名为Fornax星群的一大群星系的引力场的作用下,这个小蓝星系正以600公里/秒(400英里/秒)的速度冲向星系群。
- 相关中文对照歌词
- Another Second To Be
- A Single Second
- Three Second Notice
- Second Guessing
- Second Coming
- In A Second
- Pulled Under 2000 Metres A Second
- Second Sunday
- The Second Time Around
- Second Intermission
- 推荐网络例句
-
And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.
同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。
-
Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.
运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。
-
If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.
如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。