英语人>网络例句>schedule 相关的网络例句
schedule相关的网络例句

查询词典 schedule

与 schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]

On this condition, we design the first step of MIS software architecture that center on material flow management for making zero stock, create data dictionary and develop MRP model block, it includes BOM management, material requirement planning, master production schedule and purchase planning etc.

在此基础上,设计了以实现零库存为主要目标,物流管理为中心的内江峨眉柴油机厂MIS第一期的应用软件结构,建立了相关的数据字典,完成了MRP模块以及相关的模块,包括BOM维护、主生产计划制订和采购计划制订等功能。

This, originates from the master production schedule by utilizing static ERP data, such as BOM, routing, working center and dynamic data, for instance, purchase orders, inventory information, material requirement plan, capacity requirement plan to coordinate the material flow and capacity load so as to have them strike a good status.

这两项工作都是从主生产计划入手,利用 ERP 的静态数据如 BOM、工艺路线、工作中心以及动态数据如销售订单、库存信息、物料需求计划、能力需求计划来完成对物流以及产能的调度,从而达到产能负荷的平衡与物流的准时。

With the guidance of system functional target, researches and develops theplanning management system, designs its main functions, analyzes the making flow of Master Production Schedule and Material Requirement Planning in detail, balances the Planning control and agile manufacture, describes the designing process of production management database, presents its E-R graph and main basis tables of database.

根据系统功能目标,研究开发了计划管理系统,设计了计划管理系统的主要功能,对主生产计划、物料需求计划的制定流程进行了详细分析,实现了计划控制与灵活生产的有机结合。对生产管理数据库的设计过程作了详细的阐述,给出了生产管理系统E—R图和主要的数据库基表。

A synthetic model of multi-level production planning and control integration is brought forward, which integrated Master Production Schedule , Material Requirements Planning , Shop Floor Control , order acceptance control, order release control and process control into a whole. Besides, a new method of production management—— Theory of Constraints is introduced into the traditional MRP, and a method to integrate TOC with MRP is put forward. As a result, a system of production planning management for ceramics enterprise is developed. Then several problems of shop planning and control for ceramics enterprise including the modeling of production line, the optimized utilization of kiln, the complement and due-date of products are discussed. A mathematical programming model of equalization production for ceramics production line is set up. An optimized model is put forward, which uses genetic algorithm to solve the sequencing problem of ceramics before the kiln.

以生产计划与控制的集成为目标,提出将一个企业中的主生产计划、物料需求计划、车间作业计划与接受订单控制、投料控制与生产控制集成的多级生产计划与控制的总体模型,将一种新的生产管理方法——约束理论引入传统的MRP中,提出了实现TOC和MRP集成的具体方法;针对陶瓷企业的特点,为重庆兆瓷研制了一套陶瓷企业生产计划管理系统;并对陶瓷企业车间计划与控制中的一些具体问题进行了研究,建立了陶瓷生产线均衡生产的数学规划模型,就窑炉的优化利用、产品配套和交货期问题、陶瓷生产线的能力平衡等问题进行了研究。

This model includes a bid construction model. According to the buyer's demand, Supplier will find out a production plan based on the master production schedule and available-to-promise inventory that produces the lowest total production cost.

为上层买方决定分配给各个供应商的采购数量,并为下层供应商制定适当的投标决策,并结合遗传演算法做为最佳化搜寻工具,期望可以最小化买方的平均单位竞标价格或是交付延迟时间。

The absolute solution of Jiaojia ERP is put forward, the system models are established, and the solution are explained in detail. The business program of Jiaojia gold mine is reengineered based on the theory of "business centers", and the program-oriented compressed organization is framed. The index group and the solution of mine total quality management are setup. Then the optimize program of SCM and its components are designed on the guidance of "Horizontal Integration". The data of Jiaojia gold mine are reengineered based on the data warehouse technology. The information integration can be available after the establish of the business oriented databases, the subject integration oriented data marts, the application oriented data warehouses, the code databases and metadata, as weil as the OLAP system. The mathematics models and data mining modes are set up to function for the decision support of ERP system. The model of programming Master Production Schedule driven by geological resources and marked is figured out, so as to the models for material requirements planning and other decision supports are set up. The models provide service in forms of model storehouse, method storehouse, and algorithm tools center. The agent center is introduced to process the models' organizing, service, as well as self-study. The function system of Jiaojia gold mine ERP is figured out. By combining the development characteristics of Clients/Server and Browse/Server, the general framework and every sub systems are described in detail, including the function, structure, arrangement, modality, and so on.

主要内容如下:(1)深入论述了黄金矿山实施ERP的可行性,并结合应用需求将ERP理论在深度和广度上进行了拓延,建立了黄金矿山ERP系统的理论基础:以资源与市场共同驱动的供应链管理;黄金矿山的双重物流体系;以地质资源有效利用为目标的生产控制体系;黄金矿山财务管理的成本控制核心理论等;(2)提出焦家金矿ERP系统的整体解决方案,构建ERP系统模型,并进行了细节方案的设计:基于"作业过程核心"理论重新规划焦家金矿的业务流程,在此基础上设计面向流程的"扁平化"组织机构;建立了矿石全面质量管理的指标体系和实施方案;以"横向一体化"为指导思想,提出供应链管理各组成部分的全面优化方案;(3)以数据仓库技术为核心完成焦家金矿的数据规划,分别建立面向业务的数据库、面向主题集成的数据集市和面向主题应用的数据仓库,设计代码数据库和元数据库,定义OLAP方式,实现焦家金矿的全面信息集成;(4)针对ERP系统中的决策支持功能,建立了相应的数学模型和数据挖掘模型,提出了地质资源和市场共同驱动的主生产计划模型制定过程,进一步建立了物料需求计划的线性规划模型,以及其它决策支持模型;提出以模型库、方法库和算法工具为核心的模型服务方式,并设计了代理机制完成模型的组织、服务和自学习过程;(5)构建焦家金矿ERP系统的功能体系,针对C/S和B/S模式系统的开发特点,分别对功能体系架构以及各子系统的功能、结构、层次和形式进行详细设计。

Iii. The paper studies and determines the improvement modes of the systems, designs the establishment principle, the project and the format of master planning schedule and establishes the improvement projects of material requirements planning.

设计了系统改进的模式,建立了相应的编制原则;根据济发生产实际,创建了主生产计划和物料需求计划的编制方案和格式,并对方案的编制方法进行了详细地研究和例证。

Canton a lot of time has long failed to materialize on schedule, even to the individual 8-10 years.

广东了大量的时间一直没有兑现的时间表,甚至个别8-10年。

Mr. Matthews, I'll give you this schedule.

马瑟先生,我先把这份表格交给你。

If Mayne liked what he heard, he'd approve it and the record would be released on schedule.

如果 Mayne 满意了,唱片就能按时发行。

第54/100页 首页 < ... 50 51 52 53 54 55 56 57 58 ... > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力