查询词典 screw-driven
- 与 screw-driven 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
40Dry atlas specimens were used to measure anatomic data relative to screw placement technique with an electronic digital caliper and a goniometer.
用电子游标卡尺和量角器对40例干燥寰椎标本测量与进钉技术相关的解剖学数据。
-
A good-sized screw eye is fastened in the cross piece of the frame, and to this tie the ball.
一个相当规模的眼睛是固定螺丝在跨片的框架,以及这场比赛的球。
-
The company now has advanced production lines and a large sheet twin-screw granulation production lines.
公司现拥有先进的大型板材生产线及双螺杆造粒生产线。
-
Is the main production: plastic granulator, filling the vacuum with extrusion round, screw, barrel, and so on, through constant innovation and development, the company has accumulated a wealth of production experience.
主要是生产:塑料造粒机、灌带挤出成型真空轮、螺杆、机筒等,经过不断的创新和发展,公司已积累了丰富的生产经验。
-
When start the machine,screw off the grease cup downward two circles until it can not move ,Then refill the lubricating oil in the grease cup.
油杯中加满高温润滑油脂,每次开机前,将油杯向下旋两圈,到底后,重新将杯中加满润滑脂。
-
This paper focuses on the study of the driving system about twin screw grinder.
本文对双螺杆磨浆机的传动系统进行了较为深入的研究。
-
Beatrice Stanhope: Not as much as you will if you do anything to screw up my daughter's marriage to Lyle Van de Grot.
碧特丽斯·斯坦藿普:如果你坏了我女儿嫁给里尔·凡·迪·格罗特的婚事的话,你会更痛苦。
-
Connect ground wire to green ground screw.
将地线连接到绿色的底线螺丝上。
-
Our company solemnly promises: The products provided by our company, such as the bearing plate, net-contact basic prop steel plate built-in fitting; steel plate built-in fitting in protecting the shed of the bridge; gudgeon, screw nut and the back up in protecting the shed of the bridge, all follow strict profession standard regulations in the process of production.
本公司郑重承诺:我方提供的支座板、接触网支柱基础预埋钢板、防落梁预埋钢板、螺栓、螺母及防落梁挡块均严格按照行业标准之规定进行生产,对所供物资的原料采购,生产制造检验、到货服务进行全过程的质量管理。
-
If there is any quality problem during the process of use or the engineering operations of the bearing plate, net-contact basic prop built-in fitting; steel plate built-in fitting in protecting the shed of the bridge; gudgeon, screw nut and the back up in protecting the shed of the bridge, we will send project manager and SP technologists within 48 hours to the spot and get out the sample after receiving your notice.
若使用过程或工程运营过程中发现我单位所供的支座板、接触网支柱基础预埋钢板、防落梁预埋钢板、螺栓、螺母及防落梁挡块存在质量问题,我单位将在收到贵方通知之时起,48小时内派项目负责人和专业技术人员到达现场了解情况并提取样品,经相关检验部门认定为我公司产品质量问题后,由我方承担由此造成的一切直接经济损失,并负相应的法律责任。
- 相关中文对照歌词
- Go Screw Yourself
- The Legendary DJ Screw
- Screw Jams
- Screw You
- Screw You And Your Deep Blue Sea
- Screw
- The Turn Of The Screw
- Screw That
- R.I.P. Screw
- Forever Bangin' Screw
- 推荐网络例句
-
And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.
47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。
-
Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.
提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。
-
Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...
嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。