查询词典 scheduling
- 与 scheduling 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Considering just-in-time production, the mathematical model of flexible job-shop schedulingfor bi-objective is established. To solve the model, a genetic algorithm is developed. In this algorithm, a two-row chromosome structure is presented because of the special point of the model. At the same time, AOV network is applied to decode and compute the fitness function. Then selection, crossover and mutation operator of the genetic algorithm are designed. Finally, an example of job shop scheduling is shown.
同时考虑现代生产准时制的要求,建立了柔性作业车间调度问题的双目标数学优化模型,并给出了求解模型的遗传算法的具体实现过程;针对模型的特殊性,提出了染色体两层编码结构,将AOV网络图应用到解码和适应度函数的计算中,通过一个调度实例进行验证,给出了相应的选择、交叉、变异操作设计方案。
-
The model is expected to be an effective planning tool that can assist the carrier in flight scheduling and fleet routing during the transition of two connected seasons.
本研究利用时空网路技巧,配合现况班表与下一季规划的班表,建立一季节转换之飞航排程模式,求解在缓冲期中飞航排程的最佳衔接排程,以提升公司营运利润。
-
This paper has researched the airplane ground job operation using earliness and tardiness scheduling with distinct due windows,the mathematic model is established by fuzzy programming ,the uncertain processing time are denoted by the triangle fuzzy numbers,and simulation using particle swarm optimization is given to illustrate the efficiency of the presented models and the optimal algorithms.
对具有不同时间窗的提前/拖期调度方法应用于飞机地面作业调度进行了研究,用模糊规划建立数学模型,用三角模糊数表示了地面作业中时间的不确定性,应用粒子群优化算法对模型进行了仿真。
-
The existing protocols can't set appropriate time for every node to fuse data effectively, while providing great energy conservation and low latency. This paper proposed a strategy of data fusion based on cross-layer scheduling, which made a collision-free data transmission schedule and set appropriate waiting time for each sensor node according to the routing-tree.
针对现有的协议都不能在获得良好的节能效果和低延迟的同时,使每一个节点进行充分的数据融合的问题,提出一种基于跨层调度的数据融合策略,根据建立的路由树,制订无碰撞的数据发送调度方案并为每一个传感器节点设置合理的等待时间。
-
In a three-class construction supply chain which is composed by the raw material suppliers, the semi-manufactured goods suppliers and the contractors, there exist project scheduling problems related with the semi-manufactured goods suppliers and the contractors, so do raw material ordering problems which is related with the raw material suppliers and the semi-manufactured goods suppliers.
在一个组织结构确定的由原材料供应商-半成品供应商-承包商构成的三层工程供应链网络中,在半成品供应商和承包商之间存在工程调度的问题,在原材料供应商与半成品供应商之间存在原材料订货的问题。
-
Under this kind of test architectures, a good test resource distribution and test scheduling strategy will lead to a higher test efficiency.
在这种框架结构之下,测试资源的分配和测试调度的优劣将直接影响到SOC整体测试的效率。
-
Guangzhou Rubber Hose Factory main products are: enhance the type of high-pressure hose steel wire, fiber-type series wrapped around pipes, to attract and scheduling category suction hose type, transmission type of hose, all kinds of flange with the first row of the large-diameter suction hose, aircraft refueling tube, refueling hose, metallurgical industry-specific management, oil drilling pipe, gas hose, steam hose, sand blasting hose and all kinds of hose assembly.
广州胶管厂主要产品有:钢丝增强类高压胶管、纤维编缠类胶管、吸引类及排吸类胶管、输送类胶管、各种带法兰头的大口径排吸胶管、飞机加油管、加油机胶管、冶金行业专用管、石油钻探管、煤气胶管、蒸汽胶管、喷砂胶管及各类胶管总成。
-
The LPV models of ship steering and main engine speed were established depending on ship speed etc as the scheduling parameters.
船舶航向与柴油机推进装置是紧密耦合的,但长期以来对它们的控制是完全独立的。
-
Substation automation is the secondary substation equipment (including measuring instruments, signal systems, relay protection, automatic devices and remote devices, etc.) through a combination of functions and optimize the design, use of advanced computer technology, modern electronic technology, communication technology and signal processing technology, on all major substation equipment and transmission and distribution lines of automatic monitoring, measurement, automatic control and computer protection, and integrated communications and scheduling automation features.
变电站综合自动化是将变电站的二次设备(包括测量仪表、信号系统、继电保护、自动装置和远动装置等)经过功能的组合和优化设计,利用先进的计算机技术、现代电子技术、通信技术和信号处理技术,实现对全变电站的主要设备和输、配电线路的自动监视、测量、自动控制和微机保护,以及与调度通信等综合性的自动化功能。
-
This paper emphasizes on the production system of SMT, studying the single process of the parallel-machines, mix the total completed time of the short-termed production scheduling, achieving higher utilization of machines.
论文以PCBA制造业中SMT工段生产系统为主要研究对象,研究了单制程平行机台条件下,以最小化任务完成时间为目标的短期排程问题,以实现按时交货,并提高机器利用率。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。